An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter two ROAD TO DESIGN BUILD

  2. ROAD MAP • THE COST PLUS GUARANTEED MAXIMUM PRICE CONTRACT (GMP) • CM • PM • DB IS THE LATEST STAGE: NEW PERSPECTIVE ON QUALIFICATIONS , A CLEAR DEFINITION OF THE PROJECT PROGRAM, PERFORMANCE SPECIFICATION, OWNER’S REPRESENTATIVE AND THE CONTRACT

  3. PROCESS OD DESIGN BUILD • COMPETITIVE BIDS IS DIFFERENT THAN DBB • THREE ISSUES: ACCEPTANCE OF DESIGN, SCOPE OF WORK AND TOTAL COST • RFP • WEIGHTED CRITERIA METHOD-PTS SYSTEM • ADJUSTED LOW BID • THE EQUIVALENT DESIGN AND LOW BID • A FIXED PRICE-BEST DESIGN APPROACH

  4. DB • ADVANTAGES AND DISADVANTAGES • BRIDGING DESIGN APPROACH TO DB: DESIGN-DESIGN-BUILD, OWNER RESPONSIBILITIES, BRIDGING CONSULTANT AND DESIGN BUILD FIRM

  5. HOW EFFECTIVE IS DB? • DB VS DBB-SIZE • PUBLIC VS PRIVATE • INDUSTRIAL PROJECTS • OVERALL-COST, SCHEDULE, SAFETY, CHANGES AND REWORK

  6. ISSUES IN DB • QUALITY: OWNERS/DP/ORGANIZATIONS