PROYECTO PAREX RESOURCES. PROYECTO : Completamiento, Workover y abandono de pozos DURACIÓN TOTAL: Campaña 2010, 2011, 2012 y 2013 UBICACIÓN: Pore , Trinidad , San Luis de Palenque, Aguazul, Villanueva, Casanare – Colombia

shania
Download Presentation

PROYECTO PAREX RESOURCES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROYECTO PAREX RESOURCES PROYECTO:Completamiento, Workover y abandono de pozos DURACIÓN TOTAL: Campaña 2010, 2011, 2012 y 2013 UBICACIÓN: Pore,Trinidad, San Luis de Palenque, Aguazul, Villanueva, Casanare – Colombia CAMPO: Kona, Sulawesi, Celeus, Goroka, Malawi, Adalia, Akira, Viviana, La Casona, Cumbre, Las Maracas, Java, entre otros. CANTIDAD DE POZOS INTERVENIDOS: 110pozos, a septiembre de 2013 NPT: 0,6% a octubre de 2013 CANTIDAD DE HORAS OPERATIVAS:10000 horas a septiembre 2013 ACCIDENTES INCAPACITANTES: Cero (0)

  2. PROYECTO PAREX RESOURCES

  3. PROYECTO PAREX RESOURCES

  4. PROYECTO CHEVRON PROYECTO:Completamiento, Workover y abandono de pozos DURACIÓN TOTAL: Campaña 2012 y 2013 UBICACIÓN: Riohacha – Guajira, Colombia CAMPO: Ballena y Riohacha. CANTIDAD DE POZOS INTERVENIDOS: 6 pozos, al 2013 NPT: 0,0% CANTIDAD DE HORAS OPERATIVAS: 2300 ACCIDENTES INCAPACITANTES: Cero(0)

  5. PROYECTO CHEVRON

  6. PROYECTO CHEVRON

  7. PROYECTO TABASCO PROYECTO:Perforación, Completamiento y Workover de pozos DURACIÓN TOTAL: Campaña 2013 – 2014 UBICACIÓN: Paz de Ariporo– Casanare, Colombia CAMPO: Jagueyes CANTIDAD DE POZOS INTERVENIDOS: 3pozos, al 2013 NPT: 0,5% a octubre de 2013 CANTIDAD DE HORAS OPERATIVAS: 2067 ACCIDENTES INCAPACITANTES: Cero (0)

  8. PROYECTO TABASCO

  9. PROYECTO GEOPARK PROYECTO:Completamiento y Workoverde pozos DURACIÓN TOTAL: Campaña 2012 – 2013 UBICACIÓN: Paz de Ariporo,Tauramena– Casanare, Colombia CAMPO: Tua, Max, Agami, La Cuerva CANTIDAD DE POZOS INTERVENIDOS: 16 pozos, a septiembre de 2013 NPT: 1,2% a septiembre de 2013 CANTIDAD DE HORAS OPERATIVAS: 3200 ACCIDENTES INCAPACITANTES: Cero (0)

  10. PROYECTO GEOPARK

  11. PROYECTO PETROMINERALES PROYECTO:Completamiento y Workoverde pozos DURACIÓN TOTAL: 3 meses UBICACIÓN: Orocue– Casanare, Colombia CAMPO: Tucuso - Curito CANTIDAD DE POZOS INTERVENIDOS: 3 pozos, a septiembre de 2013 NPT: 0% a septiembre de 2013 CANTIDAD DE HORAS OPERATIVAS: 900 ACCIDENTES INCAPACITANTES: Cero (0)

  12. PROYECTO PETROMINERALES

  13. PROYECTO PACIFIC PROYECTO:Completamiento y Workoverde pozos DURACIÓN TOTAL: 2009yCampaña 2013 UBICACIÓN: San Pedro de la Paz – Santander, Colombia / Orocue – Casanare, Colombia CAMPO: Cravo viejo y Cachicamo CANTIDAD DE POZOS INTERVENIDOS: 3 pozos, a Septiembre de 2013 NPT: 0% a Octubre de 2013 CANTIDAD DE HORAS OPERATIVAS:1290 ACCIDENTES INCAPACITANTES: Cero

  14. PROYECTO PACIFIC

  15. PROYECTO PACIFIC

  16. PROYECTO OCCIDENTAL DE COLOMBIA PROYECTO:Abandono de pozos DURACIÓN TOTAL: 6 meses UBICACIÓN: Casanare, Colombia CAMPO: El miedo NPT: 0% CANTIDAD DE HORAS OPERATIVAS: 33 ACCIDENTES INCAPACITANTES: Cero (0)

  17. PROYECTO OCCIDENTAL DE COLOMBIA

  18. PROYECTO PETROBRAS PROYECTO:Workover de pozos DURACIÓN TOTAL: 6 meses UBICACIÓN: Monterrey CAMPO: Balay NPT: 1,2% CANTIDAD DE HORAS OPERATIVAS: 380 ACCIDENTES INCAPACITANTES: Cero (0)

  19. PROYECTO PERENCO PROYECTO:Completamiento y Workover de pozos DURACIÓN TOTAL: 2010 / Campaña 2012 y 2013 UBICACIÓN: Trinidad, San Luis de Palenque – Casanare, Colombia CAMPO: Trinidad, Caño Gandul, Caño Garzas, Remache CANTIDAD DE POZOS INTERVENIDOS: 18pozos, a septiembre de 2013 NPT: 1,6% a septiembre de 2013 CANTIDAD DE HORAS OPERATIVAS: 3400 ACCIDENTES INCAPACITANTES: Cero (0)

  20. PROYECTO NEW GRANADA PROYECTO:Completamiento y Workover de pozos DURACIÓN TOTAL: Campaña 2011 – 2012 – 2013 UBICACIÓN: Santa Rosalía – Vichada, Colombia; El Porvenir – Meta, Colombia; Paz De Ariporo – Casanare, Colombia CAMPO: Leona, Dorotea, Cabiona, Garzas. CANTIDAD DE POZOS INTERVENIDOS: 17pozos, a septiembre de 2013 NPT: 1,3% a septiembre de 2013 CANTIDAD DE HORAS OPERATIVAS: 3550 ACCIDENTES INCAPACITANTES: Cero (0)

  21. PROYECTO CEDCO PROYECTO:Completamiento y Workover de pozos DURACIÓN TOTAL: Campañas 2010 – 2011 – 2012 –2013 UBICACIÓN: Tilodirán, Maní – Casanare, Colombia CAMPO: Tilodiran, Cajaro, Boral, Macarena CANTIDAD DE POZOS INTERVENIDOS: 11pozos, a septiembre de 2013 NPT: 2,8% a septiembre de 2013 CANTIDAD DE HORAS OPERATIVAS: 2200 ACCIDENTES INCAPACITANTES: Cero (0)

  22. PROYECTO EMERALD PROYECTO:Completamiento y Workover de pozos DURACIÓN TOTAL: 2011/ Campaña 2012 – 2013 UBICACIÓN: Tilodirán, Maní – Casanare, Colombia; Rio de Oro – Cesar, Colombia CAMPO: Vigía, Potros, Pimiento. CANTIDAD DE POZOS INTERVENIDOS: 12pozos, a septiembre de 2013 NPT: 1,1 % a septiembre de 2013 CANTIDAD DE HORAS OPERATIVAS: 3500 ACCIDENTES INCAPACITANTES: Cero (0)

  23. PROYECTO P1 PROYECTO:Completamiento y Workover de pozos DURACIÓN TOTAL: 1 año (2012 – 2013) UBICACIÓN: Tauramena, Maní– Casanare, Colombia CAMPO: La punta, Santo Domingo, llanos 32 CANTIDAD DE POZOS INTERVENIDOS: 6 pozos, a septiembre de 2013 NPT: 0 % a septiembre de 2013 CANTIDAD DE HORAS OPERATIVAS: 1400 ACCIDENTES INCAPACITANTES: Cero (0)

  24. PROYECTO PETRÓLEOS SUDAMERICANOS PROYECTO:Workoverde pozos DURACIÓN TOTAL: Campaña 2013 UBICACIÓN: Maní – Casanare, Colombia CAMPO: Entrerríos CANTIDAD DE POZOS INTERVENIDOS: 1pozo, a septiembre de 2013 NPT: 0 % a septiembre de 2013 CANTIDAD DE HORAS OPERATIVAS: 250 ACCIDENTES INCAPACITANTES: Cero (0)

  25. PROYECTO SANTA MARIA PETROLEUM PROYECTO:Workoverde pozos DURACIÓN TOTAL: Campaña 2012 UBICACIÓN: Maní, Monterrey – Casanare, Colombia CAMPO: Canaguay CANTIDAD DE POZOS INTERVENIDOS: 5 pozos, a septiembre de 2013 NPT: 0 % a septiembre de 2013 CANTIDAD DE HORAS OPERATIVAS: 650 ACCIDENTES INCAPACITANTES: Cero (0)

  26. PROYECTO C&C ENERGY PROYECTO: Completamiento y Workoverde pozos DURACIÓN TOTAL: Campaña 2011 UBICACIÓN: Orocue– Casanare, Colombia CAMPO: Bloque Cravoviejo CANTIDAD DE POZOS INTERVENIDOS: 14 pozos NPT: 2,6 % CANTIDAD DE HORAS OPERATIVAS: 2100 ACCIDENTES INCAPACITANTES: Cero (0)

  27. PROYECTO RAMSHORN PROYECTO: Completamiento y Workoverde pozos DURACIÓN TOTAL: Campaña 2010 – 2011 UBICACIÓN: Orocue– Casanare, Colombia CAMPO: Cachicamo CANTIDAD DE POZOS INTERVENIDOS: 19 pozos NPT: 0,5 % CANTIDAD DE HORAS OPERATIVAS: 5050 ACCIDENTES INCAPACITANTES: Cero (0)

  28. PROYECTO PETRÓLEOS DEL NORTE PROYECTO: Completamiento y Workoverde pozos DURACIÓN TOTAL: Campaña 2010 – 2011 UBICACIÓN: San Martin y Rio de Oro – Cesar, Colombia CAMPO: Santa Lucia, Ángeles CANTIDAD DE POZOS INTERVENIDOS: 20 pozos NPT: 10,5 % CANTIDAD DE HORAS OPERATIVAS: 3200 ACCIDENTES INCAPACITANTES: Cero (0)

  29. PROYECTO VETRA PROYECTO:Workoverde pozos DURACIÓN TOTAL: 6 meses UBICACIÓN: Astrea– Cesar, Colombia; Puerto Asis– Putumayo, Colombia CAMPO: Quillazinga, Chimichagua CANTIDAD DE POZOS INTERVENIDOS: 5 pozos NPT: 0,9 % CANTIDAD DE HORAS OPERATIVAS: 2100 ACCIDENTES INCAPACITANTES: Cero (0)

  30. OUR MAIN CLIENTS & CONTRACTS CAMPAÑA DE COMPLETAMIENTO CON LOS EQUIPOS DISCOVERY 2 ,3 ,4 Y5, DURANTE LOS AÑOS 2010, 2011,2012 & 2013 EN CASANARE COMPLETION CAMPAIGNS WITH RIGS DISCOVERY 2 ,3 ,4 AND 5, DURING 2010, 2011,2012 & 2013 IN CASANARE Parex Resources Ltd. CAPAÑIA DE WORKOVER EN LOS POZOS BALLENAS, CON LOS EQUIPOS DISCOVERY-3 Y 6, EN LOS AÑOS 2012 & 2013. RIOHACHA, GUAJIRA. WORKOVER CAMPAIGN BALLENAS LAND WELLS, WITH RIG DISCOVERY-3 and 6, 2012 & 2013 LA GUAJIRA Chevron Petroleum Company CAMPAÑA DE PERFORACION Y COMPLETAMIENTO CON EL EQUIPO DISCOVERY 8 DURANTE 2012, 2013 Y 2014. CASANARE DRILLING AND COMPLETION CAMPAIGN WITH RIGS DISCOVERY 8 AND DISCOVERY-1, 2012- 2013 CASANARE Tabasco Oil Company CAMPAÑA DE COMPLETAMIENTO Y WORKOVER CON LOS EQUIPOS DISCOVERY 2, 3 Y 5, 2012, 2013 Y 2013. CASANARE COMPLETIONS AND WORKOVER CAMPAIGN WITH RIG DISCOVERY 2, 3 & 5, 2012 & 2013 CASANARE Geopark

  31. COMPLETIONS AND WORKOVER CONTRACT WITH RIGS DISCOVERY 2 AND 5, 2012-2013 CASANARE CONTRATO DE COMPLETAMIENTO Y WORKOVER CON LOS EQUIPOS DISCOVERY 5 AND 3, AÑOS 2012 Y 2013 EN CASANARE Petrominerales Colombia LTD. WORKOVER CON EL EQUIPO DISCOVERY 2 EN EL 2009. CAMPAÑA DE WORKOVER 2012-2013 CACHICAMO Y CRAVO VIEJO. CASANARE WORKOVER WITH RIG DISCOVERY 2 2009, WORKOVER CAMPAIGN 2012-2013 CACHICAMO AND CRAVO VIEJO Pacific Rubiales Corp. WELL ABANDONMENT TURNKEY CONTRACT WITH RIG DISCOVERY-1, 2011, CASANARE CONTRATO LLAVE EN MANO DE ABANDONO DE POZO CON EL EQUIPO DISCOVERY-1EN 2011. CASANARE Occidental de Colombia Inc. WORKOVER CONTRACT WITH RIG DISCOVERY 3 AND 5, 2012 AND 2013 IN CASANARE CONTRATO DE WORKOVER CON LOS EQUIPOS DISCOVERY 3 Y 5, EN LOS AÑOS 2012 Y 2013 EN CASANARE Petrobras Colombia Ltd.

  32. WORKOVER AND WELL SERVICE CAMPAIGNS WITH RIGS DISCOVERY 1, 2 & 4 , 2010, 2012 & 2013 CASANARE CAMPAÑAS DE WORKOVER CON LOS EQUIPOS DISCOVERY 1, 2, 3 & 4 , EN LOS AÑOS 2010, 2012 & 2013. CASANARE Perenco Colombia Limited WORKOVER AND WELL SERVICE CAMPAIGNS WITH RIGS DISCOVERY 1 and 4, 2011-2012& 2013 CASANARE CAMPAÑAS DE WORKOVER CON LOS EQUIPOS DISCOVERY 1 Y 4, AÑOS 2011-2012 & 2013. META Y CASANARE New Granada Energy Corp. CAMPAÑA DE WORKOVER CON LOS EQUIPOS DISCOVERY 1 Y 4, EN LOS AÑOS 2010, 2011, 2012 Y 2013 CASANARE WORKOVER AND WELL SERVICE CAMPAIGN WITH RIGS DISCOVERY 1 AND 4, 2010, 2011, 2012 and 2013 CASANARE CEDCO WELL SERVICE AND WORKOVER CONTRACT WITH RIGS DISCOVERY 1 AND 4, 2010 – 2014 CASANARE/CESAR CONTRATO DE WORKOVER CON LOS EQUIPOS DISCOVERY 1 Y 4, DEL 2010 AL 2014. CESAR Y CASANARE Emerald Energy Plc.

  33. CAMPAÑA DE COMPLETAMIENTO Y WORKOVER CON LOS EQUIPOS DISCOVERY 1, 2, 3, Y 4 AÑOS 2012 Y 2013 EN CASANARE COMPLETIONS & WO CAMPAIGN WITH RIGS DISCOVERY 1, 2 & 3, 2012 CASANARE P1 Energy Corp. WORKOVER CONTRACT WITH RIG DISCOVERY 4. 2013, CASANARE CONTRATO DE WORKOVER CON EL EQUIPO DISCOVERY 4. 2013, CASANARE WORKOVER CONTRACT WITH RIG DISCOVERY 3 and 5 2011-2013, CASANARE CONTRATO DE WORKOVER CON LOS EQUIPOS DISCOVERY 3 Y 5 EN LOS AÑOS 2012 Y 2013, CASANARE. Santa Maria Petroleum CAMPAÑA DE COMPLETAMIENTO Y WORKOVER CON LOS EQUIPOS DISCOVERY 3 Y DISCOVERY 4. 2011, CASANARE COMPLETIONS AND WORKOVER CAMPAIGN WITH RIG DISCOVERY 3 and DISCOVERY 4, 2011, CASANARE C&C Energy

  34. WORKOVER CONTRACT WITH RIG DISCOVERY 3 and 5 2011-2012, CASANARE CONTRATO DE WORKOVER CON LOS EQUIPOS DISCOVERY 3 Y 5, AÑOS 2011-2012, CASANARE Quetzal Energy CONTRATO DE WORKOVER CON LOS EQUIPOS DISCOVERY 1, 2, Y 3, AÑOS 2012 – 2013 CASANARE WELL SERVICE AND WORKOVER CONTRACT WITH RIGS DISCOVERY 1, AND 2 , 2012 – 2013 CASANARE UNION TEMPORAL OMEGA-P1 Energy COMPLETION CAMPAIGNS WITH RIGS DISCOVERY 2, 3and 5, 2010, 2011 – 2012, CASANARE CAMPAÑAS DE COMPLETAMIENTO CON LSO EQUIPOS DISCOVERY 2, 3Y 5, AÑOS 2010, 2011 – 2012, CASANARE Ramshorn Intenational Limited WORKOVER AND WELL SERVICE CAMPAIGN WITH RIG DISCOVERY 1, 2009, CASANARE CAMPAÑA DE WORKOVER CON EL EQUIPO DISCOVERY 1 EN EL 2009, CASANARE Hupecol Operating Co. LLC.

  35. WORKOVER AND WELL SERVICE CAMPAIGN WITH RIG DISCOVERY 1, 2010 – 2011, CESAR CAMPAÑA DE WORKOVER CON EL EQUIPO DISCOVERY 1, 2010 – 2011, CESAR Petróleos del Norte S.A. CAMPAÑA DE COMPLETAMIENTO EN ARJONA Y CAMPO SURORIENTE CON EL EQUIPO DISCOVERY-3, 2011 – 2012. CESAR Y PUTUMAYO DRILLING/COMPLETION CAMPAIGN ARJONA and Suroriente WELLS, WITH RIG DISCOVERY-3, 2011 – 2012 CESAR and PUTUMAYO VETRA EXPLORACION Y PRODUCCION