Part 4: M&V Plan Review

Part 4: M&V Plan Review Key Documents Risk / Responsibility Matrix M&V Plan Template Detailed Guidelines for FEMP M&V Option A www.eere.energy.gov/femp/financing/ superespcs_mvresources.cfm Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 2: Project Development Contractor Responsibilities

Audrey
Download Presentation

Part 4: M&V Plan Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Part 4: M&V Plan Review Key Documents • Risk / Responsibility Matrix • M&V Plan Template • Detailed Guidelines for FEMP M&V Option Awww.eere.energy.gov/femp/financing/superespcs_mvresources.cfm

  2. Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 2: Project Development Contractor Responsibilities • Develop Risk & Responsibility Matrix • Develop M&V Overview • Explain and justify approach. Owner Responsibilities • Review Risk & Responsibility Matrix and M&V Overview and provide feedback

  3. Phase 5 Phase 1 Phase 2 Phase 3 Phase 4 Phase 3: Negotiation and Award Contractor Responsibilities • Perform Detailed Energy Survey (DES) and document baseline information • Modify M&V plan to satisfy owner needs and desires owner Responsibilities • Review and approve M&V Plan • Witness and observe DES

  4. Risk & Responsibility Allocation • How to allocate risks and responsibilities? Typically: • Performance: Contractor • Usage: owner • Financial: Shared • M&V approach should focus on: • Verifying performance • Characterizing usage • Minimizing uncertainty cost-effectively

  5. Need to balance M&V rigor with project risk Measure things that need measuring Consider required precision Estimate (stipulate) where risks are acceptable Law of Diminishing Returns applies Typically, initial M&V costs will be 3 – 15% of the capital cost (see DO-2); annual M&V costs will be 3 – 15% of the savings (see DO-3) Cost Effectiveness

  6. M&V Costs M&V Cost $ Incremental Value of information M&V Rigor

  7. M&V Costs and Project Savings Source: Initial Applications of the FEMP Measurement & Verification Guidelines in Super ESPC Delivery Orders: Observations & Recommendations. Schiller Associates, 1999

  8. Reviewing Measurement & Verification Plans for Federal ESPC Projects CAUTION: TECHNICAL EXPERTISE IS REQUIRED! • M&V Plan review requires qualitative assessment of engineering strategies Intimate understanding of project helpful: • Owner goals • Site specific issues • Agreed-upon risk allocation • Objectives and constraints for each ECM

  9. Overview of 6 review steps STEP 1: Gather project documentation STEP 2: Rank ECMs based on savings STEP 3: Initiate review STEP 4: Evaluate M&V approaches STEP 5: Develop written report STEP 6: Ensure key issues are resolved

  10. Overview of 8 review steps (cont) STEP 5: Evaluate M&V approach STEP 6: Develop report using review template STEP 7: Provide written review to Owner & DOE STEP 8: Ensure that action is taken on key issues

  11. Step 1: Gather project documentation • Final proposal, including technical appendices • Note available documentation

  12. Step 2: Rank ECMs based on savings • Identify all sources of savings for each ECM Rank ECMs on: • % total cost savings (energy & water, O&M) • % total commodity cost savings (energy & water) • Note % savings for ECMs • Focus on largest $ saving measures first • O&M generally verified separately from energy & water savings

  13. Step 3: Initiate Review • Review Final Proposal • Sections of proposal other than the M&V plan may be required • Identify obvious deficiencies • Use graded approach in review efforts

  14. Step 4: Evaluate M&V approaches Are M&V approaches appropriate? • Note source of savings for each ECM • Is M&V adequate for all sources? • Review Risk & Responsibility Matrix • Does M&V plan match proposed risk allocation?

  15. Step 4: Evaluate M&V approaches (cont.) Evaluate quality of baseline developed • Were key variables measured? • Are assumptions reasonable and well documented? • Were performance characteristics recorded? • Are the energy and savings calculations correct? Reasonable? • Were utility or weather based models validated?

  16. Step 4: Evaluate M&V approaches(cont.) Evaluate performance period activities: • What is the likelihood of success for this measure? • Higher risk = more rigorous M&V • Will key variables affecting ECM be measured? How often? • Will meaningful performance period data be used to calculate savings? • Sufficient to support guarantee? • If only post-install measurements are used, is this data likely to change? • Is the savings risk level appropriate? Aligned w/ R&R matrix? • Have all objectives and constraints for the project been considered? For each ECM? • Have O&M reporting responsibilities been adequately defined?

  17. Step 4: Evaluate M&V approaches (cont.) Evaluate overall project assumptions • Are contracted energy rates based on actual rates? • Are marginal (not blended) rates used? • Are escalation factors based on latest NIST data or other credible source? Evaluate proposed M&V Costs • Do M&V costs align with planned activities?

  18. Step 5: Develop written report • Transfer key notes & findings to written report • Summarize recommendations for each ECM in Summary of Findings

  19. Step 6: Ensure issues are resolved • Send review to Owner staff • Note dates and names of recipients • Confirm actions are implemented to address recommendations • If not implemented, provide written explanation Documentation is critical in contracts that will most likely outlive staff

  20. M&V Plan Reviews - Lessons Learned • Use a Savings/M&V Options Table • Prioritize the review • Improve proposed M&V approaches • Document recommendations

  21. 1) Use a Savings/M&V Options Table • Gives a one-page picture that IDs all savings streams and associated M&V strategies • Helps spot missing M&V options • Helps you prioritize your M&V Plan review • Is easy to create, • Documents an important step in starting a review • Is a valuable reference any time M&V of the project is revisited • Helps focus future performance period reviews when details have been forgotten and the project begins providing measured results

  22. 2) Prioritize Your Review • Use Savings/M&V Options Table to focus your review • ID where most of the project savings lie • Assess error potential with each savings stream to ID highest priority streams • Prioritize ECMs/savings streams in accordance with savings potential and error risk

  23. Savings/M&V Options Table (in order of decreasing ECM savings)

  24. 3) Improve proposed M&V approaches when needed • Change to more rigorous M&V options • Add measurements to minimize uncertainties (particularly for large savings streams where errors could be most significant) • Reduce M&V costs (switch M&V option, optimize sampling, etc.) • Optimize sampling: • minimizing number of measurements by focusing on the largest contributors • rotating sampling during the performance period • assuring random sampling where appropriate

  25. 4) Document recommendations from M&V Plan reviews • Use to verify that ESCO/customer have addressed recommendations

  26. Summary • GET IT RIGHT! M&V Plan reviews are critical: • Great protocols/guidance do not equal great M&V Plans • M&V Plans define project success • Weak M&V Plans = weak projects • Combine guidance with good engineering judgment to produce great M&V Plans

  27. Summary (continued) • Think of reviews as a process such that your experience will lead to quality improvements • Use/develop review tools, they will: • Focus your efforts on a path through the myriad details involved • Help you minimize oversights • Provide useful reference material for reviews and a basis for QA improvements

  28. More M&V resources: • M&V Guidelines, M&V Planning Tool, etc: • http://www.eere.energy.gov/femp/financing/superespcs_mvresources.cfm • Draft: Reviewing Measurement & Verification Plans for Federal ESPC Projects (and other M&V documents): • http://ateam.lbl.gov/mv/

  29. Review & Discussion • Performance must be verified to guarantee savings • owner often assumes usage risk • Uncertainty is inherent in M&V • M&V costs need to be balanced against project risks

  30. Review Questions • How do we measure savings? • When might an owner accept performance risk? Click hereto go to M&V Part 5