POCANTICO HILLS CENTRAL SCHOOL. BOARD OF EDUCATION DESIGN REPORT October 7, 2008. Items of Review. Areas of Approval for Construction Document Production Roof Gymnasium Principal/Nurse Guidance/Resource Pool. Roof Replacement/Repair.

telyn
Download Presentation

BOARD OF EDUCATION DESIGN REPORT October 7, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POCANTICO HILLS CENTRAL SCHOOL BOARD OF EDUCATIONDESIGN REPORTOctober 7, 2008

  2. Items of Review • Areas of Approval for Construction Document Production • Roof • Gymnasium • Principal/Nurse • Guidance/Resource • Pool

  3. Roof Replacement/Repair • Roof scan shows that insulation is still good and reusable • Modified bituminous material • Replace skylights • Repair slate at hips • Replace gutters

  4. Gymnasium Enhancements • Lockers • Floor refinished • Bleachers

  5. Principal/Nurse Alterations

  6. Guidance/Resource Alterations

  7. Swimming Pool

  8. BOARD OF EDUCATIONDESIGN REPORTOctober 7, 2008