1 / 8

IEEE 802.3 Ethernet Working Group November Plenary Report 20 November 2009

IEEE 802.3 Ethernet Working Group November Plenary Report 20 November 2009. David J. Law, Chair, IEEE 802.3 David_Law@3Com.com www.ieee802.org/3. IEEE P802.3az Energy-Efficient Ethernet. IEEE P802.3ba/D2.1 completed 1st Working Group recirculation ballot

Download Presentation

IEEE 802.3 Ethernet Working Group November Plenary Report 20 November 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.3Ethernet Working GroupNovember Plenary Report20 November 2009 David J. Law, Chair, IEEE 802.3David_Law@3Com.com www.ieee802.org/3

  2. IEEE P802.3az Energy-Efficient Ethernet • IEEE P802.3ba/D2.1 completed 1st Working Group recirculation ballot • 81% Approval rate, 67% Return rate, 18% Abstention rate • Resolved comments on IEEE P802.3az/D2.1 • Reviewed and processed 255 comments • Proceeding to 2nd Working Group recirculation ballot • Ballot scope will be same as 1st recirculation ballot • Other items • Chartered 10GBASE-T fast link recovery ad-hoc • Next meeting at January 2010 interim meeting series • Respond to 2nd Working Group recirculationballot comments

  3. IEEE P802.3ba 40 Gb/s and100 Gb/s Ethernet • IEEE P802.3ba/D2.3 completed 3rd Working Group recirculation ballot • 97% Approval rate, 63% Return rate, 5% Abstention rate • Resolved comments on IEEE P802.3ba/D2.3 • Reviewed and processed 77 comments • No new unresolved negative comment • No substantive changes to draft • Proceeding to sponsor ballot • Other items • Developed response to OIF liaison letter • Next meeting at January 2010 interim meeting series • Respond to initial sponsorballot comments

  4. IEEE 802.3 Maintenance • IEEE P802.3-2008/Cor 1(IEEE 802.3bb)/D1.2 Pause Reaction Delay Corrigendum completed initial sponsor ballot • Results • 100% Approval rate, 88% Return rate, 1% Abstention rate • No comments received • Approval to proceed to RevCom submittal • Review of outstanding maintenance requests • Developed response to interpretation request 1-11/09 • Discussion of timing for next revision • Initial proposal is for post IEEE P802.3az • Next meeting at January 2010 interim meeting series • Review of outstanding maintenance requests

  5. IEEE P802.3.1 Ethernet MIB • Continuing Task Force review of draft • Other items • Developing request to IANA for assignments • IANAifMauTypeListBits textual convention • IANAifMauAutoNegCapBits textual convention • dot3MauType object identifier • Request to be completed at next interim • Next meeting at January 2010 interimmeeting series • Review comments from Task Force review

  6. Ethernet support for the IEEE P802.1AS time synchronization protocol call for interest • IEEE P802.3bf Media Access Control (MAC) service interface and management parameters to support time synchronization protocols draft PAR • Draft PAR approved for submittal to NesCom • Objective and 5 Criteria approved • Held joint session with IEEE 802.1 AVB • Drafted response to ITU-T SG15 liaison letter • Reviewed IEEE P802.3bf draft PAR • IEEE P802.3af Task Force formed on PAR approval • First meeting of Task Force at January 2010 interim • If PAR not approved Study Group will meet in January

  7. 40Gb/s Ethernet Single-mode FibrePMD Call for Interest • Vote to form Study Group passed • IEEE 802.3 40Gb/s Ethernet Single-mode Fibre Study Group • First meeting at January 2010 interim meeting series

  8. Working Group information • Web site http://www.ieee802.org/3 • WG and TF documents on web site • Presentations • Minutes • Reflector subscription information • Rules, etc. • Interim TF and SG meeting details posted on web site • TFs and SG will meet 25-28 January, New Orleans, LO, USA • Next WG plenary session, 15-18 March, Orlando, FL, USA

More Related