An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction to the LBDS systemand its functionality The function of the LHC beam dumping system is to fast-extract the beam in a low-loss way from each ring of the collider and to transport it to an external absorber, positioned sufficiently far away to allow for appropriate beam dilution in order not to overheat the absorber material. Fast extraction will require a particle-free gap in the circulating beam, during which the field of the extraction kicker magnets can rise to its nominal value. Given the destructive power of the LHC beam, the dumping system must meet extremely high reliability criteria, which condition the overall and detailed design. B.Goddard / J. Uythoven CERN TE/ABT Input from: W.Bartmann, L.Bruno, C.Bracco, E.Carlier, L.Ducimetière, D.Gerard, M.Gyr, J.M.Jimenez, N.Magnin, V.Mertens, A.Presland, L.Sarchiapone, R.Schmidt, R.Veness, W.Weterings and many others…

  2. The challenge Is not just to dispose of the LHC beam… …but to dispose of it • quickly (within a few turns, i.e. 100-200 ms) • safely (with an extremely low probability of dangerous failure) • robustly (insensitive to expected machine/system failures) • cleanly (with low distributed/uncontrolled losses) • efficiently (without inducing extra machine down time, i.e. quenches) • repetitively (re-usable dump block and protection devices)

  3. LHC beam dump principle (and acronyms) Dump block Dilution kickers Passive diluter Extraction septum Passive diluter Extraction kicker

  4. Underground structures UD62 TD62 UP62 UJ62 UJ63 RA63 UA63 RA67 ~1500 m UA67 UJ67 UJ68 TD68 UD68 UP68

  5. Layout of components TCDQ [m] Extraction kickers Dilution kickers Dump block + shielding Extraction septa Passive protection Passive protection Vacuum line Entrance window Plus beam position and loss monitors, and dedicated interlocking (not shown)

  6. Extraction kickers (MKD) • Redundancy (14 of the 15 kickers are needed to extract beam) • Generators have two parallel discharge circuits, including two switches • Fast High Current Thyristor (FHCT) solid-state switches • Local capacitors remain charged and voltage constantly monitored. • Erratic on one switch re-triggers other 14 switches within 700 ns (unsynchronised with gap) • Redundant UPS system ensures correct dump in event of general power cut; • All trigger and re-triggering lines are doubled. • Check all systems operated correctly (redundant branches, triggering, current waveforms…) Ceramic vacuum Chamber (coated) Conductor Strip-wound Core

  7. Beam dump block (TDE) • 700 mm  graphite core, with graded density of 1.1 g/cm3 and 1.7 g/cm3 • 12 mm wall, stainless-steel welded pressure vessel, at 1.2 bar of N2 • Surrounded by ~1000 tonnes of concrete/steel radiation shielding blocks 0.7 m 3.5 m 3.5 m beam 1.7 g/cm3 1.1 g/cm3 1.7 g/cm3

  8. System Safety Redundancy 14 out of 15 MKD, 1 out of 2 MKD generator branches Surveillance Energy tracking, Retriggering Surveillance Reference energy taken from 4 Main Dipole circuits TX/RX error detection Voting of inputs Surveillance Energy tracking, Fast current change monitoring (MSD) Redundancy 1 out of 2 trigger generation and distribution Surveillance Synchronization tracking Redundancy 1 out of 4 MKBH, 1 out of 6 MKBV Surveillance Energy tracking • System safety is based on: • Built in redundancy • Continuous surveillance • Post Operational Checks (IPOC/XPOC)

  9. Dump synchronisation Extraction kicker MKD deflection dump trigger LHC Beam 3.0 ms particle-free abort gap • Transient (3-89 ms) losses will occur: • If the dump trigger is not synchronised with the abort gap • If the abort gap contains spurious particles • If the MKD kick is not in tolerance • If the local orbit is out of tolerance

  10. Risk from particles in the abort gap • Asynchronous beam dump or over-populated abort gap  quench or damage • Several failures possible (synchronisation, MKD erratic, abort gap repopulation) • Precautionary measures include: • Abort gap watchdog during the injection process, to inhibit injection with wrong phase • Abort gap monitor and possibility of abort gap cleaning: in operation at full energy since 2012 • TCDS (fixed) – 6 m long diluter protects extraction septum • TCDQ/TCS (mobile) – 7 m long diluter kept at about 7-8 s from the beam, at all times

  11. Functional Architecture of 1 MKD Generator 4 triggers coming in from BIS(and 2 going out) Two parallel switches, full redundancy in each generator Surveillance of voltage = kick angle See presentation A.Antoine

  12. Power Cut • In this case the beam will clearly need to be dumped because most other equipment will stop working • Beam dumping system kickers are on 2 parallel, redundant Uninterruptable Power Supplies (UPS) • UPS required: • Trigger Synchronisation Unit needs power from UPS to start the trigger of the beam dump • All other power is stored in capacitors, ready to be ‘released’ at the moment of trigger • Beams were correctly dumped:

  13. Safety Study • Ph.D. thesis Roberto Filippini (CERN-THESIS-2006-054) • FMECA analysis • More than 2100 failure modes at component levels • Components failure rates from standard literature (Military Handbook) • Arranged into 21 System Failure modes • Operational Scenarios with State Transition Diagram for each Mission = 1 LHC fill • State Transition Diagram for Sequence of Missions and checks Likelihood of any unacceptable failure Availbility Can learn a lot from relative numbers ! Obligatory !

  14. Reliability Run Operation only below 5.5 TeV, due to MKB break down Operation ‘with beam’ at injection energy Beam 2 System pulses = 19 magnets Beam 2 Data from 8/11/07 to 19/09/08

  15. Reliability Run: Internal and External Post Operational Checks (IPOC / XPOC) MKD pulse • 741’057MagnetPulses Analysed with IPOC and XPOC Systems • > 10 years of operation • Some hardware problems discovered  Contact erosion on generators. GTO stack surveillance. Replacement program and regular testing. • No critical failures on the MKD system which would have resulted in a non-acceptable beam dump even if redundancy would not be there • No ‘asynchronous’ beam dumps were recorded (erratics). No missings. • However, unexpected MKB breakdown  Common failure mode by vacuum • Global confirmation of assumed component failure rates

  16. Post Operational Checks • Every beam dump (extraction) is automatically analysed • Any out of tolerance kicker waveform, or more than usual beam losses, will block the next injection • Redundancy of signal paths for triggering checked at every beam dump • Kicker waveform failures can only be reset by the system experts • Not the Engineer In Charge in the control room • Not the piquet / technician from the standby service • This provides the ‘as good as new’ assumption used in the reliability calculations leading to SIL4 classification

  17. XPOC check of extraction kicker 15 MKD magnets, with 2 redundant current pick-ups each, based on different technologies Other XPOC checks

  18. Safety critical aspects of the Dump System • Signal from beam interlock system and triggering • No trigger = no beam dump • Energy tracking • Potentially catastrophic (whole beam at “any” amplitude) • Extraction kicker retriggering after single kicker erratic • No retriggering could put whole 7 TeV beam at ~10s • Mobile protection device setting • Wrong w.r.t. orbit exposes LHC arc / triplets / collimators. • System self-tests and post-mortem • Undetected ‘dead’ MKD severely reduces reliability • Aperture, optics and orbit • Dump with bad orbit could damage extraction elements MSD, TCDS or MKB • Extraction – dilution kicker connection and sweep form • Insufficient dilution could damage TDE, BTVDD and TDE entrance window • Abort gap ‘protection’ • Beam in the abort gaps risks quench, or TCT/LHC damage if TCDQ position error • Fault tolerance with 14/15 extraction kickers • The system is designed to operate safely with only 14 out of the 15 MKDs Nearly all aspects need beam commissioning (validation or optimisation)

  19. Summary and conclusion • The LHC beam dump is a critical system for machine protection • Safety has been built into the design from the start • “Risk” inherent in using pulsed kicker magnet systems • Conventional technological choices have been used • Large redundancy, monitoring, failsafe components • Areas for concern are known and are checked during operation • Reliability analysis was useful tool for finding weaknesses • Only as good as the system analysis and fault statistics… • Reliability run proven to be useful • Confirm reliability assumption and no critical failures • Some discoveries used for follow-up before first beam • Foreseen again, about 100 days, after Long Shutdown 1 • “No trigger = no dump”! • This equation is still generally true! • Efforts now being made to ameliorate effects of ‘beyond design’ failures • Powering failure in combination with missing UPS still one of the main worries