Instrument, Spacecraft, and Launch Overview

Instrument, Spacecraft, and Launch Overview. Joan Howard Ball Aerospace. Instrument Requirements. Ball Heritage. Currently building SIRTF CTA and instrument which uses Ge:Ga FPA’s Past CDR in subassembly test No major technical showstoppers IRAS flying successfully

Download Presentation

Instrument, Spacecraft, and Launch Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Instrument, Spacecraft, and Launch Overview Joan Howard Ball Aerospace

  2. Instrument Requirements

  3. Ball Heritage • Currently building SIRTF CTA and instrument which uses Ge:Ga FPA’s • Past CDR in subassembly test • No major technical showstoppers • IRAS flying successfully • very similar from a cryo design - only smaller • Conceptually simple design • simple electronics, tested FPA’s, small/few element optics, but…. • Cryo design never simple

  4. Spacecraft Requirements • Low Cost - less than $15M? • Accept >125 kg instrument • Provide > 30 Watts of power to payload • Pointing Stability < 24 seconds per data acquistion • Fit into selected Launch Vehicle • Data Storage: 200 Mbytes

  5. Spacecraft Key Performance Requirements Description X-12M SMEX LITE SA-200S MiniStar Spacecraft Bus Mass 65.6 kg 75kg 98kg Payload Mass Capability 200 kg 91kg 200kg 180kg Available Payload Power > 100 W 150W 60W 17.5W ACS Configuration 3-axis stabilized 3 axis zero momentum Gravity Gradient Attitude Knowledge 28 mrad 5mrad .5 degrees Attitude Control 32 mrad 96mrad 10 degrees Payload Data Storage 256 Mbytes 130 Mbytes 8Gbyte 3Mbytes Communications S-Band S-Band S-band S-band Telemetry Rate 4Mbps 2.25Mbps 10Mbps 1 Mbps

  6. Equipment Shelf Provides Ample Area For Subsystem Units

  7. S/C Selection • Meets minimum requirements • Lowest total cost • nearly all COTS buses will need changes • integration issues • heritage of performance: technical, cost, schedule • Willing to work with team • Selection not mandatory for 1st round - a solution, not the solution needed

  8. Issues/risks/options • Need good story for aperture cover - esp. after WIRE • Light shade a key driver in itself and for cryo design • Star tracker vs. gyro • battery size vs. eclipse • CPU capabilities/memory - on orbit computation vs. downlink • configuration drivers: LV, COTS, star tracker location, timeline, launch date

  9. Launch Options