At the beginning there were two canals:

Scottish Canal Engineering. At the beginning there were two canals: 1. The Forth and Clyde Canal was built in 1777 between harbors Grangemouth and Falkirk, connecting Glasgow with the west coast of Scotland; 2. Union Canal, between Falkirk and Edinburgh, was finished in 1822.

tamah
Download Presentation

At the beginning there were two canals:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scottish Canal Engineering At the beginning there were two canals: 1. The Forth and Clyde Canal was built in 1777 between harbors Grangemouth and Falkirk, connecting Glasgow with the west coast of Scotland; 2. Union Canal, between Falkirk and Edinburgh, was finished in 1822. Because of geographical difficulties, which created a difference of 79ft. in elevation, the two canals were connected by 11 locks by a huge water carousel - started in 1963 and finished in 2002.

  2. This is the only rotational boat transporter in the world. It has two arms, and each arm forms a kind of huge tub filled with water.Boats enter the tub, then the tub locks up and the huge arm starts rotating…

  3. Lower canal…

  4. Entrance to lower canal…

  5. A Boat is approaching the “tub”…

  6. At top of the “tub”…

  7. 35 m There are boats in bothupper and lower “tubs”…

  8. Rotation is starting…

  9. Boats in both rotating arms…

  10. Rotation…

  11. Just before “landing”…

  12. One 78ft. long “tub”, with water and boat, weights about 300 tons.

  13. Closing of the gate, regulation of level of water, and “tubs” rotation takes only 15 minutes. The “tubs” are filled according the Archimedes’ Law, so the weight of the “tubs” are balanced. An engine of 22.5 kW is required to open the upper and lower lock and turn the whole system by 180º, which uses only 1.5 kWh.

  14. joe-ks.com