1 / 13

ITU FORUM : C-Band Matters 1 November 2013, Nadi, Fiji

ITU FORUM : C-Band Matters 1 November 2013, Nadi, Fiji. C-BAND WRC 15: A Regulatory Priority for the Pacific Islands. Panny Yokope Engineering and Resource Planning, NICTA, PNG. PROGRESS WITH IMT STUDIES -. ITU Joint Task Group 4-5-6-7 4 Sharing study scenarios under consideration

vance
Download Presentation

ITU FORUM : C-Band Matters 1 November 2013, Nadi, Fiji

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITU FORUM : C-Band Matters1 November 2013, Nadi, Fiji C-BAND WRC 15: A Regulatory Priority for the Pacific Islands Panny Yokope Engineering and Resource Planning, NICTA, PNG

  2. PROGRESS WITH IMT STUDIES - ITU Joint Task Group 4-5-6-7 4 Sharing study scenarios under consideration GSMA, Japan, UK, USA Outcomes will be 4 different estimates of “exclusion zone” sizes required for satisfactory sharing of terrestrial IMT and satellite services Each estimate will address short term and long term availability criteria We have examined examples of 20 km and 150 km

  3. THE PACIFIC ISLANDS – Scenario • Critical dependency on C-Band for communications for economic existence and social quality of life • Disaster mitigation and relief • Submarine cable – where available – only serves a single landing point. There are many islands • C-Band provides a complementary backbone role for future mobile (eg. 4G in Kiribati) • Ku and Ka band are heavily affected by rain fade • Wrong decisions at WRC 2015 would be crippling The value of C-Band

  4. There are four broad categories of applications relying on C-band: APPLICATIONS ON C-BAND • two-way large dishes (e.g. trunk telephony) – licensed • two-way Very Small Aperture Terminals (VSATs) (e.g. Banking terminals and ATM networks) – licensed • receive only commercial applications (e.g. cable head ends) – • registered • receive only consumer applications (e.g. DTH satellite TV • broadcasting) – unlicensed terminals, such as SKY Pacific • which broadcasts in C-Band to Pacific Islands

  5. PNG : Nationwide C-Band Sites -source NICTA

  6. PNG : NATIONWIDE LAYOUT - 20km Protection Zone -source NICTA

  7. PNG : Major Centres -150km Protection Zone -source NICTA

  8. PNG Registered TVRO stations -source NICTA

  9. ASIA – PACIFIC COUNTRIES- Dependency on C-Band Countries and their dependency on C-Band Satellite. Dependent on C-Band Not Dependent on C-Band Uncoloured is not defined yet

  10. THE PACIFIC ISLANDS – A Regulatory Strategy

  11. STRATEGIC MILESTONES

  12. CONCLUSION • Regulators have concerns for their clients • Co-ordinated regional collective action is efficient • Experiences of WRC 2007 will be valuable at WRC 2015 • A Regional regulatory priority is recommended • PI’s have an opportunity to influence through contributions to appropriate meetings

  13. THANK YOU..

More Related