1 / 31

PROMEEC 3 Projects for 2006-2007 - Achievement and Future Plan – ASEAN EE&C SSN

ECCJ. PROMEEC 3 Projects for 2006-2007 - Achievement and Future Plan – ASEAN EE&C SSN. June 6, 2007 Yoshitaka Ushio General Manager, International Engineering Dept. The Energy Conservation Center, Japan. ECCJ. Confirmation of Target and Basic Approach for Phase - 2. ECCJ.

trinh
Download Presentation

PROMEEC 3 Projects for 2006-2007 - Achievement and Future Plan – ASEAN EE&C SSN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECCJ PROMEEC 3 Projects for 2006-2007 - Achievement and Future Plan – ASEAN EE&C SSN June 6, 2007 Yoshitaka Ushio General Manager, International Engineering Dept. The Energy Conservation Center, Japan

  2. ECCJ • Confirmation of Target and Basic • Approach for Phase - 2

  3. ECCJ Unexpected Conditions Economy Energy Situations Policy Importance of Self Effort Energy / Business Market Various Changes Level of capability to Promote EE&C Sustainable Basis To Be Built By “Continued SELF EFFORT” Learning From ECCJ Time Phase - 1 Phase - 2

  4. ECCJ Target for Phase - 2 Effective Digestion and Ensured Sustainability to Implement / DisseminateWhat ASEAN Learned 1. Enhanced OJT Based on (1) Well Organized Local Core Team for Survey / Energy Audit / Seminar (2) Better Preparation for Survey / Energy Audit (3) Preparatory Activities (Pre-survey, etc.) 2. Preparation of Tools for Implementation (1) Accumulation of Achievements / Experiences (2) Standardized Data, Information and Guideline (3) Easier Access and User-friendliness 3. Effective & Harmonized Inter-Project Activities

  5. ECCJ Phase – 2 : Formation to Implement Local Activities Based on “Enhanced OJT” Basic Required Scheme for Site Activities with Flexible Assistance by ECCJ Future Core Team For Implementation & Dissemination (*) “Local” means “National” and/or “Regional “.

  6. ECCJ Achievement and Experience Based Project Activities ASEAN Customers One-Stop to System Advisory Service Information Service Energy Audit Regist. Experts ASEAN Network of Cooperators “ASEAN Energy Management System” Campaign/ Award System Training Service Coordination ECCJ “ASEAN Energy Management System” Developing to Sustain Phase-2 Activity Sustainable System Provision of Tools & Information for E.M.

  7. 2. Achievement in 2006 - 2007

  8. Project Team of ECCJ

  9. ECCJ Actual Team Formation & Features- Major Industries for 2006 – 2007 -

  10. ECCJ Summary of Seminar-Workshop Numbers of Seminar Participants, 2005 & 2006 Seminar-Workshop Host Country + ASEAN + ACE + ECCJ = Total Country Lao PDR 49 + 5 + 2 + 3 = 60 Ave. = 56 2006 Thailand 41 + 4 + 2 + 3 = 50 Myanmar 49 + 3 + 2 + 3 = 57 Brunei 92 + 3 + 2 + 3 = 100 Cambodia 52 + 4 + 1 + 3 = 60 2005 Ave. = 65 Indonesia 48 + 4 + 5 + 3 = 60 Philippines 34 + 3 + 1 + 3 = 41

  11. Country EE&C Activities Industry Lao PDR Same presentation done in 2005 Hydro-power 2-stg recuperator, VSD for water pump, Screw air compressor Iron/Steel Ind Malaysia Overview of MIEEIP project (PTM), Food, Glass, Textile, Iron/Steel General Thailand Iron/Steel Ind Daylight, cooling tower fan blade, air compressor replace, etc Food Ind. Insulation, cond.recovery, steam leak, Solenoid valves, etc Iron/Steel Ind Same presentation done in 2005 Philippines VRM, 5-stg NSP, Damper→VSD, Process A/M, Air leak repair (Kiln), O2 meter for Air leak, Air press 7Bar→6.8 Cement Ind. Vietnam Same presentation done in 2004 Ceramics Ind Iron/Steel Ind. Slab preheat, slab hot charge, billet insulation cover, etc Indonesia Same presentation done in 2004 Pulp/Paper Ind. Lower tower pressure, tower off gas recovery Oil Refining Myanmar Cement Ind. ECCJ Presentation Items from ASEAN Countries

  12. ECCJ Actual Team Formation & Features- Buildings for 2006 – 2007 -

  13. ECCJ Seminar-Workshop (1)Number of the Participants

  14. ECCJ Seminar-Workshop Presentations by the Guests from ASEAN Thank you very much for the supports

  15. ECCJ Actual Activities & Number of Participants and Visits to Companies- Energy Management for 2006 – 2007 -

  16. ECCJ Actual Schedule of PROMEEC for2006 – 2007 (3 Projects) (As of Feb. 27, 2007)

  17. ECCJ Summary of Achievement in 2006 – 2007 (1) 1. Main Success Successful Progress in Local Activities Based on Organized Local Team with Their Efforts and in Preparation of Tools for Energy Management (1) Teams Consisted of National & Regional Engineers (2) Pre-Audit in Building Project (3) Actual Improvements Realizing in Factories and Buildings Energy-Audited in The Past (3) Preparation of Tools for E.M. with The Target to Establish “ASEAN E.M. System” (4) Start-up The 1st ASEAN Award of Best Practices in Energy Management

  18. ECCJ Summary of Achievement in 2006 – 2007 (2) 2. Required Future Improvement Identified Ensured basis of actual implementation through the following with some specific targets (1) Further enhance OJT in site Activities with moreinvolvement of local persons (2) Deepen understanding of process principle for industries (3) Proceed with in-depth analyses having wider viewpoints based understanding of the concept on environmentally friendly sustainable buildings (4) Introduce training & workshop to disseminate / improve In-house Database and TechnicalDirectory

  19. ECCJ 3. Proposed Future Plans after 2007

  20. ECCJ PROMEEC (Major Industries)Proposed Activities in 2007-2008 (1) 1. Follow-up survey / Energy Audit / Workshop under Enhanced OJT at 3 Countries (max): (Purpose) Enhanced implementation & dissemination of improvements Country A - Industry 1 Country B - Industry 2 Country C - Industry 3 - One country one industry. Audit place should be conveniently within or near the capital city for saving of time. - Industry is to be proposed, but preferably selected from rather light industry, for example, textile, food, ceramics and plastics. 2. Preparation of “Technical Directory for major industry” (with ECCJ/ACE – EE&C-SSN) - Successful cases resulted from PROMEEC activities should be registered.

  21. ECCJ PROMEEC (Major Industries)Proposed Activities in 2007-2008 (2) 2. Preparation of “Technical Directory for major industry” (continued) - Revise web-page so that readers can access more easily to the subjects. Expansion with Inputs from PROMEEC activities and from Invited “Technology Suppliers” 3. Discussion and study to developIn-house Databaseincluding Benchmark / Guideline for individual industries - Strengthen PR activity on every opportunity so as to make industry recognize a significance of DB/BM/GL through Training / Workshop for Participants of Activities

  22. ECCJ PROMEEC (Buildings)Proposed Activities in 2007-2008 (1) 1. Follow-up Survey / Additional Energy Audit in 4 ASEAN Countries (Singapore and other 3 countries) - OJT for the local engineers (More involvement of the local engineers and giving the opportunity for the engineers from other ASEAN countries to join the audits) - Identification of the present energy consumption and their own benchmark (Target) - Identification of the barriers and the actual implemented measures recommended by their own team or the Japanese experts through the energy audit - Recommendations for EE & C - Identification of Barrier and Measures <Each country to propose how to implement these activities or the other alternatives> 2. Local Seminar-Workshop for dissemination in Singapore and other 3 countries (Inviting the presenters from the host Country (at least 2 successful cases) and other ASEAN Countries (4 cases))

  23. ECCJ PROMEEC (Buildings)Proposed Activities in 2007-2008 (2) 3. Development of Technical Directory by all the ASEAN countries (Previous PROMEEC audit results, the information and data from the ASEAN Energy Award, etc.) including information from Invited “Technology Suppliers” 4. Improvement / Utilization of In-house Database / Benchmark / Guideline for Building by all the ASEAN countries (Previous PROMEEC audit results, the information and data from the ASEAN Energy Award, etc.) 5. Continued Joint Activities with “ASEAN Benchmarking” 6. Continued activities for the support to the evaluation by BOJ for ASEAN EE & C Award System of Best Practice and Energy Management for Buildings

  24. ECCJ PROMEEC (Energy Management)Proposed Activities in 2007-2008 (1) Basic Direction of Activities (1) Smooth Operation of “ASEAN Award System of Best Practices in Energy Management for Industries and Buildings (2) Start-up The System to Utilize The Existing Implementing Organizations (3) Preparation / Development of Handbooks and Directories as Follows 1) “Energy Management Handbook” (Completion) 2) Preparation for Trial Use of The E.M. Handbook with In-House Database and Technical Directory at Cooperation Factories and Buildings 3) Development of e-Directory and Other Handbooks (4) Preparation of One-Stop Guidance, etc.

  25. ECCJ PROMEEC (Energy Management)Proposed Activities in 2007-2008 (2) The Following Activities at 6 Countries (Max.) 1. Intensive Seminar-Workshop (1) Introduce and Discuss Functions / Programs of “ASEAN E.M. System” with Training and Advice to Utilize Tools (2) Encourage Participants to Join Programs / Activities of PROMEEC and “PROMEEC Family Network” 2. Visit to Factories and Buildings (1) Same Purpose as Item 1 (2) Advice on Trial Use of E.M. Handbook or Follow-up at Awarded Companies 3. Research Forum in Japan (1) Improvement in Operation and Evaluation Guideline of The Award System by Analyses of Results of The 1st Competition (2) Improvement in Functions, Programs and System of “ASEAN E.M. System” Considering User-friendliness

  26. ECCJ Proposed Procedures & Conditions to Apply to the Countries for Local Activities Purpose To ensure the Building Local Core Teams for enhanced implementation and dissemination of the activities in future Proposed Procedures as Follows 1. Proposal by Focal Points with Requests for - Specific Project(s), and - Specific Industries (Major Industries), or - Specific Buildings (Buildings) 2. The proposal to be submitted to ACE until May 31st, 2007 (with clarification of requests and compliance with PROMEEC required Conditions)

  27. ECCJ Required Conditions to Call Application of Countries for Local Activities Proposed Procedures as Follows (Continued) 3. Selection of the countries & project categories) (Avoid to select the same country & project as implemented in 2006 – 2007 for Major Industries and Buildings) 4. Discussion/Finalization (Inception Workshop) Required Conditions for Proposal 1. Ensured Organization of Local Core Teams - With clarification of the expected organization and roles of core Members - Localrestrictions to discuss, if any 2. Ensured Preparation for Follow-up Survey / Energy Audit and Seminar-Workshop

  28. ECCJ Basic Plan and Schedule of PROMEECfor 2007 – 2008 (3 Projects)

  29. The Second East Asia Summit was convened in Cebu, the Philippines, on January 15, 2007 • Promotion of Energy Efficiency and Conservation - Receive 1,000 trainees and dispatch 500 experts in five years. - Establish Asia Energy Conservation Collaboration Center. - Make full use of yen loan and JBIC loan facility. 2.Promotion of Biomass Energy 3.Clean Use of Coal • Eradication of Energy Poverty Japan’s initiative entitled ”Fueling Asia –Japan’s Cooperation Initiative for Clean Energy and Sustainable Growth” proposed by Prime Minister Abe

  30. Asia Energy Efficiency and Conservation Collaboration Center Asia Energy Efficiency and Conservation Collaboration Center contributes to promoting the efficiency use of energy in Asian counties through international cooperation on information service and One-stop window service for a variety of inquiries related to energy efficiency and conservation. ContactUs :  http://www.asiaeec-col.eccj.or.jp/