Ready to advance your career in the construction and industry sectors? Prepare yourself for success with the AEE-CEM Construction and Industry 2023 exam. This rigorous certification exam validates your expertise in energy management and sustainability within the construction and industry domains. By mastering key concepts such as energy auditing, renewable energy integration, and efficiency optimization, you'll become a sought-after professional in the field.<br>https://www.certsgrade.com/pdf/AEE-CEM/
E N D
C E R T S GR A DE High Grade and Valuable Preparation Stuff High Grade and Valuable Preparation Stuff Construction and Industry AEE CEM Certified Energy Manager Questions And Answers PDF Format: For More Information – Visit link below: https://www.certsgrade.com/ Version = Version = Product Visit us athttps://www.certsgrade.com/pdf/aee-cem/
Latest Version: 6.0 Question: 1 ISO 50001 is A. an international measurement and verification standard. B. a green building rating system. C. a green building standard. D. an international energy management standard. Answer: D Question: 2 Which standard specifies minimum requirements for ventilation and indoor air quality? A. ASHRAE 55 B. ASHRAE 62.1 C. ASHRAE 90.2 D. ASHRAE 189.1 Answer: B Question: 3 What is the maximum interest rate an organization should accept if it is to finance an energy saving product that saves $20,000 per year over its useful life of 10 years if the initial cost is $112,000? A.2% B. 12% C.17% D.20% Answer: B Question: 4 Visit us athttps://www.certsgrade.com/pdf/aee-cem/
A chiller retrofit project will cost $100,000 to implement and will have a useful life of fifteen years. If the company pays $0.09/kWh for electricity and uses a discount rate of 10%, how many kilowatt-hours must the project save each year to pay for itself? A.350,000 B. 286,000 C. 146,000 D.35,000 Answer: D Question: 5 A company plans to invest the savings generated by a boiler retrofit project to pay for a lighting upgrade five years from now. The lighting project is expected to cost $80,000 and the company has fixed price contracts for the next five years of $0.085/kWh and $7/Mcf. How many Btu's of energy must the new boiler save each year if the company can invest the savings at 10%? (Assume 1 Mcf = 1,037,000 Btu). A. 526 MMBtu B. 1217 MMBtu C. 1941 MMBtu D. 3126 MMBtu Answer: C Question: 6 A building owner replaced a #2 fuel oil-fired boiler which had an efficiency of 80% with a natural gas condensing boiler which has an efficiency of 92%. The price of oil is $2.30 per gallon and the price of gas is $0.85 per therm. If the facility uses 4,100 MMBtu each year and the new boiler will cost $140,000, what is the simple payback period? A. 2.8 years B. 3.0 years C. 3.7 years D. 4.9 years Answer: A Question: 7 Visit us athttps://www.certsgrade.com/pdf/aee-cem/
A building owner is considering two potential lighting retrofit projects. Project 1 will cost $25,000 and produce savings of $6,000 per year. Project 2 will cost $40,000 and produce savings of $9,000 per year. If both projects have an expected life of 8 years, which project should be chosen if a return on investment of 15% is required? A. Project 1 B. Project 2 C. C. Neither Project 1 or Project 2 D. Both projects have the same return Answer: B Question: 8 What is the annual after-tax cash flow of a new boiler economizer if it costs $50,000 to install, will save $8,000 per year, and has a useful life of 10 years after which it is worth nothing? Assume a tax rate of 30% and use straight-line depreciation. A. $2,600 B. $5,600 C. $6,500 D. $7,100 Answer: A Question: 9 ASHRAE Standard 90.1 specifies energy standards for which type of building? A. Existing buildings B. High-performance green buildings C. Low-rise residential buildings D. Buildings except low-rise residential buildings Answer: D Question: 10 Which of the following regulations was not part of the Energy Policy Act of 2005? A. A requirement for electric metering in all federal buildings by 2012. Visit us athttps://www.certsgrade.com/pdf/aee-cem/
B. The requirement that total energy use in federal buildings be reduced by 30% by 2015 compared to the 2005 level C. New federal buildings must incorporate life-cycle costing D. Renewable energy consumption in federal buildings must be greater than 7.5% from 2013 onwards. Answer: D Question: 11 The purpose of ASHRAE Standard 189.1 is to A. specify minimum requirements for HVAC system energy performance. B. establish a green building assessment protocol. C. specify minimum requirements for the design of green buildings. D. establish methods of testing the seasonal efficiency of air conditioners and heat pumps. Answer: C Question: 12 Which Act required utilities to purchase power generated by qualifying cogeneration facilities? A. Public Utilities Regulatory Policy Act (PURPA) B. Public Utility Holding Company Act (PUHCA) C. The Energy Independence and Security Act of 2007 D. The Energy Policy Act of 2005 Answer: A Visit us athttps://www.certsgrade.com/pdf/aee-cem/
For More Information – Visit link below: http://www.certsgrade.com/ PRODUCT FEATURES 100% Money Back Guarantee 90 Days Free updates Special Discounts on Bulk Orders Guaranteed Success 50,000 Satisfied Customers 100% Secure Shopping Privacy Policy Refund Policy Discount Coupon Code: CERTSGRADE10 Visit us athttps://www.certsgrade.com/pdf/aee-cem/ Powered by TCPDF (www.tcpdf.org)