This plan compares different concepts for a tower structure with a horizontal extent and provides a cost comparison. It also proposes adaptations for an 8-meter version and includes a working plan. The model does not include certain components and data should be refined for an accurate cost evaluation.

rbetty
Download Presentation

Tower structure with horizontal extent

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tower structure with horizontal extent mechanical structure and cost model

  2. Plan • Compared concept • Cost comparison • 8 meters adaptation • Working plan

  3. Compared concept (1/2) • Anemone concept 2,5m

  4. Compared concept (2/2) • NEMO concept

  5. Cost comparison • Model only for copper data transmission in each tower (up from now) • Model doesn’t include multi PM (up from now) • Model doesn’t include JB and main cable • Cost data should be refined for absolute cost evaluation

  6. Line description: Intra floor: Inter floor: Line ending: JB connection Cost data: Floor: Floor link: Data transmission: Line ending: JB connection: Cost comparison

  7. Integration time: Floor : 9h Line ending:12h Off line integration Sea operation data Line deployment: ROV installation: ……… similar Cost comparison

  8. ANEMONE cost/line Line 420k€ Floor: 19700€ Cabling system 31800€ Line ending 17150€ JB connection 56000€ Integration 50k€ Line 156/line PM 192h/line Electronic 136h/line Connector 204h/line Sea cost: 75k€/line Line deployment: 35000€/line ROV : 40000€/line NEMO cost/line Line 460k€ Floor: 22200€ Cabling system 39000€ Line ending 17150€ JB connection 56000€ Integration: Line PM Electronic Connector Sea cost: 100k€/line Line deployment: 60000€/line ROV 40000€/line Cost comparison 75€/h 550k€/line 600k€/line

  9. Cost comparison • Cost are similar ( in the model error) • A more precise model needed on sea operation and floor cost • Further improvement: • Fiber optic model • Multi PM model • More precise data transmission cost model • Industrial cost and integration time • …

  10. Concepts adapted to 8 m • Requirements: • 6 spheres (17”) per floor ; • Spheres grouped by 2; • 8 meters between external sphere groups in acquisition mode; • 30 meters between floor ; • 16 floors: • With relative positioning if bar floor; • Without relative positioning plan floor ; • Compact line unfolded from sea bed. Furling / Unfurling structure

  11. Concepts adapted to 8 m • Bar concept with NEMO cabling system Hydrodynamic stability to check

  12. Plan concept Extendable arm to develop!! Concepts adapted to 8 m 8m Truck transportable! 2 Sphere(s) or capsule Arm deployment

  13. Concepts adapted to 8 m • Under the previous requirements, especially the floor size, the smarter solution seems to be a “bar” floor supporting 2 couples of spheres at the ends and a couple of spheres in the middle. • Relative floor positioning and cables/ropes management could be similar than NEMO

  14. Development plan • Concept validation  june 2009 • Hydrodynamic simulation • Sea operation cost • NEMO phase 2 validation • Capsule studies • TDR definition • 8m concept test ?? • Industrial studies  ??