1 / 27

Validation

Supplementary Training Modules on Good Manufacturing Practice. Validation. WHO Technical Report Series, No. 937, 2006. Annex 4. Validation. Part 1. General overview on qualification and validation Part 2. Qualification of HVAC and water systems Part 3. Cleaning validation

Faraday
Download Presentation

Validation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supplementary Training Modules on Good Manufacturing Practice Validation WHO Technical Report Series, No. 937, 2006. Annex 4.

  2. Validation • Part 1. General overview on qualification and validation • Part 2. Qualification of HVAC and water systems • Part 3. Cleaning validation • Part 4. Analytical method validation • Part 5. Computerized system validation • Part 6. Qualification of systems and equipment • Part 7. Non sterile product process validation

  3. Supplementary Training Modules on Good Manufacturing Practice Qualification of systems and equipmentPart 6 WHO Technical Report Series, No. 937, 2006. Annex 4. Appendix 6.

  4. Validation Objectives To discuss the principles of qualification of systems and equipment, with specific focus on: • The different stages of qualification • Requalification and • Qualification of “in use” systems and equipment

  5. Validation Principle • Systems and equipment: Appropriately designed, located, installed, operated and maintained • Critical systems and equipment – should be qualified • May include, where appropriate: • Water purification systems, air-handling systems, autoclaves, coating machines • Continued suitable performance needed • Why? To ensure batch-to-batch consistency 1.1 – 1.3

  6. Validation Scope • Guidelines describe the general aspects of qualification for systems and equipment • Normally qualification would be applicable to critical systems and equipment whose performance may have an impact on the quality of the product 2.1 – 2.2

  7. Validation General • Qualification policy for systems and equipment • To include instruments used in production and quality control • New systems and equipment: All stages of qualification applicable (DQ, IQ, OQ and PQ) • In some cases: Not all stages of qualification may be required • e.g. electrical supply systems 3.1 – 3.4

  8. Validation General (continued) • Systems: Qualified before equipment • Equipment: Qualified before routine use • Systems and equipment: Periodic requalification, as well as requalification after change • Certain stages done by the supplier or a third party • Maintain the relevant documentation, e.g. • standard operating procedures (SOPs), specifications and acceptance criteria, certificates and manuals 3.5 – 3.9

  9. Validation General (continued) • Qualification should be done in accordance with predetermined and approved qualification protocols • The results of the qualification should be recorded and reflected in qualification reports • The extent of the qualification should be based on the criticality of a system or equipment, e.g. • Blenders, autoclaves or computerized systems 3.10 – 3.11

  10. Validation Blender • Discuss the approach of qualification of a newly installed blender

  11. Validation Stages of qualification Design qualification Installation qualification Operational qualification Performance qualification 3.11

  12. Validation Stages of qualification Design qualification Installation qualification Operational qualification Change control Performance qualification 3.11.

  13. Validation Design qualification • User requirements should be considered when deciding on the specific design of a system or equipment • A suitable supplier should be selected for the appropriate system or equipment (approved vendor) 4.1 – 4.2

  14. Validation Installation qualification • Correct installation as per plan and protocol • Normally advised to prepare requirements for calibration, maintenance and cleaning at this stage • Identification and verification of all system elements, parts, services, controls, gauges and other components • Calibrate the measuring, control and indicating devices • against appropriate, traceable national or international standards 5.1 – 5.4

  15. Validation Installation qualification (2) • Documented records for the installation • installation qualification report • Indicate satisfactory installation • Include details, e.g. • The supplier and manufacturer • System or equipment name, model and serial number • Date of installation • Spare parts, relevant procedures and certificates 5.5

  16. Validation The handout shows a typical format for "An installation qualification protocol / report" • It reflects the minimum information that should be included • This is an example – and should be used as such • Specific formats need to be designed for a specific system or piece of equipment 5.5

  17. Validation Operational qualification • Systems and equipment should operate correctly – operation verified as in the qualification protocol • Studies on critical variable to include conditions encompassing upper and lower operating limits and circumstances (i.e. “worst case conditions”) • To include verification of operation of all system elements, parts, services, controls, gauges and other components 6.1 – 6.3

  18. Validation Operational qualification (2) • Documented records (Operational qualification report) • Finalize and approve SOP (operation) • Training of operators provided – training records • Systems and equipment released for routine use after completion of operational qualification, provided that: • All calibration, cleaning, maintenance, training and related tests and results were found to be acceptable 6.4 – 6.7

  19. Validation The handout shows a typical format for: "An operational qualification protocol / report" • It reflects the minimum information that should be included • This is an example – and should be used as such • Specific formats need to be designed for a specific system or piece of equipment 6.7

  20. Validation Performance qualification • Systems and equipment should consistently perform in accordance with design specifications – verified in accordance with a performance qualification protocol • Documented records – performance qualification report • Show satisfactory performance over a period of time • Manufacturers to justify the selected period 7.1 – 7.2

  21. Validation The handout shows a typical format for: "A performance qualification protocol / report" • It reflects the minimum information that should be included • This is an example – and should be used as such • Specific formats need to be designed for a specific system or piece of equipment 7.2

  22. Validation Defined schedule Periodic Requalification After change 8.1 – 8.3

  23. Validation Defined schedule Results of calibration maintenance, verification Frequency based on Factors Periodic Requalification After change Extent based on Risk assessment Part of Change control procedure 8.1 – 8.3

  24. Validation • What about "old manufacturers" who have not performed DQ, or IQ for existing, in-use systems and/or equipment?

  25. Validation Qualification of “in-use” systems and equipment • Data to support and verify the suitable operation and performance of systems and equipment • Should include operating parameters and limits for critical variables, calibration, maintenance and preventive maintenance, standard operating procedures (SOPs) and records 9.1 – 9.2

  26. Validation

  27. Validation • Group session

More Related