An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TES O&M 12 May, 2004 OMA Working Group TES O&M Steve DanielsProgram Manager

  2. Systems Supported Forward Depot Availability & Reliability Support From the Field Contents

  3. Systems Supported Deployed Depot: Dave Henneberry, Jim Walsh • 3 to 4 day FEDEX delivery possible to all current Army locations • Next day delivery by hand from the Forward depot as required. Agreement with Mantech to hand-deliver packages. • Line-haul used for trailers, ECUs and generators • Depot used to provision FSRs with satellite phones, body armour, tents, bicycles etc. • FWD #2 ECU swap, DTES #1 generator swap • FWD #4 MEV trailer damage fixed en-route at depot “Great work to all involved. Forward Depot is paying great dividends. Many thanks to MANTEC. “ LTC Eugene W. Skinner Jr. 14 January 2004

  4. Systems Supported Lessons Learned: • More PM time • Sparing more complete assemblies • ECUs, Generators, CIPs – More to come • Greater awareness of configuration differences • SCDL equipped DTES’s • Pending upgrades • FSR on-going training • More hands-on training for FSRs and the use of FSR training mentors • FSRs provide year to year continuity • Thorough cleaning and re-baselining after each deployment

  5. Program Summary Site Operational Availability (Goal of 96%): Site (Jan-June) (July- Dec) 2003 FWD 1 99% 99% 99% Main 1 99% 100% 100% FWD 2 100% 92% 96% Main 2 100% 99% 99% FWD 3 89% 99% 94% Main 3 98% 100% 99% FWD 4 100% 97% 98% DTES 1 100% 100% 100% DTES 2 100% NA 100% DTES 3 NA 100% 100% DTES 4 NA NA NA DTES 5 NA NA NA

  6. Program Summary Reliability Assessment: July – Dec 2003

  7. Program Summary Mission Critical Ao: July – Dec 2003

  8. Program Summary Reliability Assessment: Jan - March 2004

  9. Evaluation Criteria Contract Performance Evaluation Factor Category “A” Program Management • A – 1 Cost and Schedule • 2003 cost under plan • 2004 – 2008 contract signed 24 December • All deployments and exercises supported • On-time delivery of 22 CDRLs and minutes • Effective management of Boeing and L3 • Subcontractor Cubic being added to support the SCDL

  10. Evaluation Criteria Contract Performance Evaluation Factor Category “A” Program Management • A – 2 Problem Identification, Solution Development and Implementation • SWA Depot • Boeing FSR training and integration Three currently used, three more planned • Help Desk DSN line added (thanks to ASPO) • Configuration awareness

  11. Evaluation Criteria Contract Performance Evaluation Factor Category “A” Plans • A – 3 Planning • Quick reaction to changing schedules and conditions DTES 1 deployment • DTES 3 request for an extra FSR • Better utilization of FSRs in training has reduced O&M FSR training to an average of three months

  12. Evaluation Criteria Contract Performance Evaluation Factor Category “B” Logistics On-Site Support • B – 1 Availability • Goal of 96% Ao for the award fee period exceeded at all but one site • FSRs, with HQ support, improvise, adapt and find solutions

  13. Evaluation Criteria Contract Performance Evaluation Factor Category “B” Logistics On-Site Support • B – 2 Responsiveness • FSRs complied with all restrictions and deployment requirements • ASPO direction and RFIs responded to quickly • FSR support on-site flexible in terms of level of effort required • PM or Site Manager at all DD-250s to participate in inventory and setup of storeroom and brief the unit

  14. Evaluation Criteria Contract Performance Evaluation Factor Category “B” Logistics On-Site Support • B – 3 Completeness • All site “Open Issues” captured and tracked until completion • All site technical problems and failures captured and tracked to resolution then used for macro-analysis • Updates to drawings, tech manuals, FSR training plans tracked to completion • Feedback to production • FSR’s are members of the team • Everyone’s job is “whatever it takes to support the war fighter”

  15. Evaluation Criteria Contract Performance Evaluation Factor Category “C” Logistics – Depot Suport • C – 1 Hardware / Software • 259 Product Support Center (HELP Desk) reports logged July – December • 232 NMR Reports logged July - December • O&M to perform MWO 9-2330-392-20-1,2 • Landing gear reinforcement (38) trailers & brake surge protection (47) trailers • Extra CIP servers and spares ordered • Very close relationship between O&M and Production • All design and production engineers support the fielded systems – Steve Erdman • FSRs supported all hardware and software upgrades

  16. Pre-Award Fee Evaluation Contract Performance Evaluation Factor Category “C” Logistics Depot Support • C – 2 Technical Documentation • Drawings and tech manuals updated to reflect the changing configurations

  17. Pre-Award Fee Evaluation Contract Performance Evaluation Factor Category “C” Logistics Depot Support • C – 3 Supply Support • Responsive to site requirements for replacement items to repair equipment or restock spares • Successful startup of the SWA depot • Successful hookup with existing supply chains to ensure replenishment and support of the deployed systems

  18. Support From the Field FSRs Sustain, Maintain, & Improve • The Glue Between ASPO, The Contractor, and the User • What does the User Need?; Every Site is Unique • Bridge the Gap of Soldier Rotations • Support the Site, Not Just the System • Manage Total Quality Support • Foster Inter-Operability Between Systems • The Key to Flexible Integration • Support Fabrication and Upgrades • Working Outside the Box