An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012

  2. Roll

  3. Agenda • Roll Call – Admin • Announcements – Eric (5 mins) • ‘Round-the-Room for Harmonized Specs – Eric (10 mins) • Phased Approach to Harmonization for Remaining Specs – Judith/Ed (10 mins) • ‘Round-the-Room for Phasing Approach – Eric (10 mins) • Test Execution and Test Architecture – Ed (10-15 mins) • Definition of Done – Ed (5 mins) • Test Case Metrics – Ed (7 mins) • Open Discussion – All • Wrap Up - Eric • RFP Schedule Review - Eric

  4. Announcements • Harmonized PRL (PD/QD/RD/MP/AF) Tests Are Drafted • No objections were received and are now candidates for “done” status • Future changes are possible, but will be incorporated into the next phase of test cases design and implementation • We will do a ‘round-the-room next on the status • RFP • Has 5 respondents • Bidder interviews have been conducted top few vendors • Analysis is nearing completion

  5. ‘round-the-room Do you object to the harmonized test specifications (presented over the last few weeks) being considered final? The scope of this question is the harmonized specifications for Patient Record Lookup (aka Patient Discovery, Query for Documents, and Retrieve Documents + Messaging Platform and Authorization Framework).

  6. Harmonization Phases Unified Test Process – Has Been Proposed

  7. Phase II Work Plan: Direct Test Specs * More detailed status is should be posted on the Wiki

  8. Phase III Work Plan: Secondary Specs • Secondary Methods, Service Discovery, & Provider Directories

  9. ‘round-the-room What are your thoughts about the phased approach for harmonization? Feedback is needed, especially if you or your organizations to the proposed approach.

  10. Test Case Execution • Manual: Step-by-step instructions are included in written test packages • Draft tracking worksheet for execution methods • What tests are the best candidates for tooling? • soapUI as a component, review different uses of it • Other utilities/components to research? • What about the conformance checklists?

  11. Architecture Review • Refresh on Reference Toolkit concept • Check-in on feedback to high-level Toolkit architecture • Assumptions on prioritization at utility level • Message simulation for High test cases in PD/QD/RD • Proof of concept of lightweight orchestration (BDD layer) • Integration of NIST content tools (c32 then CCDA) • Ideas/volunteers for utilities, modules, or approaches?

  12. Test Execution Metrics • Tracked through status (Unsorted, Untargeted, Research, in-Development, Peer Review or Pilot, Final) and Priority (High, Medium, Low, Zero) • Written tests priority x ease/benefit of execution x importance of spec/functionality = Overall Priority* • Execution tracker will be fleshed out with numbers for medium/low/zero priorities and detailed methods over time

  13. Open Discussion

  14. RFP Schedule Review • RFP released — July 2nd  • Questions received by 6 organizations • Answers distributed — July 13th • Bids due — July 20th • Expected award — August 15th • Contract start — TBD We are here