An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASSOCIATION OF MUNICIPAL ELECTRICITY UTILITIES OF SOUTHERN AFRICA GOOD HOPE BRANCH: WESTERN CAPE 15 AUGUST 2014: LANGEBERG MUNICIPALITY: ROBERTSON By: Joe Renney & Leon Eksteen

  2. OVERVIEW MIG PROJECT NOTICE BOARD MISA CAPACITY BUILDING (COURSES) UMGENI WATER SPORT FIELD LIGHTING: NORMS & STANDARDS HUMAN SETTLEMENTS: NORMS & STANDARDS INTERNAL WIRING / SUBSIDY. MASTER PLANS: R1 M – 2014 MIG POLICY REVIEW

  3. o

  4. MISA COURSES ELECTRICAL ENGINEERING COURSES

  5. Whatever happened to ? Planning Scheduling Resources Supervision Re-commissioning Close-out

  6. UNSAFE WIRING PRACTICES

  7. TN-C-S SYSTEM EARTHING T stands for “Terra” which is Latin for “Earth” N means that the connection to “Earth” is via the supply network C stands for “COMBINED” in relation to the neutral & earth S stands for “SEPARATE” …………………. S……”SEPARATE” M SANS 10142-1 “COMBINED” N T…….”EARTH”

  8. UNSAFE WIRING PRACTICES 11 FAULTS MAINS CONNECTED DIRECTLY ONTO BUSBARS. 2. THIS IS A TN-C-S SYSTEM EARTHING (NO CONNECTION BETWEEN E AND N. 3. 4. & 5. NO PROTECTION FOR CHOKES / BALLASTS. 6 & 7 WIRING ONTO MCB: LINE AND LOAD NO NEUTRAL SURGE PROTECTOR AN EARTH BRIDGE IS REQUIRED FOR THE SPD’s MAIN SUPPLY CONNECTED DIRECTLY ONTO BUSBARS THIS IS A TN-C-S SYSTEM EARTHING. NO PROTECTION FOR CHOKES/BALLASTS (3) INCORRECT WIRING…LINE / LOAD (2) NO NEUTRAL SURGE PROTECTOR A SOLID EARTH BRIDGE IS REQUIRED ON SPD’S NO CONCRETE BASE FOR KIOSK

  9. MAIN

  10. HUMAN SETTLEMENTS NORMS & STANDARDS SUBSIDY VALUE

  11. MASTER PLANNING2014 / 15 BITOU & BERGRIVIER ± R1 m

  12. Boxes are not to scale. Break up Consolidate 2.1 Break MIG into sector grants 2.2 Make MIG a Schedule 7 grant 2.3 Ring-fence each MIG component 2.4 MIG for ‘plot package’ only 2.6 As envisioned in Policy 2.5 Current Water and sanitation Water and sanitation Roads Solid waste Public services Water and sanitation Water and sanitation Roads Solid waste Water and sanitation Electricity Roads Solid waste Public services Water and sanitation Roads Solid waste Roads Roads Solid waste Solid waste Public services Public services Public services Public services Implementing agent Municipality Municipality Municipality Municipality Possibly with inclusion of electricity as well Municipality Note that ‘Public services’ refer to community services, sports and recreation, emergency services and public transport.

  13. Did u know that: 1. The pleasure of making love in the dark is 10 times stronger than when the lights are on? 2. Taking a bathat the same time with your partner increases your love by 20 times?

  14. Don't get excited. . . This is an advert by Eskom & Department of Water Affairs to save Electricity and Water.