1. Sewerage & Water Boardof New Orleans
2. Who Is The S&WB? New Orleans settled by French in 1718
Drinking water from cisterns or untreated river water
No sewerage collection or disposal
Disease and fire a serious, recurring problem
S&WB Created by Louisiana Legislature in 1899
Board is a quasi-City/State agency
Purpose to furnish, construct, operate, and maintain water, drainage, and sewerage systems for New Orleans
3. Sewerage System Two treatment plants
2,450 miles of pipes, mains, connections (four inches to seven feet in diameter)
83 lift stations
Three large pumping stations
Treat 142 million gallons per day
4. Drainage System 24 Major pumping stations; 15 underpass stations
Capable of pumping 30 billion gallons per day or 50,268 cfs (creates a flow equivalent to that of Ohio River)
Drains 58,785 acres in Orleans Parish; 2,250 in Jefferson Parish
93 miles of covered canals; 82 miles of open canals
Operates 25Hz Power Plant
5. Sewerage & Water Board of New Orleans Water System Two water treatment plants
270 million gallons per day production capacity
Distributed to 120,000 service connections and 24,000 fire hydrants
1,790 miles of mains ranging in size from 4 to 54 inches in diameter
On-site water quality lab
6. Carrollton Water Plant Serves East Bank Orleans Parish
230 MGD capacity
Source – Mississippi River
Conventional Treatment
55 ton rail cars
6,000 lbs/day Cl2
7. Algiers Water Plant Serves West Bank Orleans Parish
40 MGD capacity
Source – Mississippi River
Conventional Treatment
Ton cylinders
600 lbs/day Cl2
8. Driving Forces to Change Vulnerability Assessment (1994)
Risk Management Program (1999)
Aging Carrollton System
Supply Considerations
9. Carrollton System Evaluation Aging Infrastructure
Safety and Security Improvements Needed
Supply Availability Concerns
55 ton rail car fleet
Willing manufacturers
10. Carrollton System Evaluation Evaluated Improvements to Existing Rail Car Chlorine System
11. Considered switch to Hypochlorite
Inherently safer system
Capital cost less
Chemical cost higher
DPB considerations
Carrollton System Evaluation
12. Risk Mitigation Wins! Ops & Management evaluated alternatives
Operating experiences
Costs – Capital and Operating
Past litigation
Security trends
Chose risk reduction with hypo
13. Katrina’s Effect Rails washed out – no rail cars
Installed temp hypo system
Used thru Katrina recovery period
Complimented rail car system
Operating experience with hypo
14. Sources of Hypo Considered Purchased
Commercial grade hypo delivered
On-Site Generation
Electrochemical generation from salt
15. Purchased Hypo Several manufacturers in area
Delivered by tank truck
Less than 1 hr. away
Simplicity in operation
Capital Cost - least expensive
Chemical Cost - most expensive
16. On-Site Generation Salt readily available in area
Several manufacturers of systems
Power needs/costs to consider
Complexity of operations
Capital cost higher
Operating costs less than purchased
17. Furthur Eval of On-Site Generation Low vs. high strength product
Complexity of operations
Chemical purity concerns
System Trial
Site Visit
Operating experiences of others
18. Carrollton Direction Commercial Hypo Delivered
Bulk storage and pumping facility
Can be incorporated into future on-site generation system if desired
Design completed
19. Algiers Direction On-Site Generation / High Strength Hypo
Commercial hypo delivery redundancy
Evaluate technology for Carrollton
Scalable up to Carrollton’s needs
20. Algiers Installation On-Site generation of chlorine
1500 lb/day available Cl2 capacity
Membrane cell technology
Chlorine can be converted
to commercial strength hypo
Can accept bulk delivery
of hypo if needed
21. Algiers Installation Costs
Equipment Purchase - $700K
Installation - $1.2M
Installation of new equipment
Relocation and demolition of existing facilities
Employee training and start up assistance
Installation Time –
Chemical Cost
$0.35/lb avail Cl2 as hypo generated
$0.53/lb avail Cl2 hypo purchased
22. Operating Experiences Startup in April 2009
Learning Curve
Intimidating to some operators
Sensitive to operational hiccups
Few “bugs” to work out yet
Overall positive experience so far