An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. https://www.dumpsbase.com/c2010-595.html C2010-595 Dumps Questions 1.When a location's status is changed to Decommissioned, what happens with preventive maintenance (PM) records associated with the location? A. PM's cannot be associated to the location. B. Set PMs to inactive for location from the Select Actions menu. C. Nothing happens because a PM can be active in a decommissioned location. D. Check the appropriate check box in the Change Status dialog box of the Locations application so all PM's are set to Inactive. Answer: D 2.What are three statuses of an Asset template? A. Draft B. Active C. In Use D. Inactive E. Approved F. Not Ready Answer: A,B,D 3.Which two tasks can the Preventive Maintenance (PM) application be used to accomplish? A. Auto-generate work orders per classification. B. Auto-generate work orders at the organization level. C. Select specific days, months, or seasons to generate work orders from a PM. D. Create a PM hierarchy to schedule a group of work orders for an asset or location hierarchy. E. Assign nested job plans to a master PM so that different levels of maintenance work can be scheduled at specified intervals. Answer: C,D 4.What is a valid statement when work order tasks are generated for each route stop? A. Route stops are sometimes bypassed B. Work flows cannot control route stops C. Route stops that become work order tasks will not support job plans D. Locations of all route stops must be associated with an organization Answer: C 5.When is a flow control action executed? A. when a work order is saved through flow control page 1 / 5

  2. https://www.dumpsbase.com/c2010-595.html B. when the work order is started through a workflow C. when the work order is started through a flow control D. when the work order is completed through a workflow Answer: B 6.What is used to export an IBM Maximo Asset Management inventory balance report? A. BIRT Report Viewer B. BRIO Report Viewer C. Maximo Report Viewer D. COGNOS Report Viewer Answer: D 7.When is a labor transaction displayed in the Labor Reporting application? A. When a work order is closed. B. When a work order is approved. C. When the actual labor is entered for a work order. D. When the planned labor is entered for a work order. Answer: C 8.Which two statements are true about voiding a receipt record in IBM Maximo Asset Management V7.5? A. Balances and inventory costs are adjusted. B. Voided receipts can be referenced on credit invoices. C. Related General Ledger account transactions are reversed. D. A new transaction of type RECEIPT is created with negative quantity. E. A receipt can be voided after the corresponding line item has been invoiced. Answer: B,E 9.Which statement about an operating location is true? A. A location can be in a network and a hierarchy. B. A location in a network must have multiple children. C. A location of any type can be associated with a network. D. A location can be in a network or a hierarchy, but not both. Answer: C 10.What are three valid types of Service Level Agreements? A. Target B. Vendor C. Service D. Internal E. Contract F. Customer page 2 / 5

  3. https://www.dumpsbase.com/c2010-595.html Answer: B,C,E 11.Which two statements are true about FIFO cost? A. It is associated with inventory balances. B. It is associated with quantities and receipt dates. C. It is used when the standard cost is greater than the average cost. D. It is used when it is necessary to issue oldest receipted items in stock first. E. It is used when the receipt cost of items that are the newest in stock are considered. Answer: C,D 12.What must be true of an asset for it to be identified on a service request? A. The asset must be flagged as public. B. The asset must have a user or custodian specified. C. The asset must be either in status OPERATING or NOT READY. D. The asset must be in the same site as the default insert site of the logged in user. Answer: C 13.When can an invoice be created from the Labor Reporting application? A. When the labor is approved. B. When the work order is approved. C. When the labor is waiting approval. D. When the work order is completed. Answer: D 14.Which application is used to add items to a storeroom? A. Inventory B. Receiving C. Storerooms D. Item Master Answer: D 15.Which value if updated on a preventive maintenance (PM) record will cause a deletion of an existing forecast? A. Changing the description B. Adding a new seasonal date C. Changing the lead time value D. Changing the work order status Answer: B 16.Job plans can be applied to which three items? A. Routes B. Safety Plans page 3 / 5

  4. https://www.dumpsbase.com/c2010-595.html C. Work Orders D. Asset Records E. Purchase Orders F. Preventive Maintenance Records Answer: A,C,F 17.A soft reservation is a request that is defined by what? A.the priority of the work order B.a request for items for any job C.items not subject to a timeframe D.the need for an item at a specific time Answer: C 18.Which tab in the Query-based Reporting dialog allows fields to be added to the report? A. Style B. Select C. Format D. Submit Answer: B 19.If a user has a requirement to create a list of regularly occurring faults that affect assets or operating locations, their causes and possible fixes, which application should be used to achieve this? A. Safety Plans B. Failure Codes C. Ticket Templates D. Activities and Tasks Answer: D 20.How are items deleted from an active job plan? A. delete the item and then save the record B. make a job plan revision and then delete the item C. change the job plan to WAPPR and then delete the item D. change the job plan to PENDING and then delete the item Answer: B Full Version of C2010-595 dumps questions: 92 Q&As page 4 / 5