1 / 7

MP3 report – week 15 6/4/2010 – 11/04/2010 9 interventions + 10A/s ramp rate testing

MP3 report – week 15 6/4/2010 – 11/04/2010 9 interventions + 10A/s ramp rate testing. MP3/QPS team in CCC. Extraction switches problems. Intervention on Monday for a RB.A78 energy extraction switch. Micro-switch problem Intervention on Tuesday for a RQTD.A81B1 energy extraction switch

tessa
Download Presentation

MP3 report – week 15 6/4/2010 – 11/04/2010 9 interventions + 10A/s ramp rate testing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MP3 report – week 15 6/4/2010 – 11/04/20109 interventions + 10A/s ramp rate testing MP3/QPS team in CCC Monday Morning Meeting : 12th of April 2010

  2. Extraction switches problems • Intervention on Monday for a RB.A78 energy extraction switch. • Micro-switch problem • Intervention on Tuesday for a RQTD.A81B1 energy extraction switch • No real problem. Procedures updated Monday Morning Meeting : 12th of April 2010

  3. Undulator trip on Tuesday. • Trip of the RU.L4 ; slow drift of U_res ; can be included in combo rampdown-precycle and precyclesubsequences when main circuits are at the lowest current Monday Morning Meeting : 12th of April 2010

  4. RQTD/RQTF trips from feedback • Feedback incompatible with QPS protection • Meeting on Friday organized by A. Siemko • A solution seems possible by changing the time discrimination. Monday Morning Meeting : 12th of April 2010

  5. Ramp rate fix type test on Thursday • Type test performed on S56; new cards installed for the EE with a delay of 400ms in the odd points and 580ms in the even points. Monday Morning Meeting : 12th of April 2010

  6. Ramp rate fix type test • Successive tests with FPA via PIC at 2, 4 , 6 kA while ramping up to 10A/s  no magnet triggered! • Test successful, reverted to the old cards for operation (at 2A/s ramp rate). Monday Morning Meeting : 12th of April 2010

  7. MP3 issues since 6th of April 2010 • The second part of the week was remarkably quiet with very few problems • RCBXH1.R1: power cycle problem: in case of need for a power cycle, access is needed. Will be fixed in next technical stop • RQT13.L8B1: operational limit of 300A is not enough to squeeze in LHCb – limit changed to 352A. Medium term plan .... Monday Morning Meeting : 12th of April 2010

More Related