In the construction industry, formwork plays a crucial role in shaping concrete structures during the building process. Two popular formwork options used by contractors and builders are aluminium formwork and conventional formwork. Each method has its own set of advantages and considerations. In this PPT, we will explore the key differences between aluminium formwork and conventional formwork, providing you with insights to help you make an informed decision based on your construction needs.
E N D
COMPARISON BETWEEN ALUMINIUM FORMWORK AND TRADITIONAL FORMWORK
ALUMINIUM FORMWORK SYSTEM CONVENTIONAL FORMWORK SYSTEM Speed of construction The minimum cycle time is of 21 days Four days cycle per floor Quality of surface finish Excellent, Plastering not required Bad, Plastering is required
ALUMINIUM FORMWORK SYSTEM CONVENTIONAL FORMWORK SYSTEM Types of construction Cast-Insite cellular construction Simple RCC framed construction Accuracy in construction Accuracy is less than a modern system Accurate construction
ALUMINIUM FORMWORK SYSTEM CONVENTIONAL FORMWORK SYSTEM Resistance to earthquake Good resistance Less than the modern system Wastage of formwork material Very less amount In great amount
ALUMINIUM FORMWORK SYSTEM CONVENTIONAL FORMWORK SYSTEM Re-usage value of formwork 250-300 times Maximum 50-60 times Economy in construction Economical for mass houses Economical on a small houses