1 / 19

Project Xxx

Project Xxx. Alpha Readiness Review. Project X Core Team. Agenda. Decisions requested Issues from CDR Technical Readiness Unit/Integration Tests Engineering Tests System Tests Alpha test rediness Beta test rediness Open known bugs/FOM Changes in Design Manufacturing Readiness

rodolfov
Download Presentation

Project Xxx

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Xxx Alpha Readiness Review Project X Core Team Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  2. Agenda • Decisions requested • Issues from CDR • Technical Readiness • Unit/Integration Tests • Engineering Tests • System Tests • Alpha test rediness • Beta test rediness • Open known bugs/FOM • Changes in Design • Manufacturing Readiness • Updated product cost/GM • Risk and risk management • Decisions requested Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  3. Decisions requested • Outline here the decisions which are requested at the end of this meeting • Main decision should be approval to go to Test & Evaluation stage Review (technical readiness) • Any other decision requiring approval from R&D department should also be listed here Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  4. Issues from CDR • Provide status of issues raised at CDR • Resolved/still pending? • What implications? Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  5. Unit / Integration Tests • Outline the status and key results of the unit and integration tests (bugs identified / corrected, outstanding issues) Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  6. Engineering Tests • Outline the status and key results of the engineering tests (bugs identified / corrected, outstanding issues) for the following tests • Functional test • Performance test • HALT test • PHy test • Negative tests • Functional Load / Stress tests • Black box testing / ATP • Mechanical / Environmental tests • Pre-compliance tests (EMC, Safety) • Preliminarily documentation review (include upgrade/SW download) Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  7. Initial System Tests • Outline here the status and key results of System tests (ie intial cycle(s) of system tests at the exclusion of Alpha) • Results of the scalability tests • Versions tested • Bugs identified / corrected • Results of the tests with products from other divisions • Versions tested • Bugs identified / corrected • Results of the Large Networks / System tests • Versions tested • Bugs identified / corrected • Outstanding issues Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  8. Alpha tests plan • List here all alpha test planing issues. Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  9. Open known bugs • Insert here graph report from Clear Quest Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  10. Changes in Design • Specify the modifications made to the design • Taking into account bugs found during the tests • Confirm that current design meets requirements from other functions • CSO (design in line with Serviceability requirements) • Manufacturing (design in line with Manufacturability requirements) • Test (design in line with Testability requirements) • Check readiness of design to be used for pilot build • Are the files to be used by Manufacturing up-to-date Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  11. Manufacturing Readiness • Demonstrate readiness of Production for Pilot Build • Manufacturing lines ready • Manufacturing Tests ready • Production process validation plan • Hard tooling • Shipments • Demonstrate readiness of Materials for Pilot Build • Qualification of suppliers • Availability of materials • Demonstrate Progress in Production testing development • Test station coverage and readiness. • Volume testing • Repair Policy Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  12. Product cost • Provide up-to-date product cost and GM estimates • Based on design modifications • Using the BOM to be used in pilot build Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  13. Product Launch preparation • Add here marketing readiness and product launch plans: • Objectives • Activity • Players • Budget • Time line Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  14. Service planing readiness • Specify service planing • Service readiness • Budget • Units allocated to CSO • Training • CSO support center • Repair policy Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  15. Risk and risk management Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  16. Documentation readiness • R&D documentation • Archiving • Version control/Versions freeze at IR (HW, SW) • MKT documentation • Initial release note • user guide • Installation/upgrade instructions • Publications • Production documentation: • Production file readiness • # of DECO’s • Procurement contracts readiness Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  17. Decisions requested • Repeat here Slide #3 Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  18. Back-up slides Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

More Related