1 / 9

Date: 2014-01-09

IEEE 802.11aj Task Group January 2014 Closing Report. Date: 2014-01-09. Authors:. Abstract. This document is the closing report for IEEE 802.11aj Task Group for the January 2014 session in Sanya China. Work Completed (1/3).

pakuna
Download Presentation

Date: 2014-01-09

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.11aj Task Group January 2014 Closing Report Date:2014-01-09 Authors: Xiaoming Peng

  2. Abstract This document is the closing report for IEEE 802.11aj Task Group for the January 2014 session in Sanya China. Xiaoming Peng

  3. Work Completed (1/3) • Proposal of RoF Relay Transmission Usage Model (11-14/014r0) • Update on Opportunistic Transmissions in Multiple Alternative Channels in 802.11aj (NT) - 11-13/1293r3 • To respond to the question raised up during November meeting • Update on Spatial Sharing Mechanism in 802.11aj (NT) – 11-14/0009r1 • To respond to the questions raised up during November meeting • Update on TGaj Complete Proposal Presentation (CP) 11-13/1301r2 • To respond to the questions raised up during November meeting Xiaoming Peng

  4. Work Completed (2/3) • TGajComplete Proposal Text 11-13/1302r1 • Make necessary change based on the comments and generate a specification draft D0.01 • Motion to approve Complete Proposal and Text as the baseline proposal • Do you support adopting the complete proposal in 802.11-13/1301r2 and 802.11-13/1302r2 as the baseline specification for the TGaj (60GHz) amendment? • Moved by: Jiamin Chen • Seconded by: PNG, Khiam Boon • Results:  Y 19  N  0  Abstain3 • Motion passed Xiaoming Peng

  5. Work Completed (3/3) • Large-Scale Characteristics of 45 GHz Based on Channel Measurement (11-14/015r1) • SEU will generate Matlab code for the channel model of 45GHz and share more details in the coming March meeting in Beijing • Reviewed the official timeline for TGaj in 11-13/0437r1 • The time slot for 802.11aj TG in LA interim session has been cancelled. Xiaoming Peng

  6. Motion To approve IEEE 802.11aj specification draft D0.01 as baseline for TGaj technical specification for 60GHz Mover: Bruce Kraemer Seconded: Chen Qian Result: Y: 21 N:0 A:0 Motion passed Xiaoming Peng

  7. Next Meeting • Next TGaj meeting will be co-located and held on Mar 16 – 21, 2014 in Beijing China • http://www.ieee802.org/11/Meetings/Meeting_Plan.html • Meeting Venue: China World and Traders Hotel, Beijing, China • Registration Fees & Deadlines: • Early:  Before 6pm Pacific Time, Friday, February 7, 2014(UTC Time: 2am Saturday, February 8, 2014) * $US 600 for attendees staying at the China World or Traders Hotel Beijing* $US 900 for all others (including local attendees not staying at the group hotel)  • Late/On-site:  After 6pm Pacific Time Friday February 7, 2014(UTC Time: 1am Saturday, February 8, 2014) * $US 800 for attendees staying at the China World or Traders Hotel Beijing* $US 1100 for all others (including local attendees not staying at the group hotel) Xiaoming Peng

  8. Goals for March 2014 Meeting • Review and process comments from TG review fromDraft Specification (60GHz) D0.01 • Issue Call for Proposal (45GHz) • New Submissions Xiaoming Peng

  9. Conference call times • February 27, 2014 ET 7pm • Beijing Time: February 28, 2014 8am • March 6, 2014 ET 7pm • Beijing Time: March 7, 2014 8am Xiaoming Peng

More Related