1. TYP Y ZBIORNIKÓW WG BS 7777 Część 1 Se kcja 3 - Defini cje

1. TYP Y ZBIORNIKÓW WG BS 7777 Część 1 Se kcja 3 - Defini cje. Pełnokomorowy ( Full Containment ). Typ Zbiornika :. Zbiornik pojedynczy. D wu-komorowy. Definiti nicje.

rafe
Download Presentation

1. TYP Y ZBIORNIKÓW WG BS 7777 Część 1 Se kcja 3 - Defini cje

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1. TYPY ZBIORNIKÓW WG BS 7777 Część 1 Sekcja 3 - Definicje Pełnokomorowy (Full Containment) Typ Zbiornika : Zbiornik pojedynczy Dwu-komorowy Definitinicje Tylko Zbiornik wewnętrzny powinien spełniać warunekniskotemperaturowej ciągliwości w trakcie magazynowania produktu LNG. Zbiornik zewnętrzny stalowy pomieścić i chronić izolację kriogeniczną oraz pomieścić opary gazu , lecz nie rozlany produkt LNG .. Zarówno Zbiornik wewnętrzny jak i zewnętrzny powinny niezależnie od siebie pomieścić LNG .W celu minimalizacji obszaru wycieku , Zbiornik zewnętrzny jest zlokalizowany w odległości niewiększej niż 6 meterów. Zbiornik wewnętrzny zawiera produkt LNG w warunkach eksploatacyjnych .Celem Zbiornika zew. jest pomieszczenie wycieku LNG ze Zbiornika wewnętrznego, a nie oparów z wycieku. Pełnokomorowy zbiornik jest tak skonstruowany, że zarówno zbiornik wewnętrzny jak również zew. są w stanie pomieścić rozlany LNG. Zbiornik zew. jest odpowiednio zaprojektowany do pomieszczenia zarówno rozlanego LNG jak również kontrolowanego usuwania powstałych oparów

  2. OPARY OPARY OPARY Zadaszenie p. deszczowe LNG LNG LNG OPARY OPARY OPARY OPARY OPARY WYCIEK WYCIEK WYCIEK LNG LNG LNG BUND WALL 1.Typy zbiorników LNG wg BS 7777 Część 1 Sekcja 3 - Definicje Pełno komorowy (Full Containment) Jednokomorowy Dwukomorowy Typ Zbiornika Normalne Warunki pracy Wyciek ze Zbiornika wewnętrznego

  3. Jednokomorowy - 1 Jednokomorowy - 3 Jednokomorowy - 2 OBWAŁOWANIE OBWAŁOWANIE OBWAŁOWANIE Zmniejszanie wymaganej powierzchni obwałowania poprzez podnoszenie wysokości obwałowania Dwukomorowy Pełno komorowy Zadaszenie p. deszczowe Zadaszenie p. deszczowe Stalowy zbiornik zewnętrzny może być również pojem.nikijem dla LNG Ściana ze sprężonego betonu Stalowy zbiornik zewnętrzny może być również pojem.nikijem dla LNG Zbiornik ze sprężonego betonu Dach betonowy Zadaszenie p. deszczowe ściana betonowa z nasypem ziemnym . Rolę obwałowania pełni zb. ze spręż. betonu. ściana betonowa z nasypem ziemnym 1.OBWAŁOWANIA & TYPY ZBIORNIKÓW

  4. Izolacja termiczna luzem, zasypowa Zewnętrzna bariera p.wilgotościowa Zb. zewnętrzny Zb. zewnętrzny Izolacja termiczna luzem, zasypowa Izolacja termiczna Membrana z izolacja termiczną Dach Membrana z izolacja termiczną zadaszenie p. deszczowe Zadaszenie Zbiornik wewnętrzny Zbiornik wewnętrzny Zbiornik wewnętrzny Izolacja dna Izolacja dna Płyta fundamentowa z podgrzewaniem dna Płyta fundamentowa z podgrzewaniem dna Płyta fundamentowa z podgrzewaniem dna ściana ze sprężonego betonu Ściana betonowa w ziemi Zewnętrzny zb. stalowy CZĘŚĆ METALOWA :IZOLACJA TERMICZNA BETON 1.Przykłady – Zb. dwukomorowewg BS 7777 Rys zalecane zalecane Zastosowanie: Nie zalecane z uwagi.na wysoki zakres BOG .

  5. Żelbetowy zb. zewnętrzny mogący pomieścićLNG Stalowy zbiornik zew. mogący pomieścić LNG Stalowy zbiornik zew. mogący pomieścić LNG Lużno zasypana izolacja Lużno zasypana izolacja Lużno zasypana izolacja Membrana z izolacją termiczną Membrana z izolacją termiczną Membrana z izolacją termiczną ZB. WEWNĘTRZNY ZB. WEWNĘTRZNY ZB. WEWNĘTRZNY Izolacja dna Izolacja dna Izolacja dna podgrzewana płyta fundamentowa podgrzewana płyta fundamentowa podgrzewana płyta fundamentowa Uwaga: ostatnie rozwiązania projektowe bazują na wykonaniu podwójnego dna zbiornika połączonego z płaszczem zbiornika z 9% Ni stali i odp. zabezpieczenie. izolacją termiczną oraz.p. wilgociową izolacja termiczna zb. zewnętrznego izolacja termiczna wew. zb. zewnętrznego izolacja termiczna zb. zewnętrznego : część metalowa izolacja termiczna :beton 1.PRZYKŁADY- Zbiorniki pełnokomorowe (Full Containment)wg BS 7777 e

  6. INNER TANK INNER TANK Dwu-komorowy Rys.1 TYPY ZBIORNIKÓW LNG Zbiornik pojedynczy Pełnokomorowy Inne Stalowy zbiornik zewnętrzny Zbiornik podwójnie stalowy Zbiornik naziemny - Membranowy Pojedynczy zbiornik stalowy Zbiornik zewn. Ze spręż. betonu Zbiornik podwójnie stalowy z dachem na zb. wewnętrznym Ściana Zbiornika . zewn. ze spręż. betonu Zbiornik ziemny - Membranowy Zbiornik zewn. betonowy + Obwałowanie ziemne Zbiornik podwójnie stalowy z dachem podwieszanym Zbiornik ziemny Typ Japoński Zbiornik zewn. betonowy + Obwałowanie ziemne

  7. RYS. - 1 : TYPOWY NAZIEMNY ZBIORNIK MAGAZYNOWY LNG PODNOŚNIK DO MONTAŻU POMPY POMST DACHOWY WENTYLACJA PRZESTRZENI DACHU PODCIŚNIIENIOWY ZAWÓR BEZPIECZEŃSTWA GLOWICA RURY PRZESYŁOWEJ IZOLACJA TERMICZNA MEMBRANY PPLATFORMA POMOST DO OBSŁUGI DACHU DACH ZBIORNIKA KRÓCIEC WENTYLACYJNY MEMBRANA PŁASZCZ OSŁONOWY DRABINA WLAZOWA PIONOWA RURA PRZESYŁOWA DRABINA EWAKUACYJNA INSTALACJA CHŁODZENIA PLASZCZ ZBIORNIKA Z 9% Ni STALI ZBIORNIK ZEWNĘTRZNY IZOLACJA TERMICZNA Schody RURA PRZESYŁOWA RURA DO OSUSZANIA I USUWANIA GAZU OBWAŁOWANIE ZB. RURA SSĄCA Z ZAWOREM ZWROTNYM DNO ZB. WEWN. ZE STALI 9 %Ni SYSTEM GRZEWCZY DNA ZB. PIERŚCIEN NAROŻA DNA ZBIORNIKA PŁYTA FUDAMENTOWA IZOLACJA TERMICZNA DNA

  8. Fig. - 2.1 : : MEMBRANE TANK : ABOVE GROUND - TYPICAL PODNOŚNIK DO MONTAŻU POMPY ROOF WALKWAY VENT FOR DOME SPACE PRESSURE & VACUUM RELIEF VALVES PUMP COLUMN HEAD DECK INSULATION MAIN PLATFORM PERIFERAL ROOF WALKWAY CS ROOF & STRUCTURE CS WEATHER COVER DECK VENT SUSPENDED DECK RESILIENT BLANKET INNER LADDER RISER PIPES & SUPPORTS ESCAPE LADDER COOL DOWN PIPING 9% Ni INNER TANK WALL CS OUTER WALL ANNULAR SPACE INSULATION STAIRCASE PUMP COLUMN PC OUTER WALL DRYING & PURGING LINE IN TANK PUMP & FOOT VALVE 9% Ni INNER TANK BOTTOM BOTTOM HEATING SYSTEM INNER TANK FOUNDATION RING RC SLAB FOUNDATION BOTTOM INSULATION

  9. G.L. RYS. - 1.2 : JEDNOKOMOROWY – ZBIORNIK WEW. I ZEW. METALOWY – PIERŚCIEN NAROŻA DNA ZBIORNIKA CONCRETE SLAB FOUNDATION ŚCIANA STALOWA ZB. ZEWNĘTRZNEGO KOC ELASTYCZNY 9% Ni ŚCIANA ZB. WEWNĘTRZNEGO PRZESTRZEN PIERŚCIENIOWA. MATERIAŁ IZOLACYJNY:PERLIT CIĘGNA KOTWIĄCE DNO ZB. WEWN. ZE STALI 9% Ni PIERŚCIEN FUDAMENTOWY ZB. WEWWN. STALOWE DNO ZB. ZEWN.. INSTALACJA PODGRZEWANIA FUNDAMENTU MATA SZKLANA PŁYTA FUNDAMENTOWA IZOLACJA Z WATY SZKLANEJ WYLEWKA BETONOWA

  10. Fig. - 2.2 : DWU-KOMOROWY ZBIORNIK ZIEMNY PODNOŚNIK DO MONTAŻU POMPY POMST DACHOWY WENTYLACJA PRZESTRZENI DACHU ZAWORY BEZPIECZEŃSTWA CIŚNIENIOWE I PODCIŚNIENIOWE PUMP COLUMN HEAD IZOLACJA MEMBRANY POMOST GLÓWNY POMST DACHOWY KONSTRUKCJA DACHU & STALOWE KROKWIE STALOWA OSŁONA P. DESZCZOWA POMOST DLA ORUROWANIA KROCIEC WENTYLACYJNY DACH PODWIESZANY KOC OSŁONOWY DRABINA ORUROWANIE DO OZIEBIANIA ZBIORNIKA PŁASZCZ ZB. WE9WNĘTRZNEGO-9% Ni STALOWY PŁASZCZ ZB. ZEWWN. IZOLACJA PRZESTRZENI PIERŚCIENIOWEJ RURA TŁOCZNA NASYP ZIEMNY ŚCIANA BETONOWA PRZEWÓD DO OSUSZANIA I PRZEDMUCHIWANIA POMPA LNG & ZAWÓR ZWROTNY DNO ZB. WEWNĘTRZNEGO-9% Ni INSTALACJA PODGRZEWANIA DNA PIERŚCIEN NAROŻA DNA ZBIORNIKA PŁYTA FUNDAMENTOWA ŻELBETOWA IZOLCJA DNA ZBIORNIKA

  11. Fig. - 3.2 : PEŁNOKOMOROWY - PŁASZCZ ZEWN. ZE SPRĘŻ. BETONU-PIERŚCIEN NAROŻNY DNA ZBIORNIKA KANAŁ STRUNOWY DO SPRĘŻ. PIONOWEGO BARIERA DLA OPARÓW ZE STALI WĘGLOWEJ ZB. ZEWN. – POBOCZNICA ZE SPRĘŻ. BETONU KOC ELASTYCZNY KANAŁ STRUNOWY DO SPRĘŻ. POZIOMEGO POBOCZNICA ZB. WEWN. - 9% Ni ZABEZPIECZENIE NAROŻA ZE STALI 9% Ni PRZESTRZEN PIERŚCIENIOWA. MATERIAŁ IZOLACYJNY:PERLIT DNO ZB. WEWN. - 9% Ni WATA SZKLANA PIERŚCIEŃ FUNDAMENTOWY ZB. WEWN. INSTALACJA PODGRZEWANIA FUNDAMENTU MATY Z WATY SZKLANEJ G.L. MATA SZKLANA PŁYTA FUNDAMENTOWA WYLEWKA BETONOWA IZOLACJA Z WATY SZKLANEJ

  12. Fig. - 3.3 :TYPOWA PACHWINA SKLEPIENIAPEŁNOKOMOROWEGO ZBIORNIK A LNG – ZB. ZEWN. ZE SPRĘZ. BETONU CONCRETE SLAB FOUNDATION POSZYCIE DACHU ZE STALI WĘGLOWEJ DACH ZB. ZE STALI WĘGLOWEJ KRÓCIEC DO ZASYPKI PERLITEM KOPUŁA DACHU KANAŁ STRUNOWY DO SPRĘŻ. PIONOWEGO PERLITE RETAINING WALL DACH PODWIESZANY PRZESTRZEN PIERŚCIENIOWA. MATERIAŁ IZOLACYJNY:PERLIT STALOWA PRZEGRODA P. OPAROM KANAŁ STRUNOWY DO SPRĘŻ. POZIOMEGO IZOLACJA NA DACHU PODWIESZANYM- PERLIT LUB WŁÓKNO SZKLANE POBOCZNICA ZB. ZEWN. PRZESTRZEN PIERŚCIENIOWA. MATERIAŁ IZOLACYJNY:PERLIT KOC Z WATY SZKLANEJ MATY Z WŁÓKNA SZKLANEGO POBOCZNICA ZB. WEWN. - 9% NI KOC ELASTYCZNY

  13. Fig. - 4.2 : ZB. MEMBRANOWY - CONTAINMENT SYSTEM BOTTOM / WALL - TYPICAL KOTWIENIE MEMBRANY POBOCZNICA MEMBRANOWA BETONOWA POBOCZNICA ZBIORNIKA NAROŻE (MEMBRANA) Płyty narożne (membrana) MEMBRANA DNA BARIERA P.WILGOCIOWA SKLEJKA PANEL IZOLUJĄCY KLEJ SPAJAJACY BETONOWA PŁYTA FUNDAMENTOWA

  14. 1.Porównanie techniczno-ekonomiczne poszczególnych rodzajów zbiorników 1/2)DEFINITION OF CONTAINMENT TYPE PER BS 7777 Dwu komorowy Rodzaj zbiornika Jednokomorowy Pełno komorowy 180% 140% (ca. 35 miesięcy) b. dobra b. dobra b. dobra Small 55,000~176,000 Approx. 50 Tanks Oman : 146,000m3 x 2 Tanks Qatar : 94,000m3 x 4 Tanks Qatar : 152,000m3 x 2 Tanks Sakhalin : 120,000m3 x 2 Tanks 1. Koszt (*1) 2. Czas montażu(*1,*2) 3.Odporność na zagrożenia (1) Thermal Radiation of Fire (2) Falauderzeniowa (3) Flying Projectiles 4. Site Area Required 5. Inner Tank Geo. Capacity Range (m3) 150% 125% (ca. 32 miesiące) b. dobra Dla ściany: dobra Dach : ograniczona Good : Wall all 85,000 Appreox. 10 Tanks - -a 100% *3 100% (Min. 25 miesięcy) dobra Ograniczona Large 8,000 ~ 170,000 Approx. 160 Tanks Indonesia : 127,000m3 x 1 Tanks Abu Dhabi : 150,000m3 x 2 Tanks - 6. Number of Tanks Ever Built in the World as of July 2003. 7. Tanks Ever Built by CHIYODA as of July 2003. 8.Tanks Under Construction / Engineering by CHIYODA as of July 2003. Note : *1 : International Contractor base and for the tank having geometric capacity 100,000m3 and over. *2 : Excluding connection of the pipe, purge and cooldown. *3 : Excluding cost of bund wall.

  15. 1. COMPARISON OF EACH CONTAINMENT TYPE (2/2)CONTAINMENT TYPE NOT DEFINED IN BS 7777 Type of Tank Membrane - Above & In-ground PC Outer Wall LNG Tank in Japan - Approx. 5 to 6 Years Good Good : Wall Roof Limited Good : Wall Roof : Limited Small 35,000 ~ 203,000 Approx. 70 Tanks - - - Approx. 4 Years Excellent Good : Wall Roof : Limited Good : Wall Roof : Limited Small 36,000 ~ 189,000 5 Tanks - 1 Tank for MZL Project 1. Cost 2. Erection Schedule) 3. Resistance Against Abnormal Condition (1) Thermal Radiation of Fire (2) Blast Wave (3) Flying Projectiles 4. Site Area Required 5. Inner Tank Geo. Capacity Range (m3) 6. Number of Tanks Ever Built in the World as of July 2003. 7. Tanks Ever Built by CHIYODA as of July 2003. 8.Tanks Under Construction / Engineering by CHIYODA as of July 2003.

  16. 5. MATERIAL SELECTION FOR THE LNG CONTAINER The material for the LNG container for the large capacity of LNG storage is 9% Ni steel in consideration of the design of -161 ~ -168 oC of the design temperature of LNG as shown in the following sheet “TEMPERATURE RANGE FOR MATERIAL OF CRYOGENIC STORAGE TANKS”. In principle, stainless steel type 304 is used for the tank having small capacity and in case that the use of 9% Ni steel is not economical. The stainless steel type 304 is also used for the membrane of in-ground and above ground tank.

  17. 6. WYMIAROWANIE ZBIORNIKA (1/6) OKREŚLENI E POJEMNOŚCI ZBIORNIKAW TEMPERATURZE OTOCZENIA 1.POJEMNOŚĆ GEOMETRYCZNA : (średnica wew.)2 x π / 4 x wysokosć 2. POJEMNOŚĆ ROBOCZA NETTO “” POJEMNOŚĆ GEOMETRYCZNA – “Górna przestrzeń martwa” – “/ Dolna przestrzeń martwa ” 3. POJEMNOŚĆ MAGAZYNOWA Pojemność całkowita magazynowanej cieczy “Pojemność Geometryczna ” - “Górna przestrzeń martwa ” 4. TOP DEADWOOD/ Górna przestrzeń martwa/ Górna przestrzeń bezpieczeństwa chroniącaprzed przelaniemzbiornika i rozlewem na skutek trzęsienia ziemie. 5. BOTTOM DEAD WOOD / Dolna przestrzeń martwa/ Pojemność zbiornika z której LNG nie jest zasysanepowodowane posadowieniem pompy i NPSHR. 4. TOP DEADWOOD 1. POJEMNOSĆ GEOMET. 3. POJEMNOŚC MAGAZYNOWA 2. POJEMNOŚC MAG. NETTO 5. BOTTOM DEAD WOOD

  18. Wtemperaturze projektowej 6. . WYMIAROWANIE ZBIORNIKA (2/6) SPECIALNIE NALEŻY ROZWAŻYĆ POJEMNOŚĆ ZBIORNIKA W TEMPERATURZEKRIOGENICZNEJ Redukcję wymiarów zbiornika z powodu skurczu w temperaturze kriogenicznej tak na wysokości jak również średnicy, co obrazuje Rys. należy wziąć pod uwagę, aby zapewnić pojemność roboczą netto w temp. projektowej. Wtemperaturzeotoczenia Obliczenia pojemności roboczej netto pokazano poniżej .

  19. 6. WYMIAROWANIE ZBIORNIKA (4/6) TYPOWE WYMIAROWANIE POJEMNOŚCI ZBIORNIKA LNG W W MINIMALNEJ TEMP.. PROJEKTOWEJ Najwyżśza rzędna zbiornika wew. w temp. montażowej (Construction Phase) Najwyżśza rzędna zbiornika wew. w tminimalnej temp. projektowej Top Deadwood: 1,000 mm or Sloshing Height + 1 ft Liquid Run-up whichever Larger. Maksym. Poziom Projekt. LNG (HLL) Ws0kość Ziornika w temp. montążu (Construction Phase) Pojemność Robocza Netto Wysokość Zb. wew. w temperaturze projektowej Minim.Poziom.Projekt. LNG (LLL) NPSHR (@Rated Capacity) of Submerged Pumps Zapas Bottom Deadwood Pump Well Submerged Pump Minimum 150 mm od zaworu stopowego. Zawór stopowy pompy Rzędna dna zbiornika wewnętrznego Średnica Zb. wew. w temperaturze projektowej Średnica Zb. wew. w temperaturze jego montażu

  20. 7. DESIGN PARAMETERS & REQUIREMENTS (1/5) Requirements Apply to the Inner Tank Requirements Apply to the Outer Tank Design Code Requirements Basic Design Data - Minimum Working Capacity - Tank Size - Hydrotest Water Level - Internal Pressure, etc. Material Requirements Painting & Coating Requirements

  21. 7. DESIGN PARAMETERS & REQUIREMENTS (2/5) OBE : Operating Basis Earthquake SSE : Safety Shutdown Earthquake See next sheet for detail per NFPA 59A. Seismic Design Condition Wind Velocity & Pressure Design Against Flying Object Design Against Heat Radiation Design Against Blast Wave Design of Spill Protection

  22. 7. DESIGN PARAMETERS & REQUIREMENTS (3/5) OBE ( Operating Basis Earthquake ) and SSE (Safety Shutdown Earthquake) per NFPA 59A OBE (Operating Basis Earthquake): The LNG container shall be designed to remain operable during and after an OBE. SSE (Safety Shutdown Earthquake): Similarly, the design shall be such that during and after an SSE there shall be no loss of containment capability, and it shall be possible to isolate and maintain the LNG container. After the SSE event, the container shall be emptied and inspected prior to resumption of container- filling operation

  23. 7. DESIGN PARAMETERS & REQUIREMENTS (4/5) Pump Column Design Data BOG Requirements BOG Performance Test Requirements

  24. 7. DESIGN PARAMETERS & REQUIREMENTS (5/5) Tank Appurtenances

  25. System pomiarowy zbiornika z pomiarem gęstościprzetłaczanego medium Sygnał alarmowy górnego skrajnego poziomu medium Podciśnieniowy zawórbezpiecz.(VRV) Zawór bezpieczeństwa. (PRV) Zabezp. przed nadmiernym wzrostem ciśnienia Gaśnica przy wylocie z zaworu bezpieczeństwa (PRV ) Ochrona p. pożarowa (Dry Chemical CO2, N2 Injection, etc.) Zabez. przed przelewem System zraszania Zbiornika Czujka temperatury Instalacja podgrzewania fundamentu 9. PODSTAWOWE ZABEZPIECZENIA ZBIORNIKA LNG Rollover Protection Zabezpieczenie przed przepełnieniem Zb. Zabezp. przed nadmiernym podciśnieniem w Zb. Ochrona dachu Zabezp. przed pożarem z otoczenia Wykrywanie przecieku LNG Zabezp. przed zamarzaniem podłoża Wykrywanie przecieku LNG l & wykrywanie pożaru Detektory gazu i pożaru

  26. 10. PROKTOWANIE ZBIORNIKA DWUKOMOROWEGO Koncepcja projektowania zbiornika dwukomorowego metalowego pokazanona stronach następnych (1) Membrana podwieszana – (Suspended Deck) (2) Dach zbiornika–( Double Dome Roof)

  27. (1) MEMBRANA PODWIESZANA – (Suspended Deck) Wpływ temp. otoczenia, temp. gruntu, temp. etc. na BOG & projekt izolacji pominięto . Zew. powierzchnia dachu, obciążenie użytkowe, instalacje na dachu & membrana podwieszana/ izolacja Obciążenie cieplne z wylotu zaworu bezp. Flying Object Podnoszenie zbiornika prze ciśnienie wew. wiatr/moment obrotowy od trzęsienia ziemi. Podciśnienie Obciążenie użytkowe & od izolacji Ciśnienie wewnętrzne Podnoszenie /moment obrotowy od trzęsienia ziemi Obciążenie cieplne od pozaru sasiedniego Moment obrotowy od wiatru i trzęsienia ziemi Fala cisnieniowa Wiatr Obciażenie od Perlitu Podciśnienie Ciśnienie od trzęsienia ziemi Obciążenie od Perlitu CśnIenie wewn. Woda do prób ciśn.* Produkt* Zakotwienie zbiornika wew. Zakotw. zbiornika zewn. Trzęsienie ziemi Próba hydrauliczna* Izolacja zbiornika Obciążenie od trzęsinia ziemi Pobocznica Zbiornik wew., izolacja, przyłącza oraz obciążenie od momentu obrotowego powodowanego trzęsieniem ziemi. *: jeśli zb. Zewnętrzny jest projektowany do Dach zbiornika zew, membrana podwieszona, izolacja pobocznicy (PUF) i przyłącza oraz momentu obrotowego od wiatru i trzęsienia ziemi.

  28. PRE-STRESSING TENDON PRE-STRESSING ON OUTER WALL PRE-STRESSING ON OUTER WALL PRE-STRESSING ON OUTER WALL PRE-STRESSING ON TENDON PRE-STRESSING TENDON 1. General The concept of LNG storage tank for Full Containment Type is that the outer tank is intended to be capable both of containing LNG and controlled venting of the vapor resulting from product leakage after a credible event. The pre-stressed concrete outer tank wall instead of the RC (Reinforced Concrete) outer tank wall with the earth embankment is introduced in 1990th to minimize tank area and construction cost. The Pre-Stressing Concrete is common design technology and generally used for construction of superstructures such as bridges, etc. 2. Concept of Pre-stressing The outer tank wall (reinforced concrete) is reinforced by by the Pre-stress Tendon against internal pressure as shown in the following model. 12. BASIC DESIGN CONCEPT OF PC (PRE-STRESSED CONCRETE) (1/2) PRE-STRESSING ON TENDON TOP OF PC WALL DUCT BUTTRESS ANCHOR REINFORCED CONCRETE OUTER WALL DUCT HORIZONTAL VERTICAL

  29. “T” X 0.15 OR 80 mm WHICHEVER LARGER RESIDUAL COMPRESSION STRESS ZONE LNG LEAK LEVEL 3. Design Concept of Pre-stressed Concrete Outer Tank Wall (1) Permeation of LNG Vapor For the above corner protection, the carbon steel liner is used to provide and impervious barrier against permeation by LNG vapor at the normal operation condition. Since the carbon steel liner is not intended to contain LNG leakage from the inner tank, in principle, the PC outer wall shall be designed considering that the width of a crack on PC wall shall not be more than 0.2 mm in case of LNG leakage. Because of ice formation in pores the permeability is reduced at minimum design temperature of LNG as compared to normal temperature and it is planned to utilize this self-blocking effect. (2) Residual Compressive Stress In addition to the aforesaid allowable crack width on the PC outer wall, the residual compressive stress zone shall be 15% of wall thickness, but not less than 80mm in case of LNG leakage as shown in the following fig. The value of the minimum residual compression stress to be with discussed and agreed by the client for the project. 12. BASIC DESIGN CONCEPT OF PC (PRE-STRESSED CONCRETE) (2/2) “T”: THICKNESS OF PC OUTER WALL OUTSIDE INSIDE PC OUTER WALL

  30. 3.1 Przywołane standardy i kody

  31. 3.1. APPLICABLE DESIGN CODES & STANDARDS (1/9) OVERSEAS Europe USA BS 7777 API Std 620 PN-EN-14620 PN-EN 1473 NFPA 59A NFPA 15

  32. 3.1. APPLICABLE DESIGN CODES & STANDARDS (3/9) Design Codes & Standards Description Notes Including definition of single, double and full containment & prestressed outer tank design requirements in part 3. BS 7777 British Standard 7777 Flat-bottomed, vertical, cylindrical storage tanks for low temperature service Consists of: Part -1: Guide to the general provisions applying for design, construction, installation and operation Part-2: Specification for the design and construction of single, double and full containment metal tanks for storage of liquefied gas at temperature down to -165 oC Part 3: Recommendations for the design and construction of prestressed and reinforced concrete tanks and tank foundations, and the design andb installation of tank insulation, tank liners and tank coatings Part-4: Specification for the design and construction of single containment tanks for the storage of liquid oxygen, liquid nitrogen or liquid argon

  33. 3.1. APPLICABLE DESIGN CODES & STANDARDS (4/9) EEMUA 147 OVERSEAS Europe USA API Std 620 BS 7777 API Std 620 EEMUA 147 EN 1473 EN 1473 NFPA 59A NFPA 15

  34. 3.1. APPLICABLE DESIGN CODES & STANDARDS (5/9) Design Codes & Standards Description Notes The Engineering Equipment and Materials Users Association Publication No. 147 Recommendations for the Design and Construction of Refrigerated Liquefied Gas Storage Tanks EEMUA 147 Including definition of single, double and full containment that are same as defined in BS 7777. Adopted European Standard Installation and Equipment for Liquefied Natural Gas - design od Onshore Installation EN 1473 Including definition of single, double and full containment that are same as defined in BS 7777. American Petroleum Institute API Standard 620 Design and Construction of large, Welded, Low - Pressure Storage Tanks Definitions of single, double and full containment that are not included. Applicable to the cylindrical inner tank of each containment type defined in BS 7777, and double metal single and full containment tank. API Std 620

  35. 3.1. APPLICABLE DESIGN CODES & STANDARDS (6/9) OVERSEAS Europe USA BS 7777 API Std 620 EEMUA 147 EN 1473 NFPA 59A NFPA 15 NFPA 15 NFPA 59A