Identifying and Evaluating Levee Improvement Alternatives – The City of West Sacramento. Michael J. Vecchio , P.E. Watershed Planning and Design Sacramento, CA PRESENTED AT: Association of State Flood Plain Manager’s Conference 20 May 2010. Purpose and Scope.
E N D
Identifying and Evaluating Levee Improvement Alternatives – The City of West Sacramento Michael J. Vecchio, P.E.Watershed Planning and Design Sacramento, CA PRESENTED AT: Association of State Flood Plain Manager’s Conference 20 May 2010
Purpose and Scope • Analyze problems and opportunities associated with existing levee system and its upgrade • Define levee system upgrade alternatives • Evaluate alternatives with respect to technical adequacy, environmental and community impact, and construction costs • Recommend upgrade alternatives for all currently deficient levee reaches
Levee Deficiencies Evaluated • Geometry • Freeboard • Stability (static and rapid drawdown) • Seepage (through- and underseepage) • Erosion • Seismic Vulnerability • Vegetation*
Data Sources • West Sacramento Levee System Problem Identification and Alternatives Analysis Volume 1: Geotechnical Problem Identification (Kleinfelder, 9/21/2007) • Phase 1 Geotechnical Evaluation Report, West Sacramento (URS, 11/2007) • West Sacramento Levee System: Problem Identification Report; Erosion Assessment and Treatment Alternatives (NHC, February, 2008) • West Sacramento Levee Evaluation Project: Draft Problem Identification Report (HDR, 4/28/2008)
Planning Objectives • Improve level of flood protection • City Ordinance 07-11: 200-yr Flood Protection • Certification under 44 CFR 65.10 and Accredited by FEMA • Flood protection objectives are primary • Recreation and restoration objectives are secondary
Alternative Plans • Single Deficiency Mitigation Measures • Levee Deficiency Groups • Combinations of Mitigation Measures • Mitigation Alternatives Selection Criteria • Mitigation Alternative Evaluation
Evaluating Alternatives • System Continuity • Community Impact • Environmental Impact • Operation and Maintenance Costs • Construction Cost
Mitigation Alternative Evaluation • Criteria: system continuity, community impact, environmental impact, operation and maintenance cost, construction cost • Qualitative Evaluation – ‘negative’, ‘average’, ‘positive’ • Scoring • Negative = -1 • Average = 0 • Positive = 1
SACRAMENTO RIVER WEST NORTH (5.8 MILES)
DEEP WATER SHIP CHANNEL WEST (18.9 MILES)
DEEP WATER SHIP CHANNEL EAST (2.7 MILES)
SACRAMENTO RIVER WEST SOUTH ( 6.3 MILES)
WEST SACRAMENTO LEVEE SYSTEM IMPROVEMENTCONSTRUCTION COST OPINION