1 / 17

Presentation Outline

NYCT Subway Car Program “Building on Success” Presented to NYCTRC Michael P. Wetherell, P.E. Acting Chief Mechanical Officer Department of Subways April 26, 2012. ,. Presentation Outline. New Millennium Rail Car Initiative R-160 Project Overview R-188 Project Discussion

xue
Download Presentation

Presentation Outline

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NYCT Subway Car Program“Building on Success” Presented to NYCTRCMichael P. Wetherell, P.E.Acting Chief Mechanical OfficerDepartment of SubwaysApril 26,2012 ,.

  2. Presentation Outline • New Millennium Rail Car Initiative • R-160 Project Overview • R-188 Project Discussion • New Projects - R-179 and Beyond

  3. New Millennium Train Initiative R110A & R110B New Technology Test Trains

  4. New Millennium Fleets

  5. R-160 Fleet • 1662 60 ft B Division Cars • Assigned toNMJZQEFL Lines • NYCT’s Best Performing Fleet to date – over 700k - 12 Month Rolling MDBF • Introduced new features

  6. R-160 Features • Ergonomic Cab • FIND Display • Enhanced Regeneration • Improved Door System • CBTC Ready – in CBTC service on L line • Light Weight Flooring

  7. R188 Project Overview • 126 New ‘A’ Division Cars & Conversion of 380 R-142A Cars (Kawasaki) • Provides 46 11-car trains for Flushing CBTC / 7 Line Extension service • Communication Based Train Control • Convert R142A • New “C” Cars

  8. R188 Project Overview R188 11-Car Configuration Note: the 7 Line is the only NYCT subway line that runs eleven car trains

  9. R188 Project Overview • Base deliveries complete in December 2012 • First new Option train scheduled to be delivered May 2013 • 8 new trains forecasted to be accepted in time for opening of 7 Line Extension • Completion of delivery of all new and converted trains scheduled for January 2016

  10. R188 Project Status • Base Order: 23 New Cars + Conversion of 10 R142A Cars • Option Order: 103 New Cars + Conversion of 370 R142A

  11. R188 Project Status • 10 R142A Conversion cars were delivered in December 2011 • New Cars in Production • Critical Design Reviews, Qualification Tests, and First Article Inspections ongoing

  12. R188 Project Status • CBTC Ready: • Cars will be outfitted with wiring and housing to accommodate CBTC equipment to be provided by Thales under separate contract. NYCT is facilitating interface between the Carbuilder and CBTC Supplier

  13. R179 Project 300 60-foot ‘B’ Division cars replace 272 75-foot R44s Based on R-160 Design – Upgraded Communications EPA Compliant Refrigerant Reduced Weight

  14. In-Process Work Car Procurements • R-156/174 Locomotives • R-157 Flat Cars and CWR Cars • R-172 Ballast Regulators • R-190 Snow Throwers • Vacuum Trains (Specification Development)

  15. R157 Flat Cars R157 General Arrangement - R157 Production – Yonkers, NY

  16. R156/174 Diesel Locomotives MPI Boise, Idaho

  17. Future Project Overview • R211 ‘B’ Div cars to replace R46 fleet (752 cars) • Additional fleet growth cars as required • Next Generation design to address NYCT’s goals • Purchase proposed for 2015 – 2019 Capital Program