1 / 9

BSOP 330 UOP Course Tutorial / Tutorial Rank

For more course tutorials visit www.tutorialrank.com Tutorial Purchased: 3 Times, Rating: No rating Problems: 4.1, 4.5, 4.9 and 4.11, pages 140-141. Problems: 4.1: The following gives the number of pints of type A blood used at Woodlawn Hospital in the past 6 weeks: a) Forecast the demand for the week of October 12 using a 3-week moving average

Download Presentation

BSOP 330 UOP Course Tutorial / Tutorial Rank

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BSOP 330 DEVRY Course Tutorial For more course tutorials visit www.tutorialrank.com

  2. BSOP 330 DEVRY Course Tutorial BSOP 330 Master Planning All Weeks Discussion Questions (DEVRY) BSOP 330 Week 1 Lab Assignment Problems 4.1, 4.5, 4.9 and 4.11, pages 140-141 (DEVRY) Tutorial Purchased: 2 Times, Rating: B+ BSOP-330 Master Planning All Weeks Discussion Questions Devry University Tutorial Purchased: 3 Times, Rating: No rating Problems: 4.1, 4.5, 4.9 and 4.11, pages 140-141. Problems: 4.1: The following gives the number of pints of type A blood used at Woodlawn Hospital in the past 6 weeks: a) Forecast the demand for the week of October 12 using a 3-week moving average.

  3. BSOP 330 DEVRY Course Tutorial BSOP 330 Week 2 Lab Assignments Chapter Four Problems 4.23, 4.27, 4.33, and 4.35 (DEVRY) BSOP 330 Week 2 Southwestern Case study (DEVRY) Tutorial Purchased: 2 Times, Rating: A Chapter Four Problems 4.23, 4.27, 4.33, and 4.35. 4.23 a) Compute MAD and MAPE for management’s technique b) Do management’s results outperform (i.e., have smaller MAD and MAPE than) a naive forecast? c) Which forecast do you recommend, based on lower forecast error? 4.33 Tutorial Purchased: 2 Times, Rating: A Discussion Questions 1. Develop a forecasting model, justifying its selection over other techniques, and project attendance through 2007. 2. What revenues are to be expected in 2006 and 2007? 3. Discuss the school’s options.

  4. BSOP 330 DEVRY Course Tutorial BSOP 330 Week 3 Lab Assignments Chapter 13 problems 13.3, 13.5, 13.9, 13.21 (DEVRY) BSOP 330 Week 4 Lab Assignments Chapter 12, problems 12.1, 12.5, 12.9, 12.15 (DEVRY) Tutorial Purchased: 3 Times, Rating: A+ Chapter 12, problems 12.1 L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system? Tutorial Purchased: 4 Times, Rating: A+ Chapter 12, problems 12.1 L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system?

  5. BSOP 330 DEVRY Course Tutorial BSOP 330 Week 4 Quiz (DEVRY) BSOP 330 Week 4 Southwestern Case study Printing companies Programs and Inserts (DEVRY) Tutorial Purchased: 3 Times, Rating: A BSOP-330 Week 4 Quiz Tutorial Purchased: 3 Times, Rating: No rating Southwestern University Case Study 1. For the programs, what are the EOQ's for both printing companies? How many orders of each size will be needed? 2. For the inserts, what are the EOQ's for both printing companies? How many orders of each size will be needed?

  6. BSOP 330 DEVRY Course Tutorial BSOP 330 Week 5 Homework Problems Mater Production Schedule Problem 1, 2 and 3 (DEVRY) BSOP 330 Week 5 Quiz (DEVRY) Tutorial Purchased: 2 Times, Rating: B+ BSOP330 Master Planning, Week 5, Problem 1 MASTER PRODUCTION SCHEDULE MAKE-TO-STOCK Beginning PAB prior to week number one is 500. Tutorial Purchased: 3 Times, Rating: A+ 1. Question : (TCO 9, 10, & 12) The MPS Student Answer: must sum up to the total in the production plan. can have any quantity necessary to meet customer demand. is only used in make-to-stock manufacturing.

  7. BSOP 330 DEVRY Course Tutorial BSOP 330 Week 6 Lab Assignments Chapter 14, problems 14.1, 14.3, 14.9, 14.13 (DEVRY) BSOP 330 Week 7 Case Study Final (DEVRY) Tutorial Purchased: 4 Times, Rating: B+ Chapter 14, problems 14.1 You have developed the following simple product structure of items needed for your gift bag for a rush party for prospective pledges in your organization. You forecast 200 attendees. Assume that there is no inventory on hand of any of the items. Explode the bill of material. Tutorial Purchased: 4 Times, Rating: A Question 1. Which variations in demand for police services should be considered in an aggregate plan for resources? Which variations can be accomplished with short-term scheduling adjustments? Question 2. Evaluate the current staffing plan. What does it cost? Are 26 officers sufficient to handle the normal workload?

  8. BSOP 330 DEVRY Course Tutorial BSOP 330 Week 7 Lab Assignments Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 (pages 640) (DEVRY) BSOP 330 Week 7 Quiz (DEVRY) Tutorial Purchased: 2 Times, Rating: A+ Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 (pages 640-641) 16.1 Leblanc Electronics, Inc., in Nashville, produces short runs of custom airwave scanners for the defense industry. You have been asked by the owner, Larry Leblanc, to reduce inventory by introducing a kanban system. After several hours of analysis, you develop the following data for scanner connectors used in one work cell. How many kanbans do you need for this connector? Tutorial Purchased: 3 Times, Rating: B+ 1. (TCOs 5 & 12) Manufacturing cycle time is best defined as the (Points : 4) length of the work shift, expressed in minutes per day.time it takes a unit to move from one workstation to the next.time between the start of one unit and the start of the next unit.

  9. BSOP 330 DEVRY Course Tutorial For more course tutorials visit www.tutorialrank.com

More Related