An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. L3 chamberarrived in bd 154 Michele Bianco, Maria Hoffmann, GiviSekhniaidze, JoergWotshack Weekly MicroMegas Meeting 28/05/2013

  2. Mechanicaldifferences with L2 • First HV test

  3. Mechanicaldifferences with L2 (Gas distribution) L2 Drift panel Gas distribution skin honeycomb frames honeycomb frames skin Gas distribution

  4. Mechanicaldifferences with L2 (Gas distribution) L3 transversal section Gas distribution Mesh frame support

  5. New internal spacers Hole in the mesh to accommodate the screw. A Kapton ring has been applied to avoid shortcuts between mesh and resistive strips. Screws which will keep the distance fixed, are not yet applied. For this reason the gas in not perfect gas tight.

  6. First HV test Impedance test during the assembling phase. RIGHT Side Adopted the same naming schema used for L2 chamber AR BR BL Side A AL Side B LEFT Side

  7. First HV test The L3 chamber has been positioned above to the L2, and connected to the gas line from the L2 output. The HV channel used for the L2, have been used to test L3 Current absorption (readout panel) , few nA up to 580 Volts.

  8. Summary • Second 2,2 x 1 m2 Micromegas chamber has been build, it is almost complete and under test in our lab. • No particular problem arise from the preliminary HV tests. • Dedicate tests, to verify the new layout, have to be performed, in particular for the new internal spacer. • Possible conflict with the use of APV, now used for Tmm/T chambers test, next week will be shipped to DESY for the testbeam, than only 10 APV card will be available in the lab, not enough to test half chamber in one shot.