1 / 38

China Deep Underground Laboratory and Dark Matter Search

China Deep Underground Laboratory and Dark Matter Search. Hesheng Chen Institute of High Energy Physics. Yalong River and Jingpin Hydropower station.

takoda
Download Presentation

China Deep Underground Laboratory and Dark Matter Search

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. China Deep Underground Laboratory and Dark Matter Search Hesheng Chen Institute of High Energy Physics

  2. Yalong River and Jingpin Hydropower station Yalong river locates the west of Sichuan, with length of 1571km and drop height of 4420m. 21 Hydropower stations are planned, with total electricity of 30GW.

  3. Big U-turn at Jingpin mountain

  4. High Mountain and Canyon

  5. F28 F6 F5 F27 Geological structure of Jingpin mountain • The peak of the mountain:4193m • Maximum rock overburden of tunnels ~2525m • Rock cover larger than 1500m >70% • Challenges for tunnel construction • High geostress: 11.11~ 46.41MPa., Max:70MPa • Rock burst: mainly right after excavation • Rich underground water: 5~7m3/s, pressure 10MPa

  6. Tunnels at Jingpin Mountain 2525m 约17km

  7. Tunnels at Jingpin Mountain • Four water tunnels: length of 16.67km • two of diameter of 12.4 m: TBM • two of diameter of 13m: drilling and blasting, • Two traffic tunnels: 5.5×5.7m、6×6.25m, length of 17.5km • One drain tunnel with diameter of 7.2m, length of 17.5km (only used during construction, and could be used for super big volume experiment!) • maximum Overburden 2525m

  8. TBM for water tunnels

  9. Both traffic tunnels were run-through Aug. 2008, to be opened by end of this year 交通洞A和B • 建设选址

  10. Traffic tunnel under construction • 建设选址

  11. Site visit Feb. 27, 2009

  12. The radioactivity of the rocks from the center of the traffic tunnel (8750 m) is very low. 8750m

  13. Comparison of main UL’s in world(Unit: M.W.E) 1400m OTO OSAKA Japan 2100m Y2L Korea 2000m SUL USA 2450m Canfranc Spain 2800m Boulby UK 2700m Kamioka Japan 3500m LNGS Italy 3500m INO India 4500m DUSEL USA 4400m Baksan Russia 7500m CDUL China Tunnel 4800m Modane France 7000m 6000m SNO Canada Mine Deep Underground Lab

  14. Infrastructureavailable in the hydropower station

  15. Good motorway to airport: 1.5 hour

  16. Deep Underground Lab. at Jingpin Mountain • The tunnel group at Jingpin mountain provides an unique opportunity to build a world class deep underground lab for multiple science research. • Deepest in the world • Horizontal Tunnel access • Convenient transportation, good infrastructure • The best site for the national deep underground science and engineering lab. . Chinese funding agencies could support it. • The lab. should be international, and opened to World. • Two small experimental halls near the traffic tunnel B under construction.

  17. Two small exp. halls under construction 6X6X20 m

  18. Fragrant Hill Forum(25-26 Oct.) :Deep Underground Sciences & Engineering Participants: • Scientists from • Exp. and theo. physics: particle physics, nuclear physics, astrophysics, gravitation… • Geo-physics • Geology • Rock mechanics • Deep underground engineers • The Owner of the Hydropower station: Ertan Hydropower Development Company (EHDC) • Design and construction company • Funding agencies

  19. Purposes of the Forum To reach common understanding about • Importance of deep underground S&E research in China • Great opportunities in Jingpin mountain tunnel group • Needs to establish China Deep Underground S&E Lab. (CDUSEL) • Strategy and PlanningforCDUSEL To convince EHDC • To support CDUSEL • To provide the interface for the construction of CDUSEL in near future.

  20. The forum was success • The above common understanding reached • Possible initial experiments discussed • Demand to the CDUSEL design and plan. • Construction: Staging • A working group for CDUSEL, including scientists and engineer from major fields and major institutions and Univ., as well as EHDC, established. Chair: Hesheng CHEN. • Funding agencies (CAS, MoST and NSFC) support the idea of CDUSEL.

  21. EHDC supports the Lab. • Vice-CEO of EHDC expressed • Their understanding and support to CDUSEL. • Agree to support the interface for the construction of CDUSEL. • Condition: no risk to construction and commissioning of hydropower stations. • The approval from the EHDC board needed.

  22. Working on Proposal of CDUSEL • CDUSEL belongs the catalog of “large fundamental science research facility” in the Chinese funding system. • The key agency for the national lab. is the state commission of development and reform. • The funding procedure for CDUSEL will be rather long.

  23. Underground experiments in China • Underground experiments in China • Double b decay (44Ca) in coal mine of Beijing (1986-1990) • Dayabay reactor neutrino experiment • Join International collaborations • DAMA at LNGS • XENON at LNGS • CsI(Tl) crystal detector at KIMS • Kamland • SuperK • …

  24. Daya Bay Reactor Exp. Near-far cancellation Two near sites and one far sites connected by ~3000 tunnel Event rate: ~1200/day near ~350/day far backgrounds: B/S ~0.4% near B/S ~0.2% far Ling-Ao near: 2 modules, 40 t target 500m to Ling-Ao overburden: 112m far: 4 modules, 80t target 1600m to Ling-Ao 1900m to Daya Bay overburden: 350m 0% slope 0% slope 0% slope entrance entrance Daya Bay near: 2 modules, 40 t target 360m to Daya Bay overburden: 98m 8% slope

  25. Detector design: multiple detector modules and multiple VETO Multiple detector modules to reuce errors and cross check Multiple muon veto: Two-layers of cerenkov detector RPC at the top Total efficiency > (99.5  0.25) % Redundancy is a key for the success of this experiment

  26. Excavation of EH 1 Lining of access tunnel

  27. 2009-8-14

  28. Stainless Steel Vessel 1st SSV complete fabrication in Jan. Full load test, negative pressure test, laser survey, etc.  1 month This is the first large item arriving SAB. Test assembly in SAB

  29. Experiment Proposals in Jingpin Many discussions about the possible experiments for the deep underground lab. at Jingpin. • China Dark matter EXperiment (CDEX) by Tsinghua Univ. • XENONIT by Shanhai Jiaotong Univ..

  30. CDEX Plan Phase-I (2009.12-2010.12) -- 20g ULE-HPGe detector @ CDUL -- Shielding system construction -- HPGe detector for radioactive measurement -- Radon monitor system Phase-II (2010.12-2011.12) -- ULE-HPGe detector(~500g) Phase-III (2012-) -- ULE-HPGe detector(~10kg scale)

  31. Detector and Shielding OFHC Anti-Compton Detector LN2 Ge Target Crystat

  32. Detector and Shielding

  33. XENONIT: Shanghai Jiaotong Univ. • Collaborating with XENON to develop the next generation dark matter detector based on “two-phase xenon” technique. • One ton Xe active mass • 1000 PMT

  34. Activities in IHEP • Major part of the detector team is working for Daya Bay. Good experience for low background experiments. • Establishing a low background Lab. for the future program of Daya Bay and deep underground experiments. • R&D on noble liquid detectors Xe and Ar. • Working on proposal of dark matter search experiment at Jingpin deep underground lab. and look for collaboration. • Good detector and technical teams.

  35. Other R&D Activities • R&D on superheated Liquids: Chinese Institute of atomic energy, which has good experience with low background nuclear physics exp..

  36. Nuclear Astrophysics: Heavy iron accelerator • High voltage Accelerator: • Energy:: 50 - 500 keV (phase I), 5 MeV (phase II) • Iron type: p - Fe • Current: 1 mA • Target system : gas target system • Detectors system Phase I: (40208 m)

  37. Gravitation wave detection: Atom interferometer AI1 LAI = 10 m Atom interferometer L = 2000 m AI2 AI1 AI2

  38. Closing Remarks • The tunnel group at Jingpin mountain provides an unique opportunity to build world deepest deep underground lab with horizontal access for multiple science research. • Chinese scientific community reached the common understanding to establish China Deep Underground S&E Lab. (CDUSEL) • Support from owner (EHDC). • Strategy and Planning agreed. The working group established. • R&D on dark matter exp. • Possible first experiments: • rock mechanics • dark matter search exp. • International collaboration welcomed.

More Related