An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMS HCAL Clock and Control ModuleQPPL/Crystal Upgrade T. Shaw S. Holm 10 OCT 2012

  2. Clock and Control Module (CCM) V4 Board 1 Board 5 Board 3 Board 4

  3. Clock and Control Module (CCM) V4 • HB/HE/HO all use a CCM in every readout box (RBX) Board 1 • Provides I2C communication via RBX backplane • This board has opto-coupler experiencing SEUs -> rework of board jumper (approved ECR) Board 5 • TTCrx Interface, FPGAs Board 3 • QPPL and clock distribution to 1st half RBX backplane Board 4 • QPPL and clock distribution to 2nd half RBX backplane

  4. Clock and Control Module (CCM) V4 • Boards 3 & 4 have QPLLs and are used to distribute 40MHz clock to all Front end electronics HCAL boards were built before discovery of “activity dip” problems in the crystals. A new recommendation to provide a power reduction circuit was late for HCAL. Aerial mod was done to try to patch problem. Probably not a good idea because crystals can be damaged by heat and mechanical force.

  5. Clock and Control Module (CCM) V4 • PCB layout of HCAL boards around QPLL also did not benefit from later recommendations which exist in latest QPLL manual.

  6. Clock and Control Module – Proposal to upgrade boards 3 & 4 • We propose to upgrade CCM boards 3 and 4. • Version 5 • New layout • Includes crystal power reduction circuitry • Follows the PCB recommendations in latest QPLL manual • New design • Allow for redundancy in clock drive capability • Old design used a QPLL/crystal to drive half an RBX backplane (Board3 ) and another QPLL/crystal to drive the other half (Board 4) • New design still uses two QPLL/crystal combinations, but selects one to drive clocks to the entire RBX backplane. The second QPLL/crystal stands by as a hot spare ready to be switched to.

  7. CCM Boards 3 & 4 upgrade (V5)QPLL Selection Because we retain CCM boards 1&5, we are constrained in the design to use two available control signals “QPLL_RESET” and “CLOCK_SELECT” Designed by Scott Holm

  8. CCM Boards 3 & 4 upgrade (V5)QPLL Selection – TMR section Triple Modular Redundancy

  9. CCM Boards 3 & 4 upgrade (V5)QPLL Selection – Timing

  10. CCM Boards 3 & 4 upgrade (V5)QPLL Selection – Timing • Design/Timing has been tested at Fermilab and at CERN • QPLL lock range tested on two pre-production boards 3 & 4 (Work done by Dick Kellogg at CERN ) • No activity dips observed • Minimum range 7.4KHz centered almost perfectly at fLHC, at 40.0791

  11. CCM Boards 3 & 4 upgrade (V5)Jitter Measurement Measurements on unloaded HB backplane 4 October 2012

  12. Radiation Testing Proposal • HCAL Radiation levels • Radiation from LS1-LS2 (when CCMs will all be removed) are relatively low • Worst levels (with safety margin): TID – 190rad, neutron level – 1.3E11 n/cm2 • Component types were all tested before. [Stick to same family of chips.] • Chosen MC100LVEL family of chips which have been shown to be robust. Board is designed with TMR, which should make it immune to SEUs • Test new chips for performance degradation after gamma exposure. • Radiation Testing Proposal – radiation levels are low enough and new components are low risk we are advocating not to do additional testing • Rad testing cost ($16500) • CERN gamma facility (available Oct/Nov/Dec) • TID exposure of chips (free beam + simple (bread board) fixture) • Cost: $100 shipping + $2k tech time + $500 boards = $2600 • MGH (machine problems – available only after Dec) • Cost: $650/hr (~6hrs) + travel to Boston + special board to test chips [$3900 (beam) + $5k (boards) + $2000 (travel) + $3k eng time] = $13900

  13. Conclusions • Pre-production CCM boards 3 and 4 (V5) have been tested and work • No changes required to move into production phase