1 / 7

NEU2012 towards a concrete proposal by the neutrino community.

NEU2012 towards a concrete proposal by the neutrino community. (or: Laguna, EUROnu and others together). -- Test beam -- Road map -- “little neutrino beam” -- “bigger neutrino beam” -- Technical accelerator R&D. TEST BEAM. Seems an obvious case:

phoebe
Download Presentation

NEU2012 towards a concrete proposal by the neutrino community.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEU2012 towards a concrete proposal by the neutrino community. (or: Laguna, EUROnu and others together) -- Test beam -- Road map -- “little neutrino beam” -- “bigger neutrino beam” -- Technical accelerator R&D Alain Blondel 28 September 2010 NEU2012 -- discussion

  2. TEST BEAM Seems an obvious case: around H8 magnet test WC, LArg and TASD prototypes with the MIND prototype as muon catcher/spectrometer -- TASD (and LArg?) in magnetic field? Already some money from AIDA for some basics action: draft proposal by end of november 2010 submission end of year closure of CERN beams in 2012 forces us to recast program 2010 write proposal to CERN for use of test beam before Xmas 2011-Q1 kick off meeting 2011-Q3 first test with baby-INO but need muons of 1-2 GeV… 2012 construction and cosmic tests of TASD and MIND detectors 2013 fuller tests in NH Alain Blondel 28 September 2010 NEU2012 -- discussion

  3. ROAD MAP document endorsed by community would be of great help timescale? responsibility? Alain Blondel 28 September 2010 NEU2012 -- discussion

  4. Small neutrino beam at CERN” e.g. at PS proposal: a near detector scintillator based and a far detector Larg based enough to do or die for the LSND effect Enough to measure cross-sections in LArg and compare with scintillator with high precision. Enough to perform a detailed scan of low energy cross-sections pass muon and pion threshold. should we try (chance of CERN refusal are not negligible) Alain Blondel 28 September 2010 NEU2012 -- discussion

  5. Study of ‘big beam’ pro: concrete proposal that has some chance on a long time scale Con 1. The CERN SPC report clearly points to competition from Japan and US con2: is this not in the way of a bigger picture? Is it obvious that 100 kton of LArg can be made so much sooner than a neutrino factory? Synergy with neutrino factory (in case of 2300 km beam line) of beta-beam (for the short baselines) is important. Also stressed in the SPC report (below) Any way to make it appear in the LBNO proposal? Alain Blondel 28 September 2010 NEU2012 -- discussion

  6. Alain Blondel 28 September 2010 NEU2012 -- discussion

  7. Technical accelerator R&D There are very good synergies between CLIC and Neutrino Factory In particular field emission by RF cavities in intense electric and magnetic field (MOU with Fermilab on collaboration on this subject) Could the NA test be a beginning of this? Other possibilities involve simulation tool and diagnostic tools worshop etc… Alain Blondel 28 September 2010 NEU2012 -- discussion

More Related