Phases Of HokuApps Rapid Application Development (RAD) Model
The Rapid Application Development Model • The overwhelming preference for the rapid application development model(RADM) when it comes to the creation of high-quality business and customer apps is self-explanatory. • Not only are apps that are made using RAD Model are conducive to higher productivity, but they are also built, tested, and deployed in considerably less time. • The reason the RAD Model works so well is the approach towards breaking a project into a number of phases that turns app development into an exact, scientific methodology geared for speed and profitability.
Phase One: Requirements Planning • This phase requires developers to identify and understand the following: • Overarching business strategy of the company • Issues that may arise in app development due to the existing software infrastructure • Business processes that the app must be designed to execute • This is usually done with Joint Requirements Planning (JRP) workshops which invite collaboration between IT and business executives.
Phase Two: User Design • This phase is for developers to explore business activities concerned with app development. This usually entails the following: • Analyzing relevant data • Conceptualizing a structure that is a combination of automates and manual operability • Generate a procedure that is in alignment with the particular scenario • Create a wo rk plan to implement the above • This part of the RADM usually makes use of Joint Application Design workshops with analyzing the business process and data and ends with crafting a comprehensive system area model.
Phase Three: Rapid Construction • For this phase, the RADM works on developing and testing software needed to initiate app creation in a way that achieves optimal performance. The following are most significant: • Finishing the system design that has begun to be created in the previous phase • Testing and finalizing the infrastructure necessary for the project, including workspace and workstations for developers • Creating documentation for operating the system • Generating relevant testing data to verify the capacities of the system • Producing a methodology for the transition of the application to production status
Phase Four: Transition • The final phase is concerned with shifting the application prototype into production lines. It involves the following: • Installing a production mechanism which causes minimal disruption to everyday business undertaking • Enhance the effectiveness of the aforementioned undertakings • Discerning possibilities for future improvements • Training users to operate the system before the app goes into production