Potain HDT80 Self-Erecting Tower Crane Site Preparation

Compass Equipment offers all Potain self-erecting tower crane series throughout the southwest.

Compass1
Download Presentation

Potain HDT80 Self-Erecting Tower Crane Site Preparation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Potain HDT80 Self-Erecting Tower Crane Site Preparation 1. Determine if FAA notice to airmen is required and if flag or light is required per FAA guidlines. 2. Determine underground utilities or other obstacles impacting grounding of crane and/or generator. 3. Ensure adequate ingress/egress for crane, ballasting and erection envelope of crane (see specification sheet for erection envelop). 4. Provide space for generator or power pedestal if contractor is providing power. 5. Ensure adequate egress/ingress to fuel generator if applicable 6. Prepare Flat, level, compacted and well- drained crane surface that can support the maximum corner force of the crane. (See attached crane reaction data) Supplier will provide crane pads. 7. Ensure that erected crane has adequate clearance and separation from any existing or anticipated power lines or obstructions 8. Construct adequate barrier to keep unauthorized persons from entering the crane area. We Invest in Your Success!

  2. ERECTION DISMANTLING CRANE GROUND CONNECTION CONSTITUTION OF THE BEARING SURFACE This support is provided for a ground with medium bearing capacity ( R = 35,71 lbs / sq inch). When the capacity is different, modify the bearing surface accordingly, observing the height of the support ( 9? ). R = 10?9? R = 12?1? F 1?11? In service 89 303 lbs Out of service 76 955 lbs F = F = Out of service 76 955 lbs Maximum load with wind without Maximum load with wind without dynamic coefficient ????????? 15? ? 15? = = R = 12?1? R = 8? R = 8?2? 25 EDITION: 04 07 02 25A 0000 043 0 3

  3. SUPPLY POWER OPERATION MAINTENANCE 11M SUPPLY POWER 1. CHARACTERISTICS OF CURRENT SUPPLY OF CRANES 1. 1. POWERS AND INTENSITIES FOR EACH WINCH VERSION Model 400V/50Hz Type of winch Nominal power in kVA Starting power in kVA Nominal intensity at A Starting cur- rent at A 20 PC 20 LVF 31 31 82 37 45 42 118 45 HDT70A HDT80 Model 400V/60Hz Type of winch Nominal power in kVA Starting power in kVA in kVA Nominal intensity at A Starting cur- rent at A 20 PC 20 LVF 31 31 82 37 37 82 82 45 42 118 45 HDT70A HDT80 This starting current intensity comprises: the starting current intensity of the motion using the most voltage (in general the hoist motion) the starting current intensity of the motion using the most voltage (in general the hoist motion) the starting current intensity of the motion using the most voltage (in general the hoist motion) the nominal intensity of the two other motions (in general slewing and trolleying) the nominal intensity of the two other motions (in general slewing and trolleying) the nominal intensity of the two other motions (in general slewing and trolleying) In case of cranes equipped with frequency converter the differential circuit breaker- must be compatible with this equipment according to the rules in force at the place of work. In case of cranes equipped with frequency converter the differential circuit breaker- compatible with this equipment according to the rules in force at the place 2 EDITION : 08.01.09 11M 0300 006 0 3 1

More Related