1 / 18

Moores Creek and Meadow Creek: Sediment TMDL Revisions

Moores Creek and Meadow Creek: Sediment TMDL Revisions. Technical Advisory Committee Meeting Gene Yagow June 24, 2014. Changes. Updated MS4 boundaries using 2010 CUA and latest City of Charlottesville boundary. Revised Moores Creek watershed boundary

purity
Download Presentation

Moores Creek and Meadow Creek: Sediment TMDL Revisions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Moores Creek and Meadow Creek: Sediment TMDL Revisions Technical Advisory Committee Meeting Gene Yagow June 24, 2014

  2. Changes Updated MS4 boundaries using 2010 CUA and latest City of Charlottesville boundary. Revised Moores Creek watershed boundary Revised VDOT corridor width (20 m total)

  3. Impaired Segments and Watersheds New MS4/Old UGA Boundaries

  4. Overlapping MS4 Boundaries

  5. Dan’s Map

  6. Greg’sMap

  7. MS4 and ISWGP Areas (approx.)

  8. Changes in Land Use Distribution 2012 vs 2014 TMDL Modeling 2014 AllForX vs TMDL Modeling

  9. AllForX Sediment Endpoints

  10. Selected AllForX Comparison Watersheds

  11. Initial Regression Rural Urban Two comparison watersheds not appropriate. Distinct separation of impaired watersheds. All loads calculated using 2009 NASS land use data.

  12. Final Regressions Rural Urban

  13. Sediment TMDL and MOS Endpoints All loads calculated using 2009 RRBC/NASS land use data.

  14. Changes in Simulated Results

  15. Next Steps • Clarify MS4 boundaries • Revise TMDL load simulations • Boundary re-adjustments • Incorporate BMPs, effective June 2012 • Create load reduction (allocation) scenarios • Write and submit draft TMDL report for comment

  16. Project Timeline • TMDL • Next TAC Meeting? – discuss allocations • Final Draft TMDL submitted to DEQ: September 30th • Implementation Plan (IP) • Oct-Dec 2014: Update of local BMP inventories • Jan-Feb 2015: Model revisions to IP

  17. Contact Information: Gene Yagow Biological Systems Engr. Dept. Virginia Tech eyagow@vt.edu540-231-2538 ftp://bsesrv214.bse.vt.edu/Yagow/VRO1_AllForX/

More Related