An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Primary School Expansion Cranmer Primary School Wednesday 20 October 2010

  2. Process for Cranmer • Bulge classes” in 2010/11 & 2011/12 a school admissions decision • Specific planning application for temporary buildings • Expansion from 2012/13 = “Significant enlargement” requires a statutory process • Separate major planning application required

  3. Births: 360 of 807 rise – 447 to go!

  4. Expansion Programme 21 FE total - 630 extra reception places in 6 years)

  5. Reception year expansions 2008 to 2010 and 2011 to 2012 for consultation

  6. Key criteria in expansion decisions • Educational standards • Parental preference • Location and issues of pupil transport (home to school) • Physical constraints of existing school sites • School sustainability • Value for money

  7. Next steps for Cranmer • Vision for school to inform building brief • Building feasibility study • Capital funding decisions in early 2011 • Statutory consultation on permanent build • Permanent building by September 2013