From an Oil Field Waste Stream - Electrical Power 3 rd B.C. Unconventional Gas Technical Forum

From an Oil Field Waste Stream - Electrical Power 3 rd B.C. Unconventional Gas Technical Forum. Lyle A. Johnson , PE , RMOTC, U.S. DOE. RMOTC Location. 3 rd B.C. Unconventional Gas Technical Forum, Victoria, B.C. 17-WX-21 Madison and Tensleep Possibly 35 MBWPD flowing.

suchin
Download Presentation

From an Oil Field Waste Stream - Electrical Power 3 rd B.C. Unconventional Gas Technical Forum

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. From an Oil Field Waste Stream - Electrical Power 3rd B.C. Unconventional Gas Technical Forum Lyle A. Johnson, PE, RMOTC, U.S. DOE

  2. RMOTC Location 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C.

  3. 17-WX-21 Madison and Tensleep Possibly 35 MBWPD flowing TENSLEEP PRODUCING AREA 57-WX-3 Madison and Tensleep Possibly 10 MBWPD flowing OTHER POSSIBLE TENSLEEP SOURCE WELLS AND DEEPENING CANDIDATES Precambrian granitic basement structure Geothermal Potential 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C.

  4. Water Treatment Pond 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  5. Water Treatment Ponds 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  6. Project Goals The project is to validate the use of a binary geothermal power generation system that uses hot produced oilfield water to produce electricity. Test the system for a minimum of 1 year Provide a technical and economic analysis of the process Testing partner: ORMAT Nevada, Inc. 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  7. Projected Generator Performance Unit designed and built by Ormat Systems Ltd, Yavne, Israel. 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  8. 5000 Barrel Tank Moving 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  9. 5000 Barrel Tank Moving 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  10. Setting of Vaporizer 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  11. Setting of 2nd Condenser 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  12. Cooling Fan Motor 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  13. Cooling Fans 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  14. Working Fluid Piping 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  15. Return Vapor Piping 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  16. Completed Unit 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  17. Operational Trends 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  18. Daily Power Fluctuation 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  19. Daily Ambient Temperature 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  20. On Line Total, Total (Actual) days 161 (151) Inlet Brine Temperature °F 195-198 °C 90-92 Inlet Brine Volume Barrels 3,047,370 m3 484,493 Net Power Produced kilowatt hour 586,574 Overall On line percentage % 91 Average net power kilowatt 159 Overall w/o Field Downtime On line percentage % 97 Average net power kilowatt 171 Avg. Net Power Jan-Feb 2009 kilowatt 200 Operational Summary 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C

  21. Perform equipment checkout, maintenance and repair, to include: Change system control to a source control loop with an additional control valve, and Install vapor bypass line around turbine to ease unit starting, and Install a vibration monitoring system, and Heat trace all oil lines to prevent oil thickening. Continue testing of the unit until at lease September 2009 Future Plans 3rd B.C. Unconventional Gas Technical Forum, Victoria, B.C