1 / 4

Design and Layout WG 20-2-2014: https://indico.cern.ch/event/299647/

Design and Layout WG 20-2-2014: https://indico.cern.ch/event/299647/. QA/QC for the detector construction . Julien GIRAUD, Ralf HERTENBERGER, Paolo IENGO, Francesco LACAVA, Sotiris VLACHOS. MANDATE:

rowena
Download Presentation

Design and Layout WG 20-2-2014: https://indico.cern.ch/event/299647/

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design and Layout WG 20-2-2014: https://indico.cern.ch/event/299647/

  2. QA/QC for the detector construction. Julien GIRAUD,Ralf HERTENBERGER, Paolo IENGO, Francesco LACAVA,Sotiris VLACHOS MANDATE: Scope : The QA/QC here addressed mainly concern construction but not PCB QA/QC which is taken in charge by a different group. A link between these groups must be established. • Identify all individual components/parts to be labelled, recorded, individually tested and the parameters that should be recorded. • Identify checks needed during construction • Establish methods for the quality follow-up during the construction of the different parts at each construction site. • List the parameters and results of the checks to be recorded. • Establish the manual for the quality at the different phases of the modules construction.

  3. Tasks and working groups for detector construction https://indico.cern.ch/event/299647/contribution/1/material/slides/0.pdf 1 – PCB alignmentmidAprilmid May 2 – PanelconstructionCERN (H.Danielsson), F.Lacava (Roma I), A.Peyaud (Saclay) 3 – Detector assemblymidJune 4 – Thermo-mechanicalsimulationsmidApril 5 – Layout and drawingsmidJune 6 – AluminiumfoamstudiesmidApril 7 – Mesh fixation and deformation midApril 8 – Meshtension / specificationsmid May 9 – Cooling system midApril 10 – Gas system midApril

  4. UlrichLandgraf: Ideasfor detector assembly F.Lacava: Panelconstruction PatrikPonsot: Status on thermo-mechanical simulations and drawings -------> Tonino??? GianlucaIntrozzi: Panel deformation due to gas over pressure & Gravity - Mesh production & Stress test - Pillar structure & Vacuum deformation

More Related