1 / 31

Work Zone & Incident Management in Wisconsin

Work Zone & Incident Management in Wisconsin. Process & Applications Michael S. Hardy Wisconsin D.O.T. 633 W. Wisconsin Ave, Suite 1200 Milwaukee, WI 53203 michael.hardy@dot.state.wi.us. 1) Process. Marquette Interchange Reconstruction. Outline.

Anita
Download Presentation

Work Zone & Incident Management in Wisconsin

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Zone & Incident Management in Wisconsin Process & Applications Michael S. Hardy Wisconsin D.O.T. 633 W. Wisconsin Ave, Suite 1200 Milwaukee, WI 53203 michael.hardy@dot.state.wi.us

  2. 1) Process Marquette Interchange Reconstruction

  3. Outline • Project overview • Incident Management Planning for construction • Traffic Mitigation • Approach • Solutions • Future steps

  4. Reconstruction Overview • Downtown Milwaukee, Wis. • 1968: Interchange is dedicatedand is opened to traffic Dec. 23 • Today: • 5-level interchange • 300,000 vehicles per day • 120,000 downtown jobs • 7 million downtown visitors • Problems: • Structures are at end of useful life • High crash rates • Increasing traffic congestion

  5. Reconstruction Overview • Rebuild and realign entire interchange • Minimize construction time • 4 years (2004 – 2007) • Minimize impacts • Keep downtown “open for business” • Through movements will remain open • Some closures of freeway-freeway ramps • Closure of service ramps • Reduced number of lanes, speed, lane widths, shoulders

  6. The TIME program:A HEAD START

  7. Managing a Planned Incident • Traffic Mitigation Task Force - Proposals • Freeway operations and incident management • Public information • Transit and demand management(commuter options) • Local road operations

  8. Scenario-Based Operations Planning • Table-top exercises • Every day operation during construction • Major incident within interchange • Major incident on bypass • Major special events

  9. Table-Top Exercises • Multi-agency, multi-disciplined • Define conditions and assumptions • Verify roles and responsibilities • Identify problems and needs • Develop solutions

  10. Results/Proposals • Maintain freeway operations • Maintain “Monitor” FreewayTraffic Management System • Additional CCTV and detectioncoverage for interchange surveillance • Entrance-ramp meteringand improvements • TOC Night staff • Web page CCTV image-sharingwith stakeholder • FTMS system preservation contract –construction in 2003 prior to reconstruction

  11. Results/Proposals • Maintain freeway operations (alternate routes) • Signal re-timing, upgrades • Emergency vehicle preemption • Intersection improvements • Parking restrictions

  12. Results/Proposals • Emergency services/public safety • Crash investigation sites • Hydrant stand-pipes • Enforcement pads • Smaller fire-response vehicles • Additional freeway patrols • Revise SOP • Pre-positioned emergencytraffic control equipment • Full-time construction – public agency liaison

  13. Results/Proposals • Commuter options • Additional localand Freeway Flyerbus routes • Park-n-Rides • Free transfer programs • Transit-Fairs

  14. Results/Proposals • Travelerand public information • Business Survival Guide • Kiosks at major events • Web page for parking options • Brochures • Web page • Construction updates • Map your own travel route with real-time conditions • Alternate route “familiarization” tours

  15. Next Steps • Further refinement/prioritization of solutions • Funding (Steering Committee) • 20 mil / 210 mil • Implement some solutions this year • LET Contracts / Service Procurement • Interagency Agreements • Process review • Resources • Contract administration • Work Zone accountability

  16. 2) Application Travel Time Prediction SystemTraffic-Responsive Variable Message SignSystem Alan J. Horowitz, UW Milwaukee Thomas Notbohm, WiDOT

  17. Characteristics of Work Zone • I-94, south of Milwaukee County • 12 miles long • Normally 3 lanes, reduced to 2 lane + no shoulder • Normally 65 mph, reduced to 55 mph • Peak volume, 4000 vph • Queues sometimes exceed 2 miles • Frontage road for full length

  18. Characteristics of Signage System • “Travel Time Prediction System” • Commercial product (4 mo. Lease) • Detectors (volume + occupancy) • Desktop computer (field office) • Portable CMS • Radio communication between devices ( • No other reliable source of information about delays though the work zone • No information about alternative routes

  19. Characteristics of System Function • Display Travel Time to end of work zone, and distance to end of work zone • Travel time updates every 30 seconds • 4 minute intervals to control update frequency • 85% occurrence of predicted travel time within 30% of actual travel time • No other reliable source of information about delays though the work zone • No information about alternative routes

  20. TIPS Signand Sample Message

  21. SignDeployment • Location of TIPS • Detectors (5) • Signs (4, 2 Interstate) • Work zone

  22. Experimental Design • Before/After (70 days) • Entirely in the summer months, June 11 to August 19 • Virtually everything held constant, except: • Travel lanes open • Operation of the signs • Work zone in existence well ahead of data collection • Same counting devices (microwave, tube)

  23. Cutlines • B,C,D are TIPS • F-G are tubes • All data aggregated to 15 minute intervals

  24. Weekday 15-Minute Counts at Cutlines 3 hours each of four Thursdays and Fridays, before and after (96 samples before, 96 samples after)

  25. Sunday 15-Minute Counts at Cutlines 3 3/4 hours each of four Sundays before and 3 Sundays after (60 samples before, 45 samples after)

  26. Conclusion • A 10% alternative route selection rate during peak periods is achievable when accurate, up-to-the-minute, information about delay through a work zone is provided and there is an attractive set of alternative routes • No significant change in crash numbers compared to opposite direction, but observed reduction in injury frequency • More detection to increase accuracy

  27. 3) ApplicationWork Zone Speed Advisory SystemTom Notbohm, WisDOTScott Nelson, WisDOT

  28. WiDOT Project Layout – 4 Sensors, 3 VMS RTMS1 Mobile Control Unit RTMS RTMS2 VMS VMS1 RTMS3 RTMS4 VMS2 VMS3

  29. Characteristics • Display Speed of traffic and distance downstream in work zone • Speed reports will be • > 50mph, blank • 20-30, 30-40, 40-50, for respective range • ,20mph, STOPPED TRAFFIC AHEAD • Application starts May 5, 2003 • 2 other fixed incident CMS, and 6 portable project CMS

  30. Functional Block Diagram – 4 Sensors; 3 VMS MCU & RTMS1 Laptop With IntelliZone Software Internet VMS1 & RTMS2 Wireless Comm. to Internet = RTMS3 VMS 2 & RTMS4 VMS3

  31. Field Devices – US 41 RTMS1 RTMS2 RTMS3 RTMS4 MCU VMS1 Traffic Sensor Trailer VMS2 VMS3

More Related