1 / 10

Safety Officier

P.M. DMH. P.M. DA. P.M. DCC. P.M. DE. P.M. DCM. P.E. Rolling process. Process Coordinator. P.E. Combustion process. P.C. WTP process. P.E. Meltshop process. P.E. Substation, HV - LV power distrib. P.E. Civil & structural des. P.E. Mech. Equipment eng. P.E. L.V. Distribution.

seth
Download Presentation

Safety Officier

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P.M. DMH P.M. DA P.M. DCC P.M. DE P.M. DCM P.E. Rolling process Process Coordinator P.E. Combustion process P.C. WTP process P.E. Meltshop process P.E. Substation, HV - LV power distrib. P.E. Civil & structural des. P.E. Mech. Equipment eng. P.E. L.V. Distribution P.E. Mech. Equipment engin. P.E. Interconnecting cabling P.E. Interconnecting piping P.E. Hydraulics Lubrication P.E. Automation P.E. Hydraulics lubrication P.C. Automation system level 1 P.E. Instrumentation P.E. Piping Utilities P.E. Piping utilities P.E. HVAC P.C. Automation system level 2 P.E. Instrumentation P.E. Instrumentation P.E. Firefighting system P.E. Compressed air system P.C. Workshop laboratory eq. P.C. Cranes Turn-key project Key-Personnel Organisation chart Director, Projects Client Project Manager & Project Management Staff Danieli Engineering (DE) Project Manager Sales Manager Project Planning & Control Export Finance & L/C Manager Contract Administr. Legal Dept. Manager Procurement Manager Danieli Construction & Commissioning (UMAC) Client Site manager & Staff Quality Manager P.M. Construct Erection & Commiss. Safety Officier Site Manager Planning & quantity Survey Deputy Site Manager Material Man Quality Assurance Eng. Accounting & Cost control Site Technical Office Field Engineers Civil and infrastructure construction Supervisor Erection Supervisors Startup and commissioning Team Building erection Mechanical Mechanical equipment Electrical Piping Reheating furnace Aux. Systems P.C. Procurement cc P.C. Manufacturing & expediting Piping and aux. Systems Automation HV / LV power distribution & Automation system P.C. Packing & Shipping P.C. Spare parts P.C. Training P.C. Operation, maintenance & safety manuals P.C. Expediting / testing (E LE) P.C. Quality Control

  2. General Management Flow Chart (part 1) CONTRACT & FINANCING TOOLS REQUIREMENTS CONTRACT SCHEDULE TECHNICAL SPECIFICATION PAYMENT METHOD/FORMALITIES PICS (PROJECT INTEGRATED CONTROL SYSTEM) MASTER PLANT LIST WORK BREAKDOWN RESPONSIBILITY PRICE BREAKDOWN SCHEDULE (LEV. III) CASH FLOW JOB POSITION (TPC/JET) INSPECTION TEST SCHEDULE (ITS) (PART 2) (PART 3)

  3. General management Flow Chart (part 2) JOB POSITION (TPC / JET) from part 1 ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS) MATERIAL REQUIR. TECHN. DOCUMENTS PROCUREMENT PURCHASE & ORDERS MANUFACTURING OUTSIDE (E/LE) INSIDE (I) (PART 3)

  4. INSPECTION PLANNING NOTICE OF SURVEILLANCE (NOS) CERTIFICATION (IRP) PACKING LIST General management Flow Chart (part 3) MANUFACTURING (FROM PART 2) INSPECTION TEST SCHEDULE (ITS) (FROM PART 1) OUTSIDE (E) INSIDE (I/LE) INSPECTION & TESTING (NOI/IRE/LOC/QCTM) INSPECTION PLANNING NOTICE OF INSPECTION (NOI) CERTIFICATIONS (IRE) RELEASE CERTIFICATE (RC) PACKING JOB POSITION (TPC/JET) (FROM PART 1) PRICE BREAKDOWN (FROM PART 1) SHIPPING & INVOICING CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM) COMMISSIONING

  5. Master Plant List (esempio)

  6. Estratto Livello 3: Plant Unit 31 (Typical)

  7. Programmazione di Livello 3 (Typical)

  8. Programmazione di Livello 4 (Typical)

  9. Cut-off date: Progress (Typical)

  10. Curve pianificate di avanzamento (typical) % 100 90 80 70 60 50 40 30 20 10 0 N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A 2001 2002 2003 2004 progress Valide per tutte le discipline e attività planned

More Related