1 / 1

CAPABILITY A Matrix Approval Process for Labor Actuals™ KEY OFFICE 2007 TECHNOLOGIES USED Project Standard/Professiona

Canada ISV, System Integrator www.timecontrol.com. TimeControl , an enterprise timesheet designed to link with Microsoft Project, Project Server and ERP Financial Systems. CAPABILITY A Matrix Approval Process for Labor Actuals™ KEY OFFICE 2007 TECHNOLOGIES USED

Donna
Download Presentation

CAPABILITY A Matrix Approval Process for Labor Actuals™ KEY OFFICE 2007 TECHNOLOGIES USED Project Standard/Professiona

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Canada ISV, System Integrator www.timecontrol.com TimeControl, an enterprise timesheet designed to link with Microsoft Project, Project Server and ERP Financial Systems. • CAPABILITY • A Matrix Approval Process for Labor Actuals™ • KEY OFFICE 2007 TECHNOLOGIES USED • Project Standard/Professional • Project Server • Sharepoint • SQL Server • XML File Transfer • ABOUT HMS Software • Based in Montreal, Canada, HMS Software has been a leading supplier of enterprise project management and enterprise timesheet systems 1984. • HMS is represented in over 25 countries and its client list includes such prestigious names as: Alcan, Ericsson, Georgia Pacific, Kelly Services, Mercury Marine, Motorola, Organon, Parker Hannifin, SAAB, Stolt Offshore, UPS and Volvo/Nova bus. The information contained in this document relates to prerelease software product which may be substantially modified before its first commercial release. Accordingly, the information may not accurately describe or reflect the software product when first commercially released. This document is provided for informational purposes only and Microsoft makes no warranties, express or implied, with respect to this document or the information contained in it.

More Related