1 / 9

Company Profile Background Services Resources Facilities

Company Profile Background Services Resources Facilities. Tierney Strachan Ltd has a long history of supply to Aker Solutions of MCS; ETU and many other assembles exceeding 10 years. Background. Established 2000 - Closed company with two directors Currently 16 Employees

Audrey
Download Presentation

Company Profile Background Services Resources Facilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Company ProfileBackgroundServicesResources Facilities Tierney Strachan Ltd has a long history of supply to Aker Solutions of MCS; ETU and many other assembles exceeding 10 years.

  2. Background • Established 2000 - Closed company with two directors • Currently 16 Employees • Aberdeen Based and local to many of our client operations • Familiar with offshore operating methods and procedures to provide installation and commissioning services • Strong financial status • Strong retained relationships with existing client base • ISO 9001:2008 Approved for all our processes • Fully registered within FPAL

  3. Services • Panel and sub-assembly design, build equivalent to IPC-A-620 standards and test with an extensive history of recent builds completed with rapid turnaround • Significant experience in Industrial Datacomms & Telemetry – many projects completed using serial and Ethernet systems • Process control – understanding the requirements and methodology for installation / commissioning • Majority of modification projects undertaken as live changeover • Subsea Control System interfaces to existing platform topside systems and process equipment • Full Integrated Control and Safety Systems (ICSS) lifecycle support

  4. We have supplied much of the hardware for topside subsea control systems used by AS globally. Our recent project list includes: • Burullus (2 x WOCS MCS) • Otway MCS • Atla MCS & WOCS • Lula (3 x MCS rack pairs) • Centrica Ensign MCS • Dana Western Isle Development MCS • BP Q204 MCS • Siakap MCS & Reference System • Marathon West Brae MCS

  5. Additional Hardware supplied for AS projects: • Total Ellon • Tupi • Vigdis • Visund • Troll • Roncador • Liu Hua • Kikeh • Alvheim • Aasta Hansteen and many others…..

  6. Resources • Engineering personnel all with significant experience (all with significant PLC/SCADA/DCS offshore experience) • AutoCAD Services • Panel Wiremen / Technicians • Parts sourcing and procurement services • Administration / support

  7. Facilities • Offices and workshops located in East Tullos, Aberdeen consisting of: • ~2,200sqft split workshop offices, light assembly and rack assembly/ staging area easily capable of supporting approx 10-12 MCS cabinet builds simultaneously. • ~3,500sqft warehouse/ staging space. • Main Offices of ~4,000sqft. • Workshop stock of some £400K of materials typically utilised in AS MCS builds allowing rapid turnaround of panel build projects.

  8. Considerations • Capability for short lead time of builds due to stock holding • Considerable history of MCS and Sub-Assembly build – very familiar with products; methods; systems of work etc. (now over a decade). • High Quality of product regularly praised by AS and AS Clients • Locality – within 30mins travel from AS for meetings etc; • Facilities sufficient to undertake major build projects; • Thorough understanding of technical; document; quality and HS&E requirements for AS projects.

More Related