Sign Permit Process Update December 9, 2010

Sign Permit Process Update December 9, 2010. Overall Sign Permit Process. SUBMITTAL. REVIEW. PERMIT ISSUANCE. INSPECTION. Applicant submits Sign Permit Application Sign Plans (electronic/paper copy) Pays Plan Review Fees. Sign Plans reviewed by City Staff

rafe
Download Presentation

Sign Permit Process Update December 9, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sign Permit Process Update December 9, 2010

  2. Overall Sign Permit Process SUBMITTAL REVIEW PERMIT ISSUANCE INSPECTION • Applicant submits • Sign Permit Application • Sign Plans • (electronic/paper copy) • PaysPlan Review Fees Sign Plans reviewed by City Staff Review Comments sent to Applicant Applicant pays Sign Permit Fees Picks up the “Issued Sign Permit” and approved set of plans (Note: only issued to a registered contractor) Contractor requests required inspection Necessary Modifications Subsequently Made By Applicant Revisions submitted at One Start Center Staff notifies Applicant to submit electronic file (TIFF or PDF) of the final approved plan Must be done in person Must be done in person Sign Permit Application is “Approved for Issue” Staff notifies Applicant Application Timeline

  3. Submittal Requirements for all Sign Permit Applications

  4. Required information for Freestanding Signs: • Height • (OAH & cabinet height) • Width • (sign cabinet width and pole width) • Engineered drawing for pole signs • Copy text of the proposed sign

  5. Freestanding Signs (contd.) • Plot plan: A plan view of a particular business or area, showing streets, buildings, traffic flow, property lines, sign locations, etc. Sign location must be identified

  6. Wall Sign Required Information Required Measurement Required Measurement

  7. Wall Sign Required Information Cross Sectional Drawing

  8. Summary • Applications • Incomplete applications will not be accepted • Revisions • Revised Plans will only accepted through the OneStart Desk • Approved sign permits • Pick up from the OneStart Desk • Must be on-site during the installation process • Fees • If approved plans are not submitted electronically in a TIFF format a scanning fee will be charged. (0.25 per legal and letter sheet, $1.00 for larger sheets) • Inspections • Service Representative, 24-hour Recorder, or online at www. ArlingtonPermits.com

  9. Questions? For scheduling inspections: • 24-hour Recorder: (817) 261.8817 • Permit Tech: (817) 277.5561 • www.arlingtonpermits.com • OneStart Desk