1 / 5

PCE Database Requirements

PCE Database Requirements. draft-dugeon-pce-ted-reqs-02.txt O. Dugeon, J. Meuric (Orange) R. Douville (Alcatel-Lucent) R. Casellas (CTTC) O.D de Dios (TiD). Change since version 01. Enlarge the scope of the draft to PCE Database Requirements Add LSP DB as part of requirements

wkatrina
Download Presentation

PCE Database Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PCE Database Requirements draft-dugeon-pce-ted-reqs-02.txt O. Dugeon, J. Meuric (Orange) R. Douville (Alcatel-Lucent) R. Casellas (CTTC) O.D de Dios (TiD)

  2. Change since version 01 • Enlarge the scope of the draft to PCE Database Requirements • Add LSP DB as part of requirements • LSP knowledge is also required for efficient Global Concurrent Optimization • Add PCE Database model for inter-domain part • Propose a simple model to define what needs to be exchanged • Goal: protocol requirements, not how to compute metrics • Enhance requirements for the PCE Database population • Requirements for PCE Database synchronization between PCE

  3. Inter-domain PCE Database model • Contrary to intra-domain, the PCE inter-domain database does not contain the same detail level • Keep topology confidential • Avoid scalability problems • Introduction of a "Grey-Box“ model to allow PCE known sufficient detail on foreign domain • Inputs and outputs correspond to the Border Nodes (BNs) • Grey-Boxes are interconnected through inter-domain links between BNs • Suitable performance indicators are given to connect and to cross the Grey-Boxes • TE metrics between Input BNs and Output BNs • Reminds some of the L1VPN work • PCE could look into the different inter-domain paths • Combine TE metrics of inter-domain links and Grey-Boxes • Select the most suitable one regarding the PCReq Domain(i) Domain(i+1) Inter-Domain Link BN BN BN BN Inter-Domain Link Inter-Domain Link + TE metrics + TE metrics + TE metrics Grey-Box TE metrics Grey-Box TE metrics

  4. Inter-domain status for PCE Database Population • PCE Database needs synchronization with other PCEs for inter-domain cooperation • BRPC and Hierarchical PCE would benefit from it • A PCE is the owner of metrics within its own domain and they must not be modified by another PCE • No aggregation or summarization are allowed • But some filtering/redistribution rules are needed (e.g. to reflect peer agreement) • Ongoing identified solutions • Management plane • North bound distribution of LSDB using BGP [draft-ietf-idr-ls-distribution] • PCNtf message to convey TE information of foreign domains • Today inside vendor attribute, tomorrow in a standard way? • PCEP extensions for stateful PCE raised the point • New PCEP messages for LSP DB synchronization • Why not consider PCE Database synchronization as a whole? • New draft common to all requirements on TED + LSP DB

  5. Next Steps • Get feedback from PCE WG • Some private e-mails, public discussion is also useful • PCE Database synchronization is a hot topic • LSP DB synchronization part of PCEP extension for Stateful PCE • Opportunity to federate PCE Database definition and PCEP extension to synchronize PCED? • Our next move: issue a -03 version • Taking into account GMPLS part • Adding analysis and best-current practice for intra-domain solutions • Adding analysis of inter-domain solutions

More Related