1 / 4

Outcome of the CERN meetings Preparing the upgrade R&D proposal

Outcome of the CERN meetings Preparing the upgrade R&D proposal. M. Shochet. The meetings at CERN. We are encouraged to submit an upgrade R&D proposal ASAP. Internal review by an appointed committee: takes a few months. Then a few weeks to allow other groups to join.

Download Presentation

Outcome of the CERN meetings Preparing the upgrade R&D proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Outcome of the CERN meetingsPreparing the upgrade R&D proposal M. Shochet

  2. The meetings at CERN • We are encouraged to submit an upgrade R&D proposal ASAP. • Internal review by an appointed committee: takes a few months. • Then a few weeks to allow other groups to join. • Focus on next year – producing a technical design report. • Make FTKSim available to others. • Compare FTK and software tracking. • How are b-tag efficiencies correlated across levels? • I think the last two bullets are not very important or at least derivative. More sophisticated algorithms can be carried out with FTK because more L2 time is available. • What does matter is • Track efficiency • Impact-parameter resolution • Effect of the minimum PT of tracks • Effect of limiting the cone size for tracking • Need current level-2 timing for 4-jet events.

  3. Upgrade R&D Proposal • Introduction • Importance of trigger flexibility, robustness, redundancy, operating margin • Importance of 3rd-generation and the problem of its QCD background • FTK: provides full tracking with high quality helix parameters @ L2 start • Give a few physics examples (briefly). • We propose to prepare a technical design report. • Participating Institutions: • So far: Chicago, Illinois, Pisa • Seek additional participation? • U.S.: Berkeley (Beate) • Italy: Frascati, Rome, Pavia, … • Topic & Goal, etc.: • FTK: where it fits in, data flow, how it works, dual-output HOLA in hand • What this proposal covers: developing the TDR

  4. TDR tasks (with dates & # of people) • Complete and document physics studies during R&D proposal consideration. • Complete FTK simulator • Study performance vs. luminosity • Data-path specification for 1034 • Determine size of AM • Specs for each board: DF (strips & pixels), DO, AM, fitters • Specify output format for ROBINs • Physical layout: fibers, crates, cables • Firmware needed • Software needed: initialization, readout, monitoring • Resources needed for design, construction & testing, commissioning, operating.

More Related