An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Geothermal Power and Company Overview EPS Workshop Arizona Corporation Commission April 5, 2004

    15. General Project Data Optimized Plant Size: 30 MW (Binary: 4 x 7.5 MW turbines) (Steam: 1 x 30 MW turbine) Demo Binary Plants: As Small As 2 MW Range of PPA Prices: $0.053 to $0.083 per kWh. Major Cost Variables: 1. Size of initial plant. 2. Scale up sizes to larger plant. 3. Well temperature and output. 4. Transmission burden, if any.

    16. General Project Data Estimated Land Use Requirements: 2 MW: 2 acres total 30 MW: 10 acres plant, 5 acres wells +/- Water Use: Air-cooled technology = 0 water Water-cooled technology = 150 gpm on a hot day Economic and Environmental Benefits: Next Slide