1 / 12

Noticed

Noticed. Date : 2012/12/25 1:20 a.m.~16:20 p.m. Place : EE II 101 Time : 10 min. Presentation 5 min. Q & A. Term Project OPamp Design. Name( 姓名 ) TA: Ying-Da Chang ( 張英達 ) Advisor: Prof. Chorng-kwang Wang( 汪重光教授 ) AICD Fall 2012.

zlata
Download Presentation

Noticed

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Noticed • Date : 2012/12/25 1:20 a.m.~16:20 p.m. • Place : EE II 101 • Time : 10 min. Presentation 5 min. Q & A

  2. Term ProjectOPamp Design Name(姓名) TA: Ying-Da Chang (張英達) Advisor: Prof. Chorng-kwang Wang(汪重光教授) AICD Fall 2012 Graduate Institute of Electronics Engineering and Department of Electrical Engineering National Taiwan University

  3. Outline • Motivation(5%) • Prior Art(5%) • Specification(0%) • Design Flow(10%) • Layout(20%) • Simulation Results(20%) • Performance Summary(15%) • Comparison(5%) • Conclusions(0%) • References(0%) • Q&A (20%)

  4. Motivation

  5. Prior Art • Go to http://ieeexplore.ieee.org/ (Need IP of NTU)

  6. Specification

  7. Design Flow • Reference your Hw6

  8. Layout • Reference your Project Hw8

  9. Simulation Results • Reference your Project Hw7 and Hw9 • Compare pre-sim. with post-sim. • DC AC and Tran.

  10. Performance Summary

  11. Comparisons • Compare to the prior art including Gain UGB Technology … ect

  12. References

More Related