An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MP3 report – week 21-22 20/5/2010 – 02/06/2010 MP3/QPS team in CCC LMC: June 3rd 2010

  2. Average of 2.5 interventions / 24 hoursUpdated 02/06/2010 19h00 LMC: June 3rd 2010

  3. Week 22. • RCBXH1.R2 => Trip during the night. Known issue related to zero crossing; work in progress to introduce corrective actions. • RB.A34 => QPS not ok due to water flow problem LMC: June 3rd 2010

  4. Week 22 – QPS Boards change in 67. • New QPS boards were installed in the sector, tests performed to validate: • 2KA at 7A/s • 4KA at 7A/s • 2KA at 10 A/s • 6KA at 10 A/s All test were successful! LMC: June 3rd 2010

  5. Week 22 – QPS Boards change in 67. LMC: June 3rd 2010

  6. Week 22 – • QPS communication was lost in sector 78; at inj. Level. Power cycle needed before ramping • 25 correctors tripped due to orbit feedback • Trip of RQTD.A81B2; Trip (and beams were lost). Water fault problem • RD2.R8 => PC fault caused trip of the circuit • RB.A81 => tripped twice: The task to reset the nQPS crate starts while calibration is still ongoing. Problem solved by implemented bugfix • RD2.R8 => PC fault, access needed • Sector 6-7 => Trip due to a nQPS (noisy) card (had to be changed) LMC: June 3rd 2010

  7. Week 22 – • Trip of sector 6-7 (happened twice) due to nQPS on RQF; threshold exceeded on B15L7 due to unknown noise.. LMC: June 3rd 2010

  8. Week 22 – • RQ10.L2B2 => Trip due to noise picked by QPS • RCBH34.L7B1 => Trip due to DCCT fault LMC: June 3rd 2010

  9. 28th of May : 18kV/66kV drop LHC was ramping down (I_RB ≈ 5800 A) As a consequence, all circuits tripped (FPA at 2A/s for the mains) • RB.A45 (MB.B21R4) : heater discharge • RB.A81(MB.C32L1) : heater discharge • MQ.25L1 : Only 1 of 2 heaters fired LMC: 3rd of June 2010