Ince Biomass Energy Plant - The SOLID Approach

The site is located in waste land with 9-12m of underlying alluvial clay. This was compounded by the lack of detailed loadings information at the design stage. Based on the ground investigation report provided by the client, the piles were initially estimated at between 35-40m long. Our SCIA models were crucial in analyzing differential and final displacements of the various structures. Explore this PDF for complete information.

Download Presentation

Ince Biomass Energy Plant - The SOLID Approach

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ince Biomass Energy Plant THESOLIDAPPROACH

  2. About Project InceBiomassEnergyPlantutilizes advancedgasificationtechnologyto process170,000tofwoodwasteannually. Itproduces21.5MWofrenewable electricity. Itisexpectedtosave65,000t ofcarbondioxideeachyear; the equivalentoftaking40,000averagecars offtheroad.

  3. Gallery