An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BIOKOS - Project KA408 Karelia ENPI CBC Program Bioforum 18th of June Regional Council of Kainuu / Sanna Nikola-Määttä

  2. Content • Project • Partners • Project Steps • Specific in BIOKOS • Benefits of the BIOKOS Regional Council of Kainuu / Sanna Nikola-Määttä

  3. Project • BIOKOS: bioenergy plant to Kostomuksha • Years 2013-2014 • Budget 1 099 960 EUR • Investment project, target to build 1 MW CHP plant • Technology is based on gasification, raw materials are sludge and wood chips • Plant will be built in connection to water treatment plant Regional Council of Kainuu / Sanna Nikola-Määttä

  4. Partners • Regional Council of Kainuu, Lead Partner • Kostomuksha Urban District, will own the plant and biggest own-funding • PlaNomaTmi, head planning of the plant • RecyclingEnergyInt.Corp., technology of the gasification • MUP Teploseti, design and construction of infrastructure • OOO AplSov, supply of wood chips and transportation Regional Council of Kainuu / Sanna Nikola-Määttä

  5. Project Steps Regional Council of Kainuu / Sanna Nikola-Määttä

  6. Specific in BIOKOS • Plant delivery and investment project • Supply Chain Management • Equipment/manufacturing, automation, technology all together • Technical Requirements from Russian / The Custom Union’s legislation • New requirements or coming new requirements notice EU regulation like ATEX 94/9/EY, Machinery Directive 2006/42/EY etc. • Quality Control of Manufacturing • Certification by third party (accredit by Russians requirements) • Export/Import to Russia • The first plant using both technologies together, dryer and gasification • Schedule and budget is limited • Manufacturing, testing, transportation and customs, installation and start-up must do during project schedule and under the budget • Project ends 31th of December 2014, no costs to project after that • Planning, Dimensioning, Risk management, Supply Chain Management, Quality Control of Manufacturing, Co-operation with Supplies and Partners! => Only way is to do right things on right time and succeed Regional Council of Kainuu / Sanna Nikola-Määttä

  7. Benefits of the BIOKOS • Concrete project which increases using of bioenergy in Karelia • Finnish innovations • Thermal Dryer • Gasification • Raw materials are sludge and wood chips • Remaining ash is a form of granular • Possibilities to develop new ash solutions for different applications: it depends on physical, chemical and mineralogy properties of ash • In business, it creates policies and management model for any further supply of the future Regional Council of Kainuu / Sanna Nikola-Määttä

  8. More information • Project Manager Sanna Nikola-Määttä tel. +358 44 410 0745 or sanna.nikola-maatta@kainuu.fi • www.biokospower.com Regional Council of Kainuu / Sanna Nikola-Määttä