1 / 48

Monitoring Road Works Contracts and Unit Costs in Sub-Saharan Africa for Enhanced Governance

Tanzania Roads Fund Board. Monitoring Road Works Contracts and Unit Costs in Sub-Saharan Africa for Enhanced Governance. Cesar Queiroz Consultant, former World Bank Highways Adviser Dar es Salaam, Tanzania July 2, 2012. Construction and Maintenance Unit Costs Workshop. OUTLINE.

terence
Download Presentation

Monitoring Road Works Contracts and Unit Costs in Sub-Saharan Africa for Enhanced Governance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tanzania Roads Fund Board Monitoring Road Works Contracts and Unit Costs in Sub-Saharan Africa for Enhanced Governance Cesar Queiroz Consultant, former World Bank Highways Adviser Dar es Salaam, Tanzania July 2, 2012 Construction and Maintenance Unit Costs Workshop

  2. OUTLINE • Building a new dataset of road works contracts of Bank-financed projects in Sub-Saharan Africa • Analyzing trends and key indicators • Examining “red flags” • Explaining what drives road construction costs: issues addressed by project implementing agencies • Enhancing accountability and attaining a higher degree of control of corruption in World Bank-financed projects in the road sector • Conclusions

  3. 109 completed and on-going road and bridge works contracts 76 supervision consultancy contracts for relevant road works Signed between 1999 and 2007 From 22 projects financed by the World Bank Range of works contracts: From US$595,518 to US$58,436,429 For 13 countries in Sub-Saharan Africa: Congo Democratic Republic of Congo Ethiopia Ghana Kenya Malawi Mauritania Mozambique Madagascar Nigeria Tanzania Uganda Zambia A SPECIALIZED DATABASE

  4. DATABASE: SET OF COST INDICATORS Road Works Unit Costs in 2007 US$ Road Works Costs for 7-m wide, 2-lane road equivalent in 2007 US$/km

  5. DATABASE: SET OF BIDDING INDICATORS Contracts with Pre-qualification Contracts without Pre-qualification Number of applicants for pre-qualification Number of pre-qualified firms Number of firms buying bidding documents Number of bidders Number of bidders accepted for detailed examination Number of firms buying bidding documents Number of bidders Number of bidders accepted for detailed examination • Bid Amounts • Name and Nationalities of All Bidders

  6. DATABASE: SET OF OTHER INDICATORS DATES • Bid Opening Date • Contract Signing Date • Contract Completion Date • Delays in Completion of Work SUPERVISION CONSULTANCY • Names and Nationalities of Supervision Consultants • Supervision Contract Amount • Actual Supervision Contract Amount

  7. KEY STATISTICAL TRENDS • The road sector contracting of Bank-financed operations is characterized by a limited number of firms dominating large-scale works • The market is split between African firms and mainly Chinese and European contractors • The largest contracts are generally awarded to international contractors, in particular Chinese Percentage of Contracts by Geographical Group Share of Contract Totals by Geographical Group

  8. KEY TRENDS: BIDDING PATTERNCONTRACTS WITH PRE-QUALIFICATION • About half of the pre-qualified firms do not bid • The overall number of pre-qualified firms to bid for large works seems competitive (more than 6 firms on average). However, the actual participation in tenders is quite low Average Number of Pre-qualified Firms, Bidders, and Bidders Accepted for Detailed Examination

  9. KEY TRENDS: BIDDING PATTERNCONTRACTS WITHOUT PRE-QUALIFICATION • Half or more firms buying bidding documents do not bid in the reviewed contracts in Mozambique, Madagascar, DRC, Zambia, and Malawi Average Number of Firms Buying Bidding Documents, Bidders, and Bidders Accepted for Detailed Examination, by Country

  10. KEY TRENDS: BIDDING PATTERNCONTRACT VALUE AND ENGINEER’S ESTIMATE • Several road works contract values exceed the engineer’s estimate by more than 30 percent Differencebetween Contract Values and Engineer’s Estimates, Averages and Ranges

  11. KEY TRENDS: BIDDING PATTERNBID OPENING AND CONTRACT SIGNING DATES • Extensions of the original bid validity period seem to be a norm • Only the DRC, Congo, and Madagascar have the contracts awarded within the original period of validity of bids (90 or 120 days in the sample)

  12. KEY TRENDS: IMPLEMENTATIONCOST OVERRUNS • Contract cost increase during implementation is substantially high in some of the countries in the sample Cost Overruns, Averages and Ranges by Country

  13. KEY TRENDS: IMPLEMENTATIONCOST OVERRUNS (cont’d) • Cost overruns vary across the countries. The highest number of contracts with cost overruns is in Nigeria where almost 43 percent of all the reviewed contracts increased their value by more than 15 percent. Mozambique and Ghana had cost overruns in 30 percent of the contracts in the sample Percentage of Contracts with Cost Overruns of more than 15% by Country

  14. KEY TRENDS: IMPLEMENTATIONTIME OVERRUNS • The delays in completion of work reaches up to a year and half Average Delay in Completion of Work in Months, by Country

  15. KEY TRENDS: ROAD WORKS COST PER KM OF A 7-M WIDE, 2-LANE ROAD

  16. KEY TRENDS: ROAD WORKS COST PER KM OF A 7-M WIDE, 2-LANE INTER-URBAN ROAD • A wider range of the average costs per km is observed for the re-gravel and periodic maintenance works; the range is relatively narrower for the upgrade to paved and rehabilitation/reconstruction works Cost per km of a 2-Lane Road by Type of Work for Inter-Urban Roads (2007 US$/km)

  17. KEY TRENDS: UNIT COSTSASPHALT CONCRETE AND PORTLAND CEMENT CONCRETE (2007 US$/M3) • Large variations are observed in the unit costs of road works across the countries in the sample

  18. KEY TRENDS: UNIT COSTSBASE AND SUBBASE (2007 US$/M3)

  19. KEY TRENDS: UNIT COSTSEARTHWORKS AND SURFACE TREATMENT (2007 US$)

  20. KEY STATISTICAL TRENDS BY GEOGRAPHICAL GROUP OF CONTRACTORS • The African firms outperform the Chinese and European contractors in several indicators related to the procurement process but underperform in the implementation Statistical Averages by Geographical Groups

  21. KEY TRENDS BY GEOGRAPHICAL GROUP OF CONTRACTORS: COST PER KM • The African firms have a cost advantage over the Chinese and European firms in the sample, when implementing rehabilitation or reconstruction works or upgrading a road to pavement standards Cost per km of a 2-Lane Road Equivalent by Geographical Group and Type of Work (2007 US$)

  22. LEADING ROAD WORKS CONTRACTORS • A Chinese contractor carried out about 19% of Bank-financed road works in the sample (in financial terms) • The total value of road works contracts in the sample is about US$ 1.5 billion Leading Contractors by Awarded Contract Totals

  23. SUPERVISION CONSULTANCY CONTRACTS: RATIOS • The supervision contract amounts vary between 3% and13% of the respective road works contract amounts in the countries reviewed Ratio of Supervision Contract Amounts to Road Works Contract Amounts

  24. SUPERVISION CONSULTANCY CONTRACTS: COST PER KM • There is a wide range between the average costs of supervision per kilometer of similar road works across the countries Average Cost of Supervision per km of a 2-Lane Road by Country (2007 US$)

  25. SELECTION OF ‘RED FLAGS” • The following is a set of “red flags” that was selected under the study: • Period between bid opening and contract signing is more than 7 months • Cost increases by more than 20% during implementation • Time overrun is more than 30% of the originally contracted period • Contract value is more than 20% above the Engineer’s Estimate • Half or more firms buying bidding documents do not bid • 20% or more of pre-qualified firms do not bid • Difference between winning bid and next lowest bid is within 2% • Difference between contract price and read-out bid price is more than 10% • Winning bid is not the lowest bid accepted for detailed examination • Only one or two bidders • Cost per km for similar works and unit road works costs are higher than the 75% percentile

  26. EXAMINATION OF ‘RED FLAGS” • An inventory of risks was performed for each road works contract using a checklist of “red flags” • The presence of “red flags” does not prove that corrupt or fraudulent practices have taken place in the procurement and implementation of a contract • A red flag is rather a warning signal of a potential procurement and implementation problem that may justify further investigation • Conversely, the absence of “red flags” does not imply that fraud or corruption did not occur

  27. 30 25 20 15 10 5 0 More than 7 month period from bid opening to contract signing Delay in completion more than 30% of the contract duration period 20% or more of prequalified firms fail to bid Contract value more than 20% higher than estimate Half or more firms buying bidding documents don’t bid Winning bid not the lowest bid accepted for detailed examination Difference between contract price and read-out bid price is >10% Cost/km by type of work is higher than the 75th percentile Variation order>20% Less than 3 bidders Difference between winning bid and next lowest bid is within 2% “RED FLAGS”: FREQUENCY IN THE SAMPLE OF 109 CONTRACTS

  28. “RED FLAGS”: FREQUENCY BY COUNTRY

  29. “RED FLAGS” NORMALIZED BY NUMBER OF CONTRACTS IN EACH COUNTRY

  30. “RED FLAGS” NORMALIZED BY NUMBER OF CONTRACTS IN EACH COUNTRY AND WBI CONTROL OF CORRUPTION INDEX

  31. “RED FLAGS”:IN THE CONTRACTS WITH COMPLAINTS RECEIVED BY INT • The Department of Institutional Integrity (INT) received complaints on 14 contracts from the sample of 109 road works contracts (13% of total) • The nature of complaints was mainly related to allegations of bidder collusion or bid rigging, paying bribes, and bidding irregularities • The pattern of “red flags” in the contracts with complaints received by INT slightly differs from the overall pattern observed across all the contracts in the sample

  32. 70% 60% 50% 40% 30% 20% 10% 0% 20% or more of prequalified firms fail to bid More than 7 month period from bid opening to contract signing Cost per km by type of work/type of road higher than the 75th percentile Contract Value more than 20% higher than the estimate Winning bid not the lowest bid accepted for detailed examination Delay in completion more than 30% of the contract duration period Less than 3 bidders Variation order more than 20% Half or more of firms buying bidding documents fail to bid Difference between winning bid and next lowest bid is within 2% Difference between contract price and read-out bid price is within 10% “RED FLAGS”:PATTERNIN THE CONTRACTS WITH COMPLAINTS RECEIVED BY INT Governance and Anti-Corruption in Transport

  33. “RED FLAGS”:ROAD WORKS UNIT COSTS Frequency of “Red Flags” for Unit Costs in the Contracts with Complaints Received by INT in Comparison with other Contracts in the Sample

  34. SELECTED ISSUES AS ADDRESSED BY PROJECT IMPLEMENTING AGENCIES • Reasons for high bids: • The effect of increase in prices of fuel, power, materials, and equipment on major cost items of contracts • A fixed price contract that is not subject to price adjustment • Supply and demand effect • Potential collusion by bidders • Inadequate prediction of major market forces by the engineer’s estimate • Perception of risks incorporated by bidders in their bid prices (e.g., provisions of extended contract procurement cycle time associated with price inflation risks) • Other factors (e.g., a delayed delivery of goods due to congestion and transport problems, the high cost of input taxes, political instability and insecurity)

  35. OTHER SELECTED ISSUES • Reasons for low response to invitation to bid: • Increased demand for contractors’ services • Insecure areas in a post-conflict country (DRC) • Reasons for cost overruns • Global trend of rising oil prices • Labor cost increase and impact of other regulatory measures (taxation) • Unsatisfactory contractor performance • Time lag between design and contract execution dates • Time extensions

  36. RECOMMENDED ACTIONS • The following is a set of selected recommendations geared to enhance accountability and attain a higher degree of control of corruption in Bank-financed projects in the road sector in Sub-Saharan Africa: • Consider establishing a tighter timeframe for contract signing. A stricter adherence to the Bank’s procurement guidelines should be observed that provide for an extension of bid validity “if justified by exceptional circumstances” (Procurement Guidelines). A delayed bid evaluation process provides opportunities for corrupt practices and back-door negotiations. • Allow using a selection procedure of post-qualification in bidding for large works instead of pre-qualification. Knowledge of other pre-qualified firms carries a potential risk of collusion. Also, other firms may choose not to bid due to a potential collusion of well-connected companies.

  37. RECOMMENDED ACTIONS • Create a system to monitor and assess contractors’ and consultants’ performance. Tracking of information on contractors and consultants in the road industry in the region could mitigate risks of misjudging on qualifications of firms as well as ensure due diligence on poor performers. The rankings of major contractors and consultants could identify strong performers who could be encouraged to bid or hired through direct contracting in case of emergencies. • Strengthen the monitoring over the procurement and implementation processes to enhance detection of the risks to integrity. It is important to generate the data to increase accountability.

  38. CONCLUSIONS • It is critical to continue collecting data on the procurement and implementation processes of the road sector contracts to allow comparison of cost trends, bidding competition, and performance in the road sector. A standardframework (including a template) has been developed within this study to provide the platform for monitoring and evaluation of prices, bidding data, and contractor’s information to help improve governance. • Capturing costs and unit price information of road works is important for evaluation of the trends across countries and regions. Empirical evidence could be built on such indicators as price increases relative to the engineer’s estimates, cost increases, and key roads input costs to investigate the sources of increased costs and possible factors behind the increase in bid prices.

  39. CONCLUSIONS • Assessing bidding behavior is essential formeasuring the level of competition and road works activity financed by the Bank. Verifying the extent of competition in the bidding environment is an important tool for procurement decisions. Detailed bidding data could facilitate measuring if the procurement process is affected by collusion and bid rigging through detection of patterns and “red flags” in the structure of bids and firms. • Measuring performance more consistently would help to address inefficiencies that arise in the current procurement and implementation practices. This would ensure that irregularities are properly captured in the observed trends in a specific country or area. It is important to link the performance measures to contractors and consultants as well as project implementing agencies for accountability.

  40. Thank you!

  41. References • “Monitoring Road Works Contracts and Unit Costs for Enhanced Governance in Sub-Saharan Africa.” World Bank Transport Paper No. TP-21. 2008. http://siteresources.worldbank.org/INTTRANSPORT/Resources/336291-1227561426235/5611053-1229359963828/tp_21.pdf • “Monitoring Road Works Contracts and Unit Costs for Enhanced Governance in Europe and Central Asia.” World Bank Transport Paper No. TP-33. 2011. http://go.worldbank.org/9XN7FBUCD0 • “Prediction model for the cost of road rehabilitation and reconstruction works.” 2nd International Conference on Road and Rail Infrastructure, Dubrovnik, Croatia, 7-9 May 2012. http://www.grad.hr/cetra/ocs/index.php/cetra/cetra2012

  42. AttachmentAn example of a regression model to predict the cost of road works Source: “Prediction model for the cost of road rehabilitation and reconstruction works.” 2nd International Conference on Road and Rail Infrastructure, Dubrovnik, Croatia, 7-9 May 2012 http://www.grad.hr/cetra/ocs/index.php/cetra/cetra2012

  43. Example of a regression model to predict the cost of road rehabilitation and reconstruction Y - the dependent variable Xi - independent variables p - the number of independent variables ε - the residual error i - regression coefficients, and 0 - a constant

  44. Methodology • Data sample covered 94 completed or on-going road works contracts in Europe and Central Asia • The correlation between independent variables was tested • Four diagnostic methods were used for testing the dataset for outliers: • Analyses of the (square) residuals • Standardized residuals • Cook’s distance • Leverage matrix • A backward analysis was used based on the removal of the variable with the highest p-value

  45. Resulting regression models *p-value < 0.01, **p-value < 0.05, ***p-value < 0.1

  46. Comparison of predicted and actual cost per km

  47. Resulting regression models

  48. Cesar QueirozRoad and Transport Infrastructure ConsultantFormer World Bank Highways AdviserTel +1 301 755 7591queiroz.cesar@gmail.comWashington, DC, USA