1 / 8

1 x 1 m 2 chamber

1 x 1 m 2 chamber. Status. 1 x 1 m 2 sketch (not to scale). 1. FR4 + Cu ( Rui ). 4. 2. 3. 15. Stiffening panel. 5.05. 5.00. 30. 8. Aluminium support plate. Rohacell. FR4 ( SCEM: 44.98.90.010.4 ). 5. PCB. Status & plans.

wardj
Download Presentation

1 x 1 m 2 chamber

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1 x 1 m2 chamber Status J. Wotschack

  2. 1 x 1 m2 sketch (not to scale) 1 FR4 + Cu (Rui) 4 2 3 15 Stiffening panel 5.05 5.00 30 8 Aluminium support plate Rohacell FR4 (SCEM: 44.98.90.010.4) 5 J. Wotschack

  3. PCB J. Wotschack

  4. Status & plans • MM boards were glued yesterday (Monday, 23 July) to support panel • Mesh was glued yesterday to drift gap panel at Seritec (Vevey) • Plan to measure Wednesday/Thursday the straightness of the panels using the NA62 laser interferometer • Assembly Thursday + first mechanical and electrical tests • Mounting of connectors Friday or early next week? • Tests in lab with source and cosmics • Installation in H6 in 2nd half of next week ? J. Wotschack

  5. Some photos of glueing the MM boards to the support panel J. Wotschack

  6. J. Wotschack

  7. Glueing the panels to Al plate Assembly with MM face down on flat table Distributed weights on assembly while curing J. Wotschack

  8. Drift electrode panel J. Wotschack

More Related